Administrative Record File/Information Repository File (ARF/IRF)
Jump To:
Index of documents (PDF) contained in the ARF/IRF, which are available at the University of South Carolina Libraries – Aiken and Columbia on CD. This index is in PDF (portable document format) which requires Adobe Acrobat Reader software to be installed on your computer.
In 2020, SRS began posting PDFs of the ARF/IRF records on the SRS external website. In addition, this external website contains an Index of Documents (see link above). The index is currently dated 1/8/2026 and lists entries numbered from 000001 to 025261. The PDFs that are currently posted on the list below are dated from 10/1/2017 to 1/8/2026. The Index of Documents and PDFs will be updated quarterly. Historical PDFs will be added at a later date.
Disclaimer: The scanning process used to transfer documents into the portable document format may unintentionally create minor inaccuracies in the text. The viewer is warned that minor spelling errors may occur and numerical data may be missing decimal points or exponential values. Should the viewer have any questions regarding a particular section of text, an accurate hardcopy is always available from the Area Completion Project Document Control at the Savannah River Site, Luchelle Abney at (803) 952-7401.
Introduction
The Administrative Record File contains the documents and information considered or relied on in the selection of a response action and in controlling hazardous waste management activities. At the Savannah River Site, the Administrative Record File will fulfill the requirements of Section XXXIV, Administrative Record, of the Federal Facility Agreement (FFA).
An Administrative Record File for an individual waste unit is initiated upon the approval by the EPA-IV and the SCDHEC of an RFI/RI Work Plan. The File is compiled until the decision of the response action is chosen (the signing of the Record of Decision). At that time the Administrative Record File is finalized and is called the Administrative Record for that waste unit.
An Administrative Record serves two primary purposes. First, it is a vehicle for public participation in the selection of the response action. Section 113(k)(2) of CERCLA provides the public with an opportunity to participate in a response decision. The Administrative Record makes available the information considered or relied on in the selection and provides the opportunity for public involvement. Without opportunity for this involvement of interested persons, the limitation of court review solely to the Administrative Record can be challenged. Therefore, the Administrative Record will also record the public participation in the decision process and reflect the views of members of the public.
The second purpose of the Administrative Record is concerned with the presentation of evidence in the event of litigation. Judicial review of any issue concerning the adequacy of a response selection is limited to the Administrative Record. Under section 113(j)(2) of CERCLA, the trial court reviewing the selected response decision is limited the facts as set out in the Administrative Record. The Courts will not allow the use of discovery, hearings or additional fact findings unless the Administrative Record is found to be incomplete or poorly prepared. Provided the Administrative Record is adequate, the court will limit its review of the response decision made to the standard of arbitrary and capricious or otherwise not in accordance with the law. The Administrative Record should therefore chronicle the response decision process, whereby a judge could easily follow how and why a decision was made.
An Information Repository File contains information and documents that do not meet the definition of Administrative Record Files but that contain site and unit information, documents on site and unit activities, and general information.
Each entry in the Administrative Record File Index contains the following information:
- ARF/IRF Catalog Number – A unique number assigned to each document or piece of information. For those documents that are microfilmed, the number is stamped on the top of the document to aid in locating the document on the microfilm.
- Date –The date the document or information was issued.
- Document Number – Many of the documents published or produced by the SCDHEC, EPA and SRS are assigned unique numbers. If no document number has been assigned, it is so indicated by the entry of a unique sequence number known as the catalog number. This number is for electronic tracking only.
- Title –The title of the document, or a brief description of the contents.
- Author – The person or party responsible for the issuance or writing of the document or information
- Author Affiliation – The organization that the author works for or is affiliated with.
- Addressee – In most cases this entry will be blank except if the document is correspondence. The entry, in that case, will be the individual(s) to whom the correspondence was addressed.
- Addressee Affiliation – In most cases this entry will be blank except if the document is correspondence. The entry in that case will be the organization(s) to which the Addressee is affiliated.
- Appx. No. of Pages – The approximate number of pages the document contains.
- Document Type – Each document is categorized according to one of the following types of information:
- Community Involvement/Relations
- Correspondence
- Draft RFI/RI Work Plan
- Federal Facility Agreement
- Final RFI/RI Work Plan
- Guidance
- Interim Action Proposed Plan
- Meeting Minutes
- Proposed Plan
- Risk Assessment Document
- Site Evaluation Report
- Supporting Document
- Classification – The entry will contain one of the three following codes:
- U – The information is unclassified and available to the general public for viewing.
- CP – The information or document is considered confidential or privileged. The document may contain sensitive information and is not available to the general public. It may be included in an Administrative Record File as it was used to support the decision making, but cannot be made publicly available.
PDF Downloads
3870 records available.
| CATALOG NUMBER | DATE ↓ | DOCUMENT NUMBER | TITLE | AUTHOR | ADDRESSEE | DOC TYPE | APPX # OF PAGES | FILE TYPE | PDF FILE |
|---|---|---|---|---|---|---|---|---|---|
| 023748 | 06/22/2022 | SRMC-ESH-2022-00063 | SRMC SUBMITTAL OF ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM REPORT | J. CANTRELL | R.H. POPE/ C.RIPPY | CORRESPONDENCE | 2 | IRF | ARF-023748.pdf |
| 023745 | 06/22/2022 | IACD-22-148 | DOE SUBMITTAL OF THE CERTIFIED CLEAN COPY OF THE RESOURCE CONSERVATION AND RECOVERY ACT FACILITY INVESTIGATION/REMEDIAL INVESTIGATION REPORT WITH BASELINE RISK ASSESSMENT AND CORRECTIVE MEASURES STUDY/ FESABILITY STUDY FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2021-00548, REVISION 1, APRIL 2022) SEMS NUMBER: 93 | B | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023745.pdf |
| 023788 | 06/21/2022 | PC-2022-00023 | COMPLETED POST CLOSURE MAINTENANCE REGISTER FOR P-AREA OPERABLE UNIT ASH BASIN 188-P AND P-007 OUTFALL | C. CARTER | SUPPORTING DOCUMENT | 1 | IRF | ARF-023788.pdf | |
| 023787 | 06/21/2022 | PC-2022-00046 | COMPLETED POST CLOSURE MAINTENANCE REGISTER FOR GUNSITE 012 OPERABLE UNIT | C. CARTER | SUPPORTING DOCUMENT | 1 | IRF | ARF-023787.pdf | |
| 023783 | 06/21/2022 | ER-IDS-019-014 | MISCELLANEOUS CHEMICAL BASIN (BLDG. 731-4A) FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 6 | IRF | ARF-023783.pdf | |
| 023763 | 06/21/2022 | SRNS-OS-2022-00207 | SCDHEC APPROVAL OF THE DECOMMISSIONING PROJECT FINAL REPORT (DPFR): D-AREA MAINTENANCE BUILDING, BUILDING 704-7D (V-PCOR-D-00064, REVISION 1, MAY 17, 2022) AND RESPONSE TO COMMENT ON THE REV. 0 REPORT; COVER LETTER DATED MAY 26, 2022 | G. OQUINN | B. HENNESSEY | CORRESPONDENCE | 1 | IRF | ARF-023763.pdf |
| 023744 | 06/21/2022 | IACD-22-154 | DOE SUBMITTAL OF THE FISCAL YEAR (FY) 2022 BUDGET ALLOTMENT FOR ENVIRONMENTAL COMPLIANCE & AREA COMPLETION PROJECTS AND FEDERAL FACILITY AGREEMENT REVISION 0 APPENDIX D FOR FY2022 (PRINT DATE: 06/17/2022) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 8 | IRF | ARF-023744.pdf |
| 023785 | 06/20/2022 | PC-2021-00065 | COMPLETED POST CLOSURE MAINTENANCE REGISTER FOR SILVERTONE ROAD WASTE SITE (731-3A) | C. CARTER | SUPPORTING DOCUMENT | 1 | IRF | ARF-023785.pdf | |
| 023784 | 06/20/2022 | PC-2021-00090 | COMPLETED POST CLOSURE MAINTENANCE REGISTER FOR M-AREA INACTIVE PROCESS SEWER LINE (MIPSL) OPERABLE UNIT (081-M) | C. CARTER | SUPPORTING DOCUMENT | 1 | IRF | ARF-023784.pdf | |
| 023782 | 06/20/2022 | ER-IDS-019-025 | L-REACTOR SEEPAGE BASIN (BLDG. 904-64G) FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 4 | IRF | ARF-023782.pdf | |
| 023781 | 06/17/2022 | ER-IDS-019-030 | P-AREA BURNING RUBBLE PIT (BLDG. 131-P) FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 5 | IRF | ARF-023781.pdf | |
| 023780 | 06/16/2022 | ER-IDS-019-056 | HEAVY WATER COMPONENT TEST REACTOR (HWCTR) (770U) FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 4 | IRF | ARF-023780.pdf | |
| 023740 | 06/16/2022 | SRNS-OS-2022-00199 | EPA COMMENTS ON THE TREATABILITY STUDY DATA REPORT FOR THE GROUNDWATER INJECTION AND DISCHARGE CANAL NEUTRALIZATION AT THE D-AREA GROUNDWATER OPERABLE UNIT, 2021 DATA AND INFORMATION, SEMS NUMBER: 63 (SRNS-TR-2022-00026, REVISION 0, JANUARY 2022) | D. LLOYD | B. HENNESSEY | CORRESPONDENCE | 2 | IRF | ARF-023740.pdf |
| 023739 | 06/16/2022 | SRNS-RP-2022-00342, REV. 0 | EFFECTIVENESS MONITORING REPORT FOR THE MONITORED NATURAL ATTENUATION (MNA) AT THE CHEMICALS, METALS, AND PESTICIDES (CMP) PITS OPERABLE UNIT (OU) (U) APRIL 2021 THROUGH MARCH 2022 (SRNS-RP-2022-00342, REVISION 0, JUNE 2022) SEMS NUMBER: 24 | SRNS | SUPPORTING DOCUMENT | 363 | ARF | ARF-023739.pdf | |
| 023738 | 06/16/2022 | IACD-22-149 | DOE SUBMITALL OF EFFECTIVENESS MONITORING REPORT FOR THE MONITORED NATURAL ATTENUATION (MNA) AT THE CHEMICALS, METALS, AND PESTICIDES (CMP) PITS OPERABLE UNIT (OU) (U) APRIL 2021 THROUGH MARCH 2022 (SRNS-RP-2022-00342, REVISION 0, JUNE 2022) SEMS NUMBER: 24 | B. HENNESSEY | S. FULMER | CORRESPONDENCE | 2 | IRF | ARF-023738.pdf |
| 023747 | 06/15/2022 | SRNS-OS-2022-00200 | SCDHEC COMMENTS ON THE DECOMMISSIONING PROJECT FINAL REPORT (DPFR): CHEMICAL FEED FACILITY, BUILDING 607-14D (V-PCOR-D-00074, REVISION 0, MARCH 21, 2022); COVER LETTER DATED APRIL 18, 2022 | G. OQUIN | B. HENNESSEY | CORRESPONDENCE | 2 | IRF | ARF-023747.pdf |
| 023786 | 06/14/2022 | PC-2021-00085 | COMPLETED POST CLOSURE MAINTENANCE REGISTER FOR D-AREA COAL PILE RUNOFF BASIN (489-D NORTH) | C. CARTER | SUPPORTING DOCUMENT | 1 | IRF | ARF-023786.pdf | |
| 023779 | 06/14/2022 | ER-IDS-019-072 | EARLY ACTION D-AREA OPERABLE UNIT (EADAOU) FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 3 | IRF | ARF-023779.pdf | |
| 023778 | 06/13/2022 | ER-IDS-019-071 | D-AREA BUBBLE TOWER COVER FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 4 | IRF | ARF-023778.pdf | |
| 023777 | 06/10/2022 | ER-IDS-019-026 | R-BINGHAM PUMP OUTAGE PIT AND UNKNOWN PITS OPERABLE UNIT FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 4 | IRF | ARF-023777.pdf | |
| 023727 | 06/09/2022 | IACD-22-150 | DOE SUBMITTAL LETTER FOR THE THIRTY (30) DAY EXTENSION NOTIFICATION FOR THE SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH GEOSYNTHETIC OR STABALIZATION/SOLIDIFICATION COVER SYSTEMS (U) AIKEN, SOUTH CAROLINA (SRNS-RP-2021-04229, REVISION 1) AND SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE REVISION 0 DOCUEMTN, SEMS NUMBER: 00 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023727.pdf |
| 023729 | 06/09/2022 | SRNS-OS-2022-00191 | SCDHEC APPROVAL OF SAVANNAH RIVER SITE'S RESPONSE TO THE REGULATORY COMMENT ON THE ADMINISTRATIVE RECORD FILE / INFORMATION REPOSITORY FILE ANNUAL INDICES UPDATE {SRNS-RP-2021-05286, NOVEMBER 2021) RECEIVED JUNE 3, 2022 | S. FULMER | B. HENNESSEY | CORRESPONDENCE | 1 | IRF | ARF-023729.pdf |
| 023737 | 06/08/2022 | ER-IDS-019-079 | F-AREA INACTIVE PROCESS SEWER LINE (FIPSL) FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 2 | IRF | ARF-023737.pdf | |
| 023725 | 06/01/2022 | IACD-22-147 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSE TO THE REGULATORY COMMENT ON THE ADMINISTRATIVE RECORD FILE / INFORMATION REPOSITORY FILE ANNUAL INDICES UPDATE (SRNS-RP-2021-05286, NOVEMBER 2021) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 3 | IRF | ARF-023725.pdf |
| 023726 | 06/01/2022 | SRNS-RP-2022-00366 | THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR ACTION MEMORANDUM AND RESPONSIVENESS SUMMARY ISSUED FOR THE NON-TIME CRITICAL REMOVAL ACTION FOR THE F-AREA MATERIAL STORAGE BUILDING (235-F) (VOLUME 34, NUMBER 2, DATED JUNE 1, 2022) | SRNS | COMMUNITY INVOLVEMENT | 3 | IRF | ARF-023726.pdf | |
| 023812 | 06/01/2022 | SRNS-RP-2019-00764 | SCOPING SUMMARY FOR THE ECODS N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (FORD BUILDING) OPERABLE UNIT (U), (SRNS-RP-2019-00764, JUNE 2022 FINAL) SEMS NUMBER: 93 | SRNS | SUPPORTING DOCUMENT | 34 | ARF | ARF-023812.pdf | |
| 023753 | 06/01/2022 | SRNS-RP-2022-00071 | REMOVAL ACTION REPORT FOR THE 484-17D COAL STORAGE AREA (U) (SRNS-RP-2022-00071, REVISION 0, JUNE 2022) SEMS NUMBER: 63 | SRNS | REMOVAL ACTION | 74 | ARF | ARF-023753.pdf | |
| 023743 | 05/31/2022 | SRNS-J2000-2022-00342 | READING ROOM: ACTION MEMORANDUM AND RESPONSIVENESS SUMMARY FOR THE NON-TIME CRITICAL REMOVAL ACTION FOR THE F-AREA MATERIALSTORAGE BUILDING (235-F) | D. MCDANIEL | READING ROOM | CORRESPONDENCE | 19 | IRF | ARF-023743.pdf |
| 023721 | 05/26/2022 | IACD-22-146 | DOE SUBMITTAL OF THE DECOMMISSIONING PROJECT FINAL REPORT FOR BUILDING 704-7D, D-AREA MAINTENANCE BUILDING (V-PCOR-D-00064, REVISION 1, MAY 17, 2022) AND SAVANNAH RIVER SITE'S RESPONSE TO THE REGULATORY COMMENT ON THE REVISION 0 REPORT | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 4 | IRF | ARF-023721.pdf |
| 023723 | 05/26/2022 | SRNS-OS-2022-00182 | SCDHEC COMMENTS ON THE TREATABILITY STUDY DATA REPORT FOR GROUNDWATER INJECTION AND DISCHARGE CANAL NEUTRALIZATION AT THE D-AREA GROUNDWATER OPERABLE UNIT (OU) (U), SEMS NUMBER: 63 (SRNS-TR-2022-00026, REVISION 0, JANUARY 2022) RECEIVED FEBRUARY 1, 2022 | S. FULMER | B. HENNESSEY | CORRESPONDENCE | 2 | IRF | ARF-023723.pdf |
| 023730 | 05/26/2022 | ER-IDS-019-070 | GUN SITE 012 OPERABLE UNIT FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 4 | IRF | ARF-023730.pdf | |
| 023724 | 05/24/2022 | SRNS-J2600-2022-00251 | MEETING MINUTES: F-AREA ASH LANDFILL PERMITTING IN SUPPORT OF THE REGULATORY STRATEGY FOR THE SRS ASH / COAL FINES WASTE UNITS, MAY 23, 2022 | J. BURCH | CORRESPONDENCE | 2 | IRF | ARF-023724.pdf | |
| 023720 | 05/20/2022 | SRNS-OS-2022-00179 | EPA COMMENTS ON THE 2021 ANNUAL GROUNDWATER MONITORING REPORT FOR THE F?AND H-AREA RADIOACTIVE LIQUID WASTE TANK FARMS (U), SEMS NUMBER: 23 & 89, SRNS-RP- 2022-00076, REVISION 0, MARCH 2022 | J. RICHARDS | B. HENNESSEY | CORRESPONDENCE | 2 | IRF | ARF-023720.pdf |
| 023731 | 05/19/2022 | ER-IDS-019-062 | CHEMICAL, METAL, AND PESTICIDE PITS (CMPP) FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 4 | IRF | ARF-023731.pdf | |
| 023719 | 05/19/2022 | SRNS-OS-2022-00178 | SCDHEC APPROVAL OF RESOURCE CONSERVATION AND RECOVERY ACT FACILITY INVESTIGATION/REMEDIAL INVESTIGATION REPORT WITH BASELINE RISK ASSESSMENT AND CORRECTIVE MEASURES STUDY/FEASIBILITY STUDY FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) SEMS NUMBER: 93 (SRNS-RP-2021-00548, REVISION 1 REDLINE, APRIL 2022) RECEIVED APRIL 25, 2022 | S. FULMER | B. HENNESSEY | CORRESPONDENCE | 1 | IRF | ARF-023719.pdf |
| 023718 | 05/19/2022 | SRNS-OS-2022-00177 | SCDHEC RESPONSE TO FEDERAL FACILITY AGREEMENT (FFA) APPENDIX L COMMITMENT TO "START DISCUSSION FOR RENEGOTIATING LIQUID WASTE (LW) TANK COMMITMENTS WITHIN 30 DAYS OF ISSUING THE NOTICE TO PROCEED" CORRESPONDENCE DATED MAY 10, 2022, RECEIVED MAY 11, 2022 | S. FULMER | B. HENNESSEY | CORRESPONDENCE | 2 | IRF | ARF-023718.pdf |
| 023717 | 05/19/2022 | IACD-22-145 | DOE SUBMITTAL OF ACTION MEMORANDUM AND RESPONSIVENESS SUMMARY FOR THE NON-TIME CRITICAL REMOVAL ACTION FOR THE F-AREA MATERIAL STORAGE BUILDING (235-F) | J. MCMILLIAN | J. RICHARDS | CORRESPONDENCE | 4 | IRF | ARF-023717.pdf |
| 023733 | 05/18/2022 | ER-IDS-019-022 | M-AREA HAZARDOUS WASTE MANAGEMENT FACILITY {BLDG. 904-51G) FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 6 | IRF | ARF-023733.pdf | |
| 023732 | 05/18/2022 | ER-IDS-019-020 | METALLURGICAL LABORATORY HAZARDOUS WASTE MANAGEMENT FACILITY (HWMF) POST CLOSURE FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 5 | IRF | ARF-023732.pdf | |
| 023734 | 05/17/2022 | ER-IDS-019-028 | SANITARY LANDFILL (BLDG. 740-G) FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 6 | IRF | ARF-023734.pdf | |
| 023722 | 05/17/2022 | V-PCOR-D-00064 | DECOMMISSIONING PROJECT FINAL REPORT FOR BUILDING 704-7D, D-AREA MAINTENANCE BUILDING (V-PCOR-D-00064, REVISION 1, MAY 17, 2022) | B. ZAWACKI | DECOMMISSION PROJECT FINAL REPORTS | 13 | ARF | ARF-023722.pdf | |
| 023716 | 05/16/2022 | SRNS-OS-2022-00176 | EPA APPROVAL OF THE RCRA FACILITY INVESTIGATION/REMEDIAL INVESTIGATION WORK PLAN FOR D-AREA GROUNDWATER OPERABLE UNIT (D-AREA UPGRADIENT SOURCES) (U), SEMS NUMBER: 63 (SRNS-RP-2019-00394, REVISION 1 REDLINE, APRIL 2022) AND SAVANNAH RIVER SITE'S RESPONSES TO EPA'S COMMENTS ON THE REVISION 0 DOCUMENT | D. LLOYD | B. HENNESSEY | CORRESPONDENCE | 1 | IRF | ARF-023716.pdf |
| 023715 | 05/16/2022 | SRNS-OS-2022-00175 | EPA APPROVAL OF THE RESPONSES TO COMMENTS AND THE R1 REDLINE OF THE RCRA FACILITY INVESTIGATION/REMEDIAL INVESTIGATION REPORT WITH BASELINE RISK ASSESSMENT AND CORRECTIVE MEASURES STUDY/FEASIBILITY STUDY FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) SEMS NUMBER: 93 SRNS-RP-2021-00548, REVISION 1 REDLINE, APRIL 2022 SAVANNAH RIVER SITE, AIKEN, SOUTH CAROLINA | J. RICHARDS | B. HENNESSEY | CORRESPONDENCE | 1 | IRF | ARF-023715.pdf |
| 023714 | 05/15/2022 | SRNS-OS-2022-00174 | EPA APPROVAL OF THE SAVANNAH RIVER SITE'S RESPONSES TO EPA'S COMMENTS ON THE 2020 GROUNDWATER MONITORING REPORT FOR THE D-AREA GROUNDWATER OPERABLE UNIT (U), SEMS NUMBER: 63 (SRNS-RP-2021-03748, REVISION 0, JULY 2021) | D. LLOYD | B. HENNESSEY | CORRESPONDENCE | 1 | IRF | ARF-023714.pdf |
| 023713 | 05/15/2022 | SRNS-OS-2022-00173 | EPA APPROVAL OF THE SAVANNAH RIVER SITE'S RESPONSES TO EPA'S COMMENTS ON THE CALENDAR YEAR 2020 GROUNDWATER MIXING ZONE LETTER REPORT FOR D-AREA OIL SEEPAGE BASIN OPERABLE UNIT (631-G), SEMS NUMBER: 27 (IACD-21-149, DATED JULY 19, 2021) | D. LLOYD | B. HENNESSEY | CORRESPONDENCE | 1 | IRF | ARF-023713.pdf |
| 023712 | 05/15/2022 | SRNS-OS-2022-00172 | EPA APPROVAL OF THE DECOMMISSIONING PROJECT FINAL REPORT FOR BUILDING 483-3D, ELECTRICAL CONTROL BUILDING (V-PCOR-D-00067, REVISION 0, FEBRUARY 22, 2022) | D. LLOYD | B. HENNESSEY | CORRESPONDENCE | 1 | IRF | ARF-023712.pdf |
| 023711 | 05/13/2022 | SRNS-OS-2022-00171 | SCDHEC COMMENTS ON THE RFI/RI WORK PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE L-3 (NBN), L-AREA RUBBLE PIT (131-1L), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT, SEMS NUMBER: 91 (SRNS-RP-2021-05602, REVISION 0, FEBRUARY 2022) RECEIVED FEBRUARY 17, 2022 | H. CATHCART | B. HENNESSEY | CORRESPONDENCE | 4 | IRF | ARF-023711.pdf |
| 023709 | 05/12/2022 | SRNS-OS-2022-00168 | SCDHEC APPROVAL OF THE SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE DRAFT ACTION MEMORANDUM FOR THE NON-TIME CRITICAL REMOVAL ACTION FOR THE 235-F BUILDING (IACD-22-130, DATED FEBRUARY 28, 2022) RECEIVED APRIL 14, 2022 | S. FULMER | B. HENNESSEY | CORRESPONDENCE | 1 | IRF | ARF-023709.pdf |
| 023708 | 05/12/2022 | SRNS-OS-2022-00167 | SCDHEC APPROVAL OF THE RCRA FACILITY INVESTIGATION/REMEDIAL INVESTIGATION WORK PLAN FOR D-AREA GROUNDWATER OPERABLE UNIT (D-AREA UPGRADIENT SOURCES) (U), SEMS NUMBER: 63 (SRNS-RP-2019-00394, REVISION 1 REDLINE, APRIL 2022) RECEIVED APRIL 14, 2022 | S. FULMER | B. HENNESSEY | CORRESPONDENCE | 1 | IRF | ARF-023708.pdf |
| 023728 | 05/11/2022 | ER-IDS-019-018 | MIXED WASTE MANAGEMENT FACILITY POST CLOSURE INSPECTION, BLDG. 643-28E AND LOW-LEVEL RADIOACTIVE WASTE DISPOSAL FACILITY INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 5 | IRF | ARF-023728.pdf | |
| 023710 | 05/11/2022 | SRNS-OS-2022-00166 | EPA CONCURRENCE OF THE RESPONSES TO COMMENT ON THE DRAFT ACTION MEMO FOR THE NON-TIME CRITICAL REMOVAL ACTION FOR THE 235-F [IACD-22-130], FEB 28, 2022 | J. RICHARDS | B. HENNESSEY | CORRESPONDENCE | 1 | IRF | ARF-023710.pdf |
| 023705 | 05/11/2022 | IACD-22-144 | DOE SUBMITTAL OF THE PERFORMANCE EVALUATION REPORT FOR THE A-AREA BURNING/RUBBLE PITS (731-A, -1A) AND RUBBLE PIT (731-2A) AND THE MISCELLANEOUS CHEMICAL BASIN/METALS BURNING PIT (731-4A, -5A) OPERABLE UNIT – JANUARY THROUGH DECEMBER 2021 (U) (SRNS-RP-2022-00178, REVISION 0, MAY 2022) SEMS NUMBER: 28 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023705.pdf |
| 023704 | 05/10/2022 | WDPD-22-26 | DOE SUBMITAL OF FEDERAL FACILITY AGREEMENT (FFA) APPENDIX L COMMITMENT TO "START DISCUSSIONS FOR RENEGOTIATING LIQUID WASTE (LW) TANK COMMITMENTS WITHIN 30 DAYS OF ISSUING THE NOTICE TO PROCEED". | B. HENNESSEY | S. FULMER | CORRESPONDENCE | 7 | IRF | ARF-023704.pdf |
| 023736 | 05/09/2022 | ER-IDS-019-016 | C-AREA BURNING RUBBLE PIT (BLDG. 131-C) FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 5 | IRF | ARF-023736.pdf | |
| 023735 | 05/05/2022 | ER-IDS-019-023 | INTERIM SANITARY LANDFILL (BLDG. 740-100) FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 6 | IRF | ARF-023735.pdf | |
| 023703 | 05/05/2022 | SRNS-OS-2022-00162 | SCDHEC APPROVAL OF THE SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE EFFECTIVENESS MONITORING REPORT (EMR) FOR THE P-AREA GROUNDWATER (PAGW) OPERABLE UNIT (OU) ZERO VALENT IRON PERMEABLE REACTIVE BARRIER (ZVI-PRB) REMOVAL ACTION (U) MARCH 2019 THROUGH MARCH 2021, SEMS NUMBER: 81 (SRNS-RP-2021-00016, REVISION 0, SEPTEMBER 2021) RECEIVED APRIL 8, 2022 | S. FULMER | B. HENNESSEY | CORRESPONDENCE | 1 | IRF | ARF-023703.pdf |
| 023699 | 05/05/2022 | IACD-22-143 | DOE SUBMITTAL OF THE SECOND EARLY ACTION POST-CONSTRUCTION REPORT (EAPCR) FOR THE D-AREA OPERABLE UNIT (U) (SRNS-RP-2022-00064, REVISION 0, MAY 2022) SEMS NUMBER: 63 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023699.pdf |
| 023682 | 05/04/2022 | SRNS-OS-2022-00161 | SCDHEC CONDITIONAL APPROVAL OF THE SAVANNAH RIVER SITE'S RESPONSES TO COMMENTS ON THE 2020 GROUNDWATER MONITORING REPORT FOR THE D-AREA GROUNDWATER OPERABLE UNIT (U), SEMS NUMBER: 63 (SRNS-RP-2021-03748, REVISION 0, JULY 2021) RECEIVED APRIL 6, 2022 | S. FULMER | B. HENNESSEY | CORRESPONDENCE | 1 | IRF | ARF-023682.pdf |
| 023681 | 05/04/2022 | SRNS-OS-2022-00160 | SCDHEC APPROVAL OF THE SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON CALENDAR YEAR 2020 D-AREA OIL SEEPAGE BASIN OPERABLE UNIT (631-G) GROUNDWATER MIXING ZONE LETTER REPORT, SEMS NUMBER: 27 (IACD-21-149, DATED JULY 19, 2021) RECEIVED APRIL 6, 2022 | S. FULMER | B. HENNESSEY | CORRESPONDENCE | 1 | IRF | ARF-023681.pdf |
| 023706 | 05/01/2022 | SRNS-RP-2022-00178 | PERFORMANCE EVALUATION REPORT FOR THE A-AREA BURNING/RUBBLE PITS (731-A, -1A) AND RUBBLE PIT (731-2A) AND THE MISCELLANEOUS CHEMICAL BASIN/METALS BURNING PIT (731-4A, -5A) OPERABLE UNIT – JANUARY THROUGH DECEMBER 2021 (U) (SRNS-RP-2022-00178, REVISION 0, MAY 2022) SEMS NUMBER: 28 | SRNS | SUPPORTING DOCUMENT | 54 | ARF | ARF-023706.pdf | |
| 023700 | 05/01/2022 | SRNS-RP-2022-00064 | SECOND EARLY ACTION POST-CONSTRUCTION REPORT (EAPCR) FOR THE D-AREA OPERABLE UNIT (U) (SRNS-RP-2022-00064, REVISION 0, MAY 2022) SEMS NUMBER: 63 | SRNS | PCR/CMIR/RACR | 44 | ARF | ARF-023700.pdf | |
| 023707 | 04/28/2022 | SRNS-OS-2022-00153 | SCDHEC APPROVAL OF THE DECOMMISSIONING PROJECT FINAL REPORT (DPFR): BUILDING 483-3D, ELECTRICAL CONTROL BUILDING (V-PCOR-D-00067, REVISION 0, FEBRUARY 22, 2022), COVER LETTER DATED MARCH 3, 2022 | G. OQUINN | B. HENNESSEY | CORRESPONDENCE | 2 | IRF | ARF-023707.pdf |
| 023689 | 04/28/2022 | PC-2021-00102 | POST CLOSURE MAINTENANCE REGISTER – R-AREA BURNING/RUBBLE PITS AND RUBBLE PILE OPERABLE PIT REMEDIATION FIELD INSPECTION CHECKLIST | G. JOYNER | SUPPORTING DOCUMENT | 1 | IRF | ARF-023689.pdf | |
| 023679 | 04/28/2022 | SRNS-OS-2022-00152 | SCDHEC COMMENTS ON THE 2021 ANNUAL GROUNDWATER MONITORING REPORT FOR THE F- AND H-AREA RADIOACTIVE LIQUID WASTE TANK FARMS (U), SEMS NUMBERS: 23 & 89 (SRNS-RP-2022-00076, REVISION 0, MARCH 2022) RECEIVED MARCH 24, 2022, ELECTRONICALLY | S. FULMER | J. CANTRELL | CORRESPONDENCE | 2 | IRF | ARF-023679.pdf |
| 023690 | 04/25/2022 | ER-IDS-019-021 | H-AREA HAZARDOUS WASTE MANAGEMENT FACILITY (BLDGS. 904-44G, 904-45G, 904-46G AND 904-56G) FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 6 | IRF | ARF-023690.pdf | |
| 023691 | 04/21/2022 | ER-IDS-019-074 | C-AREA REACTOR OPERABLE UNIT FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 3 | IRF | ARF-023691.pdf | |
| 023668 | 04/21/2022 | IACD-22-139 | DOE SUBMITTAL OF THE RESOURCE CONSERVATION AND RECOVERY ACT FACILITY INVESTIGATION/REMEDIAL INVESTIGATION REPORT WITH BASELINE RISK ASSESSMENT AND CORRECTIVE MEASURES STUDY/FEASIBILITY STUDY FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2021-00548, APRIL 2022, REVISION 1 REDLINE) AND SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE REVISION 0 DOCUMENT, SEMS NUMBER: 93 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 51 | IRF | ARF-023668.pdf |
| 023670 | 04/21/2022 | SRNS-OS-2022-00144 | SCDHEC COMMENTS ON THE CALENDAR YEAR (CY) 2021 ANNUAL REPORT STATUS OF F/H AREA RADIOACTIVE LIQUID WASTE TANKS BEING REMOVED FROM SERVICE, SEMS NUMBERS: 23 AND 89 (SRR-ESH-2022-00019, REVISION 0, MARCH 2022) RECEIVED MARCH 8, 2022 | S. SULMER | B. HENNESSEY | CORRESPONDENCE | 2 | IRF | ARF-023670.pdf |
| 023692 | 04/20/2022 | ER-IDS-019-012 | K-AREA REACTOR SEEPAGE BASIN (BLDG. 904-65G) FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 5 | IRF | ARF-023692.pdf | |
| 023799 | 04/19/2022 | SRNS-RP-2022-00205 | PROPOSED CORE TEAM REMEDIAL ACTIONS AND REGULATORY STRATEGY FOR REMAINING SRS ASH/COAL FINES WASTE UNITS (U) | SRNS | SUPPORTING DOCUMENT | 27 | IRF | ARF-023799.pdf | |
| 023693 | 04/19/2022 | ER-IDS-019-057 | M-AREA OPERABLE UNIT (MAOU) FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 5 | IRF | ARF-023693.pdf | |
| 023694 | 04/18/2022 | ER-IDS-019-013 | C-REACTOR SEEPAGE BASIN (BLDGS. 904-66G, 904-67G AND 904-68G) FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 4 | IRF | ARF-023694.pdf | |
| 023666 | 04/18/2022 | IACD-22-142 | DOE SUBMITTAL OF THE DECOMMISSIONING PROJECT FINAL REPORT BUILDING 607-14D, CHEMICAL FEED FACILITY (V-PCOR-D-00074, REVISION 0, MARCH 31, 2022) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023666.pdf |
| 023662 | 04/13/2022 | IACD-22-138 | DOE SUBMITTAL FOR THE RCRA FACILITY INVESTIGATION / REMEDIAL INVESTIGATION (RFI/RI) WORK PLAN FOR THE D-AREA GROUNDWATER OPERABLE UNIT (D-AREA UPGRADIENT SOURCES) (U) (SRNS-RP-2019-00394, REVISION 1 REDLINE, APRIL 2022) AND SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE REVISION 0 DOCUMENT, SEMS NUMBER: 63 | B. HENNESSEY | J. RICHARDS. S. FULMER | CORRESPONDENCE | 14 | IRF | ARF-023662.pdf |
| 023664 | 04/13/2022 | IACD-22-141 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE DRAFT ACTION MEMORANDUM FOR THE NON-TIME CRITICAL REMOVAL ACTION FOR THE 235-F BUILDING (IACD-22-130, DATED FEBRUARY 28, 2022) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 6 | IRF | ARF-023664.pdf |
| 023661 | 04/12/2022 | SRNS-OS-2022-00132 | EPA COMMENTS ON THE RCRA FACILITY INVESTIGATION/REMEDIAL INVESTIGATION WORK PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE L-3 (NBN), L-AREA RUBBLE PIT (131-1L), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT (U) SEMS NUMBER: 91 SRNS-RP-2021-05602, REVISION 0, FEBRUARY 2022 | J. RICHARDS | B. HENNESSEY | CORRESPONDENCE | 3 | IRF | ARF-023661.pdf |
| 023695 | 04/12/2022 | ER-IDS-019-037 | H-AREA INACTIVE PROCESS SEWER FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 4 | IRF | ARF-023695.pdf | |
| 023660 | 04/11/2022 | SRNS-OS-2022-00130 | EPA APPROVAL OF THE RESPONSES TO COMMENTS FOR THE EFFECTIVENESS MONITORING REPORT (EMR) FOR THE P-AREA GROUNDWATER (PAGW) ZERO VALENT IRON PERMEABLE REACTIVE BARRIER (ZVI-PRB) REMOVAL ACTION OPERABLE UNIT (OU)(U), MARCH 2019 THROUGH MARCH 2021 DATA, SEMS NUMBER: 81, SRNS-RP-2021-00016, REVISION 0. SEPT 2021, SAVANNAH RIVER SITE, AIKEN, SOUTH CAROLINA | J. RICHARDS | B. HENNESSEY | CORRESPONDENCE | 1 | IRF | ARF-023660.pdf |
| 023696 | 04/11/2022 | ER-IDS-019-009 | F-AREA RETENTION BASIN (BLDG. 281-3F) FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 4 | IRF | ARF-023696.pdf | |
| 023657 | 04/07/2022 | IACD-22-140 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE EFFECTIVENESS MONITORING REPORT (EMR) FOR THE P-AREA GROUNDWATER (PAGW) OPERABLE UNIT (OU) ZERO VALENT IRON PERMEABLE REACTIVE BARRIER (ZVI-PRB) REMOVAL ACTION (U) MARCH 2019 THROUGH MARCH 2021 (SRNS-RP-2021-00016, REVISION 0, SEPTEMBER 2021) SEMS NUMBER: 81 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 18 | IRF | ARF-023657.pdf |
| 023658 | 04/06/2022 | SRNS-OS-2022-00116 | SCDHEC COMMENT ON THE SAVANNAH RIVER SITE'S (SRS) RESPONSES TO THE REGULATORY COMMENTS ON THE DECOMMISSIONING PROJECT FINAL REPORTS (DPFRS) FOR BUILDING 480-3D, MAINTENCE FIELD OFFICE AND SHOP (V-PCOR-D-00062, REV.0, JULY 5, 2021); BUILDING 717-3D, D-AREA WELDING SHOP (V-PCOR-D-00063, REV.0, JULY 8, 2021); BUILDING 704-7D, D-AREA MAINTENANCE BUILDING (V-PCOR-D-00064, REV.0, JULY 12, 2021); BUILDING 710-16D, STORAGE BUILDING (V-PCOR-D-00065, REV.0, JULY 8, 2021); AND BUILDINGS 485-D AND 482-2D, D-AREA COOLING TOWER AND SWITCHGEAR BUILDING (V-PCOR-D-00061, REV.0, NOVEMBER 2, 2021), COVER LETTER DATED FEBRUARY 24, 2022 | G. O’QUINN | B. HENNESSEY | CORRESPONDENCE | 1 | IRF | ARF-023658.pdf |
| 023659 | 04/06/2022 | SRNS-OS-2022-00129 | EPA LETTER REGARDING THE REMEDIAL ACTION COMPLETION FOR THE M-AREA OPERABLE UNIT, SEMS NUMBER: 92 | G. ADAMS | B. HENNESSEY | CORRESPONDENCE | 1 | IRF | ARF-023659.pdf |
| 023697 | 04/06/2022 | ER-IDS-019-019 | F-AREA HAZARDOUS WASTE MANAGEMENT FACILITY (BLDGS. 904-41G, 904-42G, & 904-43G) FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 5 | IRF | ARF-023697.pdf | |
| 023656 | 04/05/2022 | SRNS-RP-2022-00149 | THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR REMOVAL SITE EVALUATION REPORT/ENGINEERING EVALUATION/COST ANALYSIS (RSER/EE/CA) FOR THE F-AREA MATERIAL STORAGE BUILDING (235-F) AVAILABLE FOR PUBLIC COMMENT (VOLUME 34, NUMBER 1, DATED APRIL 5, 2022 | SRNS | COMMUNITY INVOLVEMENT | 3 | IRF | ARF-023656.pdf | |
| 023680 | 04/05/2022 | SRNS-OS-2022-00159 | THE AUGUSTA CHRONICLE AFFIDAVIT OF PUBLICATION FOR THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR REMOVAL SITE EVALUATION REPORT/ENGINEERING EVALUATION/COST ANALYSIS (RSER/EE/CA) FOR THE F-AREA MATERIAL STORAGE BUILDING (235-F) AVAILABLE FOR PUBLIC COMMENT | SRNS | COMMUNITY INVOLVEMENT | 2 | IRF | ARF-023680.pdf | |
| 023653 | 04/04/2022 | IACD-22-136 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE 2020 GROUNDWATER MONITORING REPORT FOR THE D-AREA GROUNDWATER OPERABLE UNIT (U) (SRNS-RP-2021-03748, REVISION 0, JULY 2021) SEMS NUMBER: 63 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 50 | IRF | ARF-023653.pdf |
| 023654 | 04/04/2022 | IACD-22-137 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE CALENDAR YEAR 2020 D-AREA OIL SEEPAGE BASIN OPERABLE UNIT (631-G) GROUNDWATER MIXING ZONE LETTER REPORT, SEMS NUMBER: 27 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 7 | IRF | ARF-023654.pdf |
| 023663 | 04/01/2022 | SRNS-RP-2019-00394 | RCRA FACILITY INVESTIGATION / REMEDIAL INVESTIGATION (RFI/RI) WORK PLAN FOR THE D-AREA GROUNDWATER OPERABLE UNIT (D-AREA UPGRADIENT SOURCES) (U) (SRNS-RP-2019-00394, REVISION 1 REDLINE, APRIL 2022), SEMS NUMBER: 63 | SRNS | RFI/RI WORK PLAN | 144 | ARF | ARF-023663.pdf | |
| 023669 | 04/01/2022 | SRNS-RP-2021-00548 | RESOURCE CONSERVATION AND RECOVERY ACT FACILITY INVESTIGATION/REMEDIAL INVESTIGATION REPORT WITH BASELINE RISK ASSESSMENT AND CORRECTIVE MEASURES STUDY/FEASIBILITY STUDY FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2021-00548, APRIL 2022, REVISION 1 REDLINE) | SRNS | SUPPORTING DOCUMENT | 605 | ARF | ARF-023669.pdf | |
| 023746 | 04/01/2022 | SRNS-RP-2021-00548 | RESOURCE CONSERVATION AND RECOVERY ACT FACILITY INVESTIGATION/REMEDIAL INVESTIGATION REPORT WITH BASELINE RISK ASSESSMENT AND CORRECTIVE MEASURES STUDY/ FESABILITY STUDY FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2021-00548, REVISION 1, APRIL 2022) SEMS NUMBER: 93 | SRNS | SUPPORTING DOCUMENT | 872 | ARF | ARF-023746.pdf | |
| 023876 | 04/01/2022 | SRNS-RP-2019-00394 | RCRA FACILITY INVESTIGATION / REMEDIAL INVESTIGATION WORK PLAN FOR THE D-AREA GROUNDWATER OPERABLE UNIT (D-AREA UPGRADIENT SOURCES) (U) (SRNS-RP-2019-00394, REVISION 1, APRIL 2022) (CERTIFIED CLEAN COPY), SEMS NUMBER: 63 | SRNS | RFI/RI WORK PLAN | 144 | ARF | ARF-023876.pdf | |
| 023667 | 03/31/2022 | V-PCOR-D-00074 | DECOMMISSIONING PROJECT FINAL REPORT BUILDING 607-14D, CHEMICAL FEED FACILITY (V-PCOR-D-00074, REVISION 0, MARCH 31, 2022) | SRNS | DECOMMISSION PROJECT FINAL REPORTS | 20 | ARF | ARF-023667.pdf | |
| 023655 | 03/31/2022 | SRNS-J2000-2022-00236 | READING ROOM: REMOVAL SITE EVALUATION REPORT / ENGINEERING EVALUATION/COST ANALYSIS FOR THE F-AREA MATERIAL STORAGE BUILDING (235-F) (U) | D. MCDANIEL | CORRESPONDENCE | 177 | IRF | ARF-023655.pdf | |
| 023685 | 03/30/2022 | ER-IDS-019-040 | LOWER THREE RUNS INTEGRATOR OPERABLE UNIT FOR FOUR PUBLIC ROAD CROSSING BETWEEN PATTERSON MILL ROAD AND SAVANNAH RIVER FIELD INSPECTION CHECKLIST | C. CARTER | SUPPORTING DOCUMENT | 7 | IRF | ARF-023685.pdf | |
| 023647 | 03/29/2022 | IACD-22-135 | DOE SUBMITTAL OF THE REMEDIAL ACTION IMPLEMENTATION PLAN FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT UPPER SUBUNIT (U) (SRNS-RP-2022-00011, REVISION 0, MARCH 2022), LAND USE CONTROL IMPLEMENTATION PLAN (LUCIP) FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT (UPPER SUBUNIT) (U) (SRNS-RP-2022-00017, REVISION 0, MARCH 2022) AND THE MONITORED NATURAL RECOVERY EFFECTIVENESS PLAN FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT – UPPER SUBUNIT (U) (SRNS-RP-2022-00085, REVISION 0, MARCH 2022) SEMS NUMBER: 35 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023647.pdf |
| 023640 | 03/28/2022 | SRNS-OS-2022-00113 | EPA APPROVAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE 2020 ANNUAL COMPREHENSIVE TNX AREA GROUNDWATER MONITORING AND REMEDIAL ACTION EFFECTIVENESS INTERIM REPORT (U), SEMS NUMBERS: 21, 29 (SRNS-RP-2021-03858, REVISION 0, JUNE 2021) | D. LLOYD | B. HENNESSEY | CORRESPONDENCE | 1 | IRF | ARF-023640.pdf |
| 023652 | 03/28/2022 | SRNS-OS-2022-00115 | EPA APPROVAL OF THE DECOMMISSIONING PROJECT FINAL REPORTS (DPFRS) FOR BUILDING 484-5D, D-AREA POWERHOUSE STORAGE BUILDING (V-PCOR-D-00069, REVISION 0, NOVEMBER 11, 2021) AND BUILDING 484-9D, D-AREA VALVE HOUSE (V-PCOR-D-00066, REVISION 0, NOVEMBER 11, 2021) AND SAVANNAH RIVER SITE?S RESPONSES TO EPA?S COMMENTS ON THE DPFRS FOR BUILDINGS 485-D AND 482-2D, D-AREA COOLING TOWER AND SWITCHGEAR BUILDING (V-PCOR-D-00061, REVISION 0, NOVEMBER 2, 2021), BUILDING 710-16D, STORAGE BUILDING (V-PCOR-D-00065, REVISION 0, JULY 8, 2021), BUILDING 704-7D, D-AREA MAINTENANCE BUILDING (V-PCOR-D-00064, REVISION 0, JULY 12, 2021), BUILDING 717-3D, D-AREA WELDING SHOP (V-PCOR-D-00063, REVISION 0, JULY 8, 2021), AND BUILDING 480-3D, MAINTENANCE FIELD OFFICE AND SHOP (V-PCOR-D-00062, REVISION 0, JULY 5, 2021) | D. LLOYD | B. HENNESSEY | CORRESPONDENCE | 2 | IRF | ARF-023652.pdf |
| 023651 | 03/28/2022 | SRNS-OS-2022-00117 | EPA APPROVAL OF THE SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE EFFECTIVENESS MONITORING REPORT FOR THE MONITORED NATURAL ATENUATION (MNA) AT THE CHEMICALS, METALS, AND PESTICIDES (CMP) PITS OPERABLE UNIT (OU) (U) APRIL 2020 THROUGH MARCH 2021, SEMS NUMBER: 24 (SRNS-RP-2021-03832, REVISION 0, JUNE 2021) | D. LLOYD | B. HENNESSEY | CORRESPONDENCE | 1 | IRF | ARF-023651.pdf |
| 023698 | 03/24/2022 | ER-IDS-019-011 | SAVANNAH RIVER LABORATORY SEEPAGE BASINS (BLDGS. 904-53G1, 904-53G2, 904-54G AND 904-55G) FIELD INSPECTION CHECKLIST | J. THOMAS | SUPPORTING DOCUMENT | 4 | IRF | ARF-023698.pdf | |
| 023637 | 03/23/2022 | SRNS-OS-2022-00103 | EPA COMMENTS ON THE DRAFT ACTION MEMORANDUM FOR THE NON-TIME CRITICAL REMOVAL ACTION FOR THE 235-F BUILDING (DATED FEBRUARY 2022) | R. POPE | B. HENNESSEY | CORRESPONDENCE | 3 | IRF | ARF-023637.pdf |