Administrative Record File/Information Repository File (ARF/IRF)

Jump To:

Index of documents (PDF) – a list of documents contained in the ARF/IRF, which are available at the University of South Carolina Libraries – Aiken and Columbia – on CD. This index is in PDF (portable document format) which requires Adobe Acrobat Reader software to be installed on your computer. The index is currently dated 1/8/2026 and lists entries numbered from 000001 to 025261.

Individual PDFs or each document are currently posted on the list below, which includes documents dated from 10/1/2017 to 1/8/2026. The list can be sorted by Catalog Number, Date, or Document Number by clicking on the blue text at the top of each respective column of data. The Index of Documents and PDFs will be updated quarterly. Historical PDFs will be added at a later date.

Disclaimer: The scanning process used to transfer documents into the portable document format may unintentionally create minor inaccuracies in the text. The viewer is warned that minor spelling errors may occur and numerical data may be missing decimal points or exponential values. Should the viewer have any questions regarding a particular section of text, an accurate hardcopy is always available from the Area Completion Project Document Control at the Savannah River Site, Luchelle Abney at (803) 952-7401.

Introduction

The Administrative Record File contains the documents and information considered or relied on in the selection of a response action and in controlling hazardous waste management activities. At the Savannah River Site, the Administrative Record File will fulfill the requirements of Section XXXIV, Administrative Record, of the Federal Facility Agreement (FFA).

An Administrative Record File for an individual waste unit is initiated upon the approval by the EPA-IV and the SCDHEC of an RFI/RI Work Plan. The File is compiled until the decision of the response action is chosen (the signing of the Record of Decision). At that time the Administrative Record File is finalized and is called the Administrative Record for that waste unit.

An Administrative Record serves two primary purposes. First, it is a vehicle for public participation in the selection of the response action. Section 113(k)(2) of CERCLA provides the public with an opportunity to participate in a response decision. The Administrative Record makes available the information considered or relied on in the selection and provides the opportunity for public involvement. Without opportunity for this involvement of interested persons, the limitation of court review solely to the Administrative Record can be challenged. Therefore, the Administrative Record will also record the public participation in the decision process and reflect the views of members of the public.

The second purpose of the Administrative Record is concerned with the presentation of evidence in the event of litigation. Judicial review of any issue concerning the adequacy of a response selection is limited to the Administrative Record. Under section 113(j)(2) of CERCLA, the trial court reviewing the selected response decision is limited the facts as set out in the Administrative Record. The Courts will not allow the use of discovery, hearings or additional fact findings unless the Administrative Record is found to be incomplete or poorly prepared. Provided the Administrative Record is adequate, the court will limit its review of the response decision made to the standard of arbitrary and capricious or otherwise not in accordance with the law. The Administrative Record should therefore chronicle the response decision process, whereby a judge could easily follow how and why a decision was made.

An Information Repository File contains information and documents that do not meet the definition of Administrative Record Files but that contain site and unit information, documents on site and unit activities, and general information.

Each entry in the Administrative Record File Index contains the following information:

  • ARF/IRF Catalog Number – A unique number assigned to each document or piece of information. For those documents that are microfilmed, the number is stamped on the top of the document to aid in locating the document on the microfilm.
  • Date –The date the document or information was issued.
  • Document Number – Many of the documents published or produced by the SCDHEC, EPA and SRS are assigned unique numbers. If no document number has been assigned, it is so indicated by the entry of a unique sequence number known as the catalog number. This number is for electronic tracking only.
  • Title –The title of the document, or a brief description of the contents.
  • Author – The person or party responsible for the issuance or writing of the document or information
  • Author Affiliation – The organization that the author works for or is affiliated with.
  • Addressee – In most cases this entry will be blank except if the document is correspondence. The entry, in that case, will be the individual(s) to whom the correspondence was addressed.
  • Addressee Affiliation – In most cases this entry will be blank except if the document is correspondence. The entry in that case will be the organization(s) to which the Addressee is affiliated.
  • Appx. No. of Pages – The approximate number of pages the document contains.
  • Document Type – Each document is categorized according to one of the following types of information:
    • Community Involvement/Relations
    • Correspondence
    • Draft RFI/RI Work Plan
    • Federal Facility Agreement
    • Final RFI/RI Work Plan
    • Guidance
    • Interim Action Proposed Plan
    • Meeting Minutes
    • Proposed Plan
    • Risk Assessment Document
    • Site Evaluation Report
    • Supporting Document
  • Classification – The entry will contain one of the three following codes:
    • U – The information is unclassified and available to the general public for viewing.
    • CP – The information or document is considered confidential or privileged. The document may contain sensitive information and is not available to the general public. It may be included in an Administrative Record File as it was used to support the decision making, but cannot be made publicly available.

PDF Downloads

3870 records available.

CATALOG NUMBERDATEDOCUMENT NUMBER ↓TITLEAUTHORADDRESSEEDOC TYPEAPPX # OF PAGESFILE TYPEPDF FILE
02448203/04/2024SRNS-RP-2023-00535CORRECTIVE MEASURES IMPLEMENTATION PLAN / REMEDIAL ACTION IMPLEMENTATION PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-20), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2023-00535, REVISION 1, JANUARY 2024) (CERTIFIED CLEAN COPY) SEMS NUMBER: 93SRNSCORRECTIVE MEASURES IMPLEMENTATION REMEDIAL ACTION IMPLEMENTATION PLAN96IRFARF-024482.pdf
02448203/04/2024SRNS-RP-2023-00535CORRECTIVE MEASURES IMPLEMENTATION PLAN / REMEDIAL ACTION IMPLEMENTATION PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2023-00535, REVISION 1, JANUARY 2024) (CERTIFIED CLEAN COPY) SEMS NUMBER: 93SRNSCORRECTIVE MEASURES IMPLEMENTATION REMEDIAL ACTION IMPLEMENTATION PLAN96IRFARF-024482.pdf
02427208/01/2023SRNS-RP-2023-00535CORRECTIVE MEASURES IMPLEMENTATION PLAN/REMEDIAL ACTION IMPLEMENTATION PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2023-00535, REVISION 0, AUGUST 2023), SEMS NUMBER: 93SRNSCORRECTIVE MEASURES IMPLEMENTATION REMEDIAL ACTION IMPLEMENTATION PLAN92ARFARF-024272.pdf
02451304/02/2024SRNS-RP-2023-00535THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR NOTICE OF AVAILABILITY OF REMEDIAL DESIGN FACT SHEET AVAILABLE FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) AT THE SAVANNAH RIVER SITESRNSCOMMUNITY INVOLVEMENT1IRFARF-024513.pdf
02421906/01/2023SRNS-RP-2023-00474EFFECTIVENESS MONITORING REPORT FOR THE MONITORING NATURAL ATTENUATION (MNA) AT THE CHEMICALS, METALS, AND PESTICIDES (CMP) PITS OPERABLE UNIT (OU) (U) APRIL 2022 THROUGH MARCH 2023 (SRNS-RP-2023-00474, REVISION 0, JUNE 2023) SEMS NUMBER: 24SRNSSUPPORTING DOCUMENT365ARFARF-024219.pdf
02420206/01/2023SRNS-RP-2023-00335ADDENDUM TO THE REVISION 1 LAND USE CONTROL IMPLEMENTATION PLAN FOR THE WETLAND AREA AT DUNBARTON BAY IN SUPPORT OF STEEL CREEK INTEGRATOR OPERABLE UNIT (U) (SRNS-RP-2023-00335, REVISION 0, JUNE 2023) SEMS NUMBER: 71SRNSLAND USE CONTROL IMPLEMENTATION PLAN18ARFARF-024202.pdf
02414303/01/2023SRNS-RP-2023-002612023 GROUNDWATER MONITORING REPORT FOR THE D-AREA GROUNDWATER OPERABLE UNIT (U) (SRNS-RP-2023-00261, REVISION 0, MARCH 2023) SEMS NUMBER: 63SRNSSUPPORTING DOCUMENT922ARFARF-024143.pdf
02422003/30/2023SRNS-RP-2023-00155FLOODPLAIN AND WETLAND ASSESSMENT FOR THE INSTALLATION OF A FIBER OPTIC CABLE FROM U.S. FOREST-SERVICE – SAVANNAH RIVER HEADQUARTERS TO THE ADVANCED TACTICAL TRAINING AREA AT THE SAVANNAH RIVER SITE (SRNS-RP-2023-00155, REVISION 0, MARCH 2023)SRNSSUPPORTING DOCUMENT13ARFARF-024220.pdf
02435711/07/2023SRNS-RP-2023-00140FY2022 PERFORMANCE ASSESSMENT ANNUAL REVIEW FOR THE E-ARE LOW-LEVEL WASTE FACILITY (SRNS-RP-2023-00140, REVISION 0, FEBRUARY 2023)SRNSSUPPORTING DOCUMENT45IRFARF-024357.pdf
02417505/01/2023SRNS-RP-2023-00127PERFORMANCE EVALUATION REPORT FOR THE A-AREA BURNING/RUBBLE PTS (731-A, -1A) AND RUBBLE PIT (731-2A) AND THE MISCELLANEOUS CHEMICAL BASIN/METALS BURING PIT (731-4A, -5A) OPERABLE UNIT – JANUARY THROUGH DECEMBER 2022 (U) (SRNS-RP-2023-00127, REVISION 0, MAY 2023) SEMS NUMBER: 28SRNSSUPPORTING DOCUMENT58ARFARF-024175.pdf
02504006/26/2025SRNS-RP-2023-00109POST-CONSTRUCTION REPORT FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT UPPER SUBUNIT (U) (SRNS-RP-2023-00109, REVISION 1, JANUARY 2025) (CLEAN COPY) SEMS NUMBER: 35SCHIEFER, ERICPCR/CMIR/RACR78IRFARF-025040.pdf
02491303/14/2025SRNS-RP-2023-00109POST-CONSTRUCTION REPORT FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT UPPER SUBUNIT (U) (SRNS-RP-2023-00109, REVISION 1, JANUARY 2025) (REDLINE), SEMS NUMBER: 35SRNSPCR/CMIR/RACR78IRFARF-024913.pdf
02468109/05/2024SRNS-RP-2023-00109POST-CONSTRUCTION REPORT FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT UPPER SUBUNIT (U) (SRNS-RP-2023-00109, REVISION 0, AUGUST 2024) SEMS NUMBER: 35SRNSPCR/CMIR/RACR78IRFARF-024681.pdf
02407402/02/2023SRNS-RP-2023-00066THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR REMEDIAL DESIGN FACT SHEET AVAILABLE FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT UPPER SUBUNIT AT THE SAVANNAH RIVER SITE (VOLUME 35, NUMBER 1, FEBRUARY 2, 2023)SRNSCOMMUNITY INVOLVEMENT2IRFARF-024074.pdf
02408502/16/2023SRNS-RP-2023-00065THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR STATEMENT OF BASIS / PROPOSED PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE (N-1) (NBN) CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT AVAILABLE FOR PUBLIC COMMENT (VOLUME 35, NUMBER 2, FEBRUARY 16, 2023)SRNSCOMMUNITY INVOLVEMENT3IRFARF-024085.pdf
02433510/12/2023SRNS-RP-2023-00065THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR THE NOTICE OF AVAILABILITY RECORD OF DECISION FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP ;UMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING OPERABLE UNIT (VOLUME 35, NUMBER 7, DATED OCTOBER 12, 2023)SRNSCOMMUNITY INVOLVEMENT3ARFARF-024335.pdf
02433510/12/2023SRNS-RP-2023-00065THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR THE NOTICE OF AVAILABILITY RECORD OF DECISION FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING OPERABLE UNIT (VOLUME 35, NUMBER 7, DATED OCTOBER 12, 2023)SRNSCOMMUNITY INVOLVEMENT3ARFARF-024335.pdf
02403301/05/2023SRNS-RP-2023-00020THREE PARTY SIGNED SAVANNAH RIVER SITE FEDERAL FACILITY AGREEMENT MODIFICATION FOR APPENDIX L, STATEMENTS OF DISPUTE RESOLUTION FOR INCLUSION OF 2022 HIGH LEVEL WASTE TANK MILESTONES AGREEMENTB. HENNESSEYFEDERAL FACILITY AGREEMENT6IRFARF-024033.pdf
02424306/01/2023SRNS-RP-2022-01284RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G) AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2022-01284, REVISION 1 REDLINE, JUNE 2023), SEMS NUMBER: 93SRNSRECORD OF DECISION114ARFARF-024243.pdf
02429309/06/2023SRNS-RP-2022-01284U. S. DEPARTMENT OF ENERGY SIGNED RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2022-01284, REVISION 1, JUNE 2023).SRNSRECORD OF DECISION114IRFARF-024293.pdf
02410703/01/2023SRNS-RP-2022-01284RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (SRNS-RP-2022-01284, REVISION 0, MARCH 2023) SEMS NUMBER: 93SRNSRECORD OF DECISION114ARFARF-024107.pdf
02431509/25/2023SRNS-RP-2022-01284THREE PARTY SIGNED RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2022-01284, REVISION 1, JUNE 2023) SEMS NUMBER: 93SRNSRECORD OF DECISION114IRFARF-024315.pdf
02431406/30/2023SRNS-RP-2022-01284USDOE AND SCDHEC SIGNED RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2022-01284, REVISION 1, JUNE 2023)SRNSRECORD OF DECISION114ARFARF-024314.pdf
02415703/31/2023SRNS-RP-2022-011062022 ANNUAL GROUNDWATER MONITORING REPORT FOR THE F- AND H-AREA RADIOACTIVE LIQUID WASTE TANK FARMS (SRNS-RP-2022-01106, REVISION 0, MARCH 2023) SEMS NUMBERS: 23 & 89SRNSSUPPORTING DOCUMENT76ARFARF-024157.pdf
02418505/01/2023SRNS-RP-2022-01080 REV. 1 REDLINESAMPLING AND ANALYSIS PLAN FOR THE A-AREA BURNING/RUBBLE PITS (731-A, -1A) AND RUBBLE PIT (731-2A) AND THE MISCELLANEOUS CHEMICAL BASIN/METALS BURNING PIT (731-4A, -5A) OPERABLE UNIT (U) TO EVALUATE THE EFFECTIVENESS OF THE SOIL VAPOR EXTRACTION SYSTEM AT ACHIEVING REMEDIAL GOALS (U) (SRNS-RP-2022-01080, REVISION 1, MAY 2023) (REDLINE)SRNSSAMPLING AND ANALYSIS PLAN38ARFARF-024185.pdf
02418605/01/2023SRNS-RP-2022-01080 REV. 1 CLEAN COPYSAMPLING AND ANALYSIS PLAN FOR THE A-AREA BURNING/RUBBLE PITS (731-A, -1A) AND RUBBLE PIT (731-2A) AND THE MISCELLANEOUS CHEMICAL BASIN/METALS BURNING PIT (731-4A, -5A) OPERABLE UNIT (U) TO EVALUATE THE EFFECTIVENESS OF THE SOIL VAPOR EXTRACTION SYSTEM AT ACHIEVING REMEDIAL GOALS (U) (SRNS-RP-2022-01080, REVISION 1, MAY 2023) (CLEAN COPY)SRNSSAMPLING AND ANALYSIS PLAN38ARFARF-024186.pdf
02405001/01/2023SRNS-RP-2022-01080SAMPLING AND ANALYSIS PLAN FOR THE A-AREA BURNING/ RUBBLE PITS (731-A, -1A) AND RUBBLE PIT (731-2A) AND THE MISCELLANEOUS CHEMICAL BASIN/ METALS BURNING PIT (731-4A, -5A) OPERABLE UNIT TO EVALUATE THE EFFECTIVENESS OF SOIL VAPOR EXTRACTION SYSTEM AT ACHIEVING REMEDIAL GOALS (U) (SRNS-RP-2022-01080, REVISION 0, JANUARY 2023) SEMS NUMBER: 28SRNSSUPPORTING DOCUMENT36ARFARF-024050.pdf
02397311/28/2022SRNS-RP-2022-01026FEDERAL FACILITY AGREEMENT ANNUAL PROGRESS REPORT FOR FISCAL YEAR 2022 (SRNS-RP-2022-01026, NOVEMBER 2022)SRNSSUPPORTING DOCUMENT32ARFARF-023973.pdf
02425704/01/2023SRNS-RP-2022-00982, REVISION 1THREE PARTY SIGNED EXPLANATION OF SIGNIFICANT DIFFERENCE FOR THE REVISION 1 RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE WETLAND AREA AT DUNBARTON BAY IN SUPPORT OF STEEL CREEK INTEGRATOR OPERABLE UNIT (U) (SRNS-RP-2022-00982, REVISION 1, APRIL 2023) SEMS NUMBER: 71SRNSRECORD OF DECISION20ARFARF-024257.pdf
02423104/30/2023SRNS-RP-2022-00982U.S. DEPARTMENT OF ENERGY AND SOUTH CAROLINA DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL-SIGNED EXPLANATION OF SIGNIFICANT DIFFERENCE FOR THE REVISION 1 RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE WETLAND AREA AT DUNBARTON BAY IN SUPPORT OF STEEL CREEK INTEGRATOR OPERABLE UNIT (U) (SRNS-RP-2022-00982, REVISION 1, APRIL 2023)SRNSSUPPORTING DOCUMENT20ARFARF-024231.pdf
02414504/01/2023SRNS-RP-2022-00982EXPLANATION OF SIGNIFICANT DIFFERENCE FOR THE REVISION 1 RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE WETLAND AREA AT DUNBARTON BAY IN SUPPORT OF STEEL CREEK INTEGRATOR OPERABLE UNIT (U) (SRNS-RP-2022-00982, REVISION 1 REDLINE, APRIL 2023), SEMS NUMBER: 71SRNSRECORD OF DECISION20ARFARF-024145.pdf
02403701/01/2023SRNS-RP-2022-00982EXPLANATION OF SIGNIFICANT DIFFERENCE FOR THE REVISION 1 RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE WETLAND AREA AT DUNBARTON BAY IN SUPPORT OF STEEL CREEK INTEGRATOR OPERABLE UNIT (U) (SRNS-RP-2022-00982, REVISION 0, JANUARY 2023) SEMS NUMBER: 71SRNSRECORD OF DECISION20ARFARF-024037.pdf
02420804/30/2023SRNS-RP-2022-00982U.S. DEPARTMENT OF ENERGY-SIGNED EXPLANATION OF SIGNIFICANT DIFFERENCE FOR THE REVISION 1 RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE WETLAND AREA AT DUNBARTON BAY IN SUPPORT OF STEEL CREEK INTEGRATOR OPERABLE UNIT (U) (SRNS-RP-2022-00982, REVISION 1, APRIL 2023) SEMS NUMBER: 71SRNSSUPPORTING DOCUMENT20ARFARF-024208.pdf
02408301/01/2023SRNS-RP-2022-00963GROUNDWATER REPORT FOR THE P-AREA GROUNDWATER (PAGW) OPERABLE UNIT (OU) (U) APRIL 2021 THROUGH MARCH 2022 DATA (SRNS-RP-2022-00963, REVISION 0, JANUARY 2023) SEMS NUMBER: 81SRNSSUPPORTING DOCUMENT236ARFARF-024083.pdf
02402812/28/2022SRNS-RP-2022-00923THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR NOTICE OF PUBLIC AVAILABILITY FOURTH PHASE: SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH GEOSYNTHETIC OR STABILIZATION/SOLIDIFICATION COVER SYSTEMS (VOLUME 34, NUMBER 9 , DECEMBER 28, 2022)SRNSCOMMUNITY INVOLVEMENT4IRFARF-024028.pdf
02391510/12/2022SRNS-RP-2022-00829THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR U.S. DEPARTMENT OF ENERGY CONDUCTS PHASED SUBMITTALS OF THE SIXTH FIVE-YEAR REMEMDY REVIEW AT SAVANNAH RIVER SITE FIFTH PHASE: SAVANNAH RIVER SITE OPERABLE UNITS WITH OPERATING EQUIPMENT (VOLUME 34, NUMBER 6, DATED OCTOBER 12, 2022)SRNSCOMMUNITY INVOLVEMENT3IRFARF-023915.pdf
02384308/01/2022SRNS-RP-2022-006272021 ANNUAL COMPREHENSIVE TNX AREA GROUNDWATER MONITORING AND REMEDIAL ACTION EFFECTIVENESS INTERIM REPORT (U) (SRNS-RP-2022-00627, REVISION 0, AUGUST 2022) SEMS NUMBERS: 21, 29SRNSSUPPORTING DOCUMENT550ARFARF-023843.pdf
02395711/10/2022SRNS-RP-2022-00565EFFECTIVENESS MONITORING REPORT (EMR) FOR THE P-AREA GROUNDWATER (PAGW) OPERABLE UNIT (OU) ZERO VALENT IRON PERMEABLE REACTIVE BARRIER (ZVI-PRB) REMOVAL ACTION (U) APRIL 2021 THROUGH MARCH 2022 (SRNS-RP-2022-00565, REVISION 0, OCTOBER 2022) SEMS NUMBER: 81SRNSSUPPORTING DOCUMENT120ARFARF-023957.pdf
02380807/28/2022SRNS-RP-2022-00559448-4D ASH LANDFILL ANNUAL GROUNDWATER MONITORING REPORT – 2021 DATA (SRNS-RP-2022-00559, REVISION 0, JULY 2022) SEMS NUMBER 63SRNSSUPPORTING DOCUMENT19ARFARF-023808.pdf
02387309/01/2022SRNS-RP-2022-00530EFFECTIVENESS MONITORING REPORT (EMR) FOR THE C-AREA GROUNDWATER (CAGW) OPERABLE UNIT REMOVAL ACTION (U) JULY 2021 THROUGH JUNE 2022 (SRNS-RP-2022-00530, REVISION 0, SEPTEMBER 2022) SEMS NUMBER: 82SRNSSUPPORTING DOCUMENT386ARFARF-023873.pdf
02405212/01/2022SRNS-RP-2022-00528UNITED STATES DEPARTMENT OF ENERGY STATEMENT OF BASIS / PROPOSED PLAN FACT SHEET FOR THE ECODS N-1, CSSLP, AND FORD BUILDING OU, SEMS NUMBER: 93SRNSSUPPORTING DOCUMENT5ARFARF-024052.pdf
02381107/01/2022SRNS-RP-2022-00528UNITED STATES DEPARTMENT OF ENERGY STATEMENT OF BASIS/PROPOSED PLAN FACT SHEET FOR THE ECODS N-1, CSSLP, AND FORD BUILDING OU, (SRNS-RP-2022-00528, JULY 2022) SEMS NUMBER: 93SRNSSUPPORTING DOCUMENT5ARFARF-023811.pdf
02401208/30/2022SRNS-RP-2022-00489SCOPING SUMMARY FOR THE SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH OPERATING EQUIPMENT (U) (SRNS-RP-2022-00489, FINAL, AUGUST 2022) SEMS NUMBER: 00SRNSSUPPORTING DOCUMENT18ARFARF-024012.pdf
02424706/30/2023SRNS-RP-2022-00488SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SRS OPERABLE UNITS WITH OPERATING EQUIPMENT FACT SHEET (SRNS-RP-2022-00488, JUNE 2023) (REDLINE), SEMS NUMBER: 00SRNSSUPPORTING DOCUMENT6ARFARF-024247.pdf
02434010/18/2023SRNS-RP-2022-00488SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SRS OPERABLE UNITS WITH OPERATING EQUIPMENT FACT SHEET (SRNS-RP-2022-00488, JUNE 2023) (CLEAN COPY)SRNSSUPPORTING DOCUMENT6IRFARF-024340.pdf
02401112/01/2022SRNS-RP-2022-00488SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SRS OPERABLE UNITS WITH OPERATING EQUIPMENT FACT SHEET (SRNS-RP-2022-00488, DECEMBER 2022) SEMS NUMBER: 00SRNSSUPPORTING DOCUMENT6IRFARF-024011.pdf
02477811/22/2024SRNS-RP-2022-00468 REVISION 1, CORRECTED JUNE 2023THREE PARTY SIGNED SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH OPERATING EQUIPMENT (U) AIKEN, SOUTH CAROLINA (SRNS-RP-2022-00468, REVISION 1 (CORRECTED), JUNE 2023) SEMS NUMBER: 00SRNSREMEDY REVIEW REPORT618ARFARF-024778.pdf
02433910/18/2023SRNS-RP-2022-00468U.S. DEPARTMENT OF ENERGY SIGNED SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH OPERATING EQUIPMENT (U) AIKEN, SOUTH CAROLINA (SRNS-RP-2022-00468, REVISION 1, JUNE 2023)SRNSREMEDY REVIEW REPORT616IRFARF-024339.pdf
02424606/30/2023SRNS-RP-2022-00468SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH OPERATING EQUIPMENT (U) AIKEN, SOUTH CAROLINA (SRNS-RP-2022-00468, REVISION 1, JUNE 2023) (REDLINE PAGES), SEMS NUMBER: 00SRNSREMEDY REVIEW REPORT162ARFARF-024246.pdf
02436411/01/2023SRNS-RP-2022-00468US DOE AND SCDHEC SIGNED SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH OPERATING EQUIPMENT (U) ? AIKEN, SOUTH CAROLINA (SRNS-RP-2022-00468, REVISION 1, JUNE 2023) SEMS NUMBER: 00SRNSREMEDY REVIEW REPORT616IRFARF-024364.pdf
02401312/01/2022SRNS-RP-2022-00468SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH OPERATING EQUIPMENT (U) AIKEN, SOUTH CAROLINA (SRNS-RP-2022-00468, REVISION 0, DECEMBER 2022) SEMS NUMBER: 00SRNSREMEDY REVIEW REPORT600ARFARF-024013.pdf
02439812/06/2023SRNS-RP-2022-00468THREE PARTY SIGNED SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH OPERATING EQUIPMENT (U) AIKEN, SOUTH CAROLINA (SRNS-RP-2022-00468, REVISION 1, JUNE 2023) SEMS NUMBER: 00SRNSREMEDY REVIEW REPORT616IRFARF-024398.pdf
02380307/27/2022SRNS-RP-2022-003962021 GROUNDWATER MIXING ZONE REPORT FOR THE D-AREA OIL SEEPAGE BASIN (631-G) (U) (SRNS-RP-2022-00396, REVISION 0, JULY 2022) SEMS NUMBER: 27SRNSSUPPORTING DOCUMENT190ARFARF-023803.pdf
02372606/01/2022SRNS-RP-2022-00366THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR ACTION MEMORANDUM AND RESPONSIVENESS SUMMARY ISSUED FOR THE NON-TIME CRITICAL REMOVAL ACTION FOR THE F-AREA MATERIAL STORAGE BUILDING (235-F) (VOLUME 34, NUMBER 2, DATED JUNE 1, 2022)SRNSCOMMUNITY INVOLVEMENT3IRFARF-023726.pdf
02523712/09/2025SRNS-RP-2022-00348SCOPING SUMMARY FOR THE UPDATE OF THE ENVIRONMENTAL COMPLIANCE & AREA COMPLETION PROJECTS REGULATORY DOCUMENT HANDBOOK (ERD-AG-003, REVISION 17, JUNE 2012) (U) (SRNS-RP-2022-00348, FINAL, JUNE 2022)SRNS, SRNSSUPPORTING DOCUMENT14IRFARF-025237.pdf
02373906/16/2022SRNS-RP-2022-00342, REV. 0EFFECTIVENESS MONITORING REPORT FOR THE MONITORED NATURAL ATTENUATION (MNA) AT THE CHEMICALS, METALS, AND PESTICIDES (CMP) PITS OPERABLE UNIT (OU) (U) APRIL 2021 THROUGH MARCH 2022 (SRNS-RP-2022-00342, REVISION 0, JUNE 2022) SEMS NUMBER: 24SRNSSUPPORTING DOCUMENT363ARFARF-023739.pdf
02421006/01/2023SRNS-RP-2022-00330ENVIRONMENTAL COMPLIANCE & AREA COMPLETION PROJECTS REGULATORY DOCUMENT HANDBOOK (SRNS-RP-2022-00330, REVISION 0, JUNE 2023)SRNSSUPPORTING DOCUMENT466ARFARF-024210.pdf
02523912/12/2025SRNS-RP-2022-00330ENVIRONMENTAL COMPLIANCE AND REGULATORY DOCUMENT HANDBOOK (SRNS-RP-2022-00330, REVISION 0, JUNE 2023, UPDATED DECEMBER 2025) (REDLINE PAGES)SRNS, SRNSSUPPORTING DOCUMENT16IRFARF-025239.pdf
02524012/12/2025SRNS-RP-2022-00330ENVIRONMENTAL COMPLIANCE AND REGULATORY DOCUMENT HANDBOOK (SRNS-RP-2022-00330, REVISION 0, JUNE 2023, UPDATED DECEMBER 2025) (CLEAN COPY)SRNS, SRNSSUPPORTING DOCUMENT472IRFARF-025240.pdf
02376006/29/2022SRNS-RP-2022-00253K-AREA BURNING/ RUBBLE PIT AND RUBBLE PILE (131-K AND 631-20G) (KBRP), AND P-AREA BURNING/ RUBBLE PIT (131-P) (PBRP) OPERABLE UNITS (OU) DETAILED COMBINED GROUNDWATER MONITORING REPORT (SRNS-RP-2022-00253, REVISION 0, JUNE 2022) SEMS NUMBERS: 40, 56, AND 59SRNSSUPPORTING DOCUMENT82ARFARF-023760.pdf
02375806/29/2022SRNS-RP-2022-002122021 GROUNDWATER MIXING ZONE REPORT FOR THE R-AREA REACTOR SEEPAGE BASINS/ 108-4R OVERFLOW BASIN OPERABLE UNIT (SRNS-RP-2022-00212, REVISION 0, JUNE 2022) SEMS NUMBER:25SRNSSUPPORTING DOCUMENT100ARFARF-023758.pdf
02379904/19/2022SRNS-RP-2022-00205PROPOSED CORE TEAM REMEDIAL ACTIONS AND REGULATORY STRATEGY FOR REMAINING SRS ASH/COAL FINES WASTE UNITS (U)SRNSSUPPORTING DOCUMENT27IRFARF-023799.pdf
02381007/01/2022SRNS-RP-2022-00202STATEMENT OF BASIS/PROPOSED PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2022-00202, REVISION 0, JULY 2022) SEMS NUMBER: 93SRNSSTATEMENT OF BASIS / PROPOSED PLAN62ARFARF-023810.pdf
02405312/01/2022SRNS-RP-2022-00202CERTIFIED CLEAN COPY OF THE STATEMENT OF BASIS/PROPOSED PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2022-00202, REVISION 1, DECEMBER 2022) SEMS NUMBER: 93SRNSSTATEMENT OF BASIS / PROPOSED PLAN64ARFARF-024053.pdf
02400212/01/2022SRNS-RP-2022-00202STATEMENT OF BASIS/PROPOSED PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2022-00202, REVISION 1 REDLINE, DECEMBER 2022), SEMS NUMBER: 93SRNSSTATEMENT OF BASIS / PROPOSED PLAN64ARFARF-024002.pdf
02370605/01/2022SRNS-RP-2022-00178PERFORMANCE EVALUATION REPORT FOR THE A-AREA BURNING/RUBBLE PITS (731-A, -1A) AND RUBBLE PIT (731-2A) AND THE MISCELLANEOUS CHEMICAL BASIN/METALS BURNING PIT (731-4A, -5A) OPERABLE UNIT – JANUARY THROUGH DECEMBER 2021 (U) (SRNS-RP-2022-00178, REVISION 0, MAY 2022) SEMS NUMBER: 28SRNSSUPPORTING DOCUMENT54ARFARF-023706.pdf
02365604/05/2022SRNS-RP-2022-00149THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR REMOVAL SITE EVALUATION REPORT/ENGINEERING EVALUATION/COST ANALYSIS (RSER/EE/CA) FOR THE F-AREA MATERIAL STORAGE BUILDING (235-F) AVAILABLE FOR PUBLIC COMMENT (VOLUME 34, NUMBER 1, DATED APRIL 5, 2022SRNSCOMMUNITY INVOLVEMENT3IRFARF-023656.pdf
02365003/01/2022SRNS-RP-2022-00085MONITORED NATURAL RECOVERY EFFECTIVENESS PLAN FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT – UPPER SUBUNIT (U) (SRNS-RP-2022-00085, REVISION 0, MARCH 2022) SEMS NUMBER: 35SRNSSUPPORTING DOCUMENT28ARFARF-023650.pdf
02396108/31/2022SRNS-RP-2022-00085MONITORED NATURAL RECOVERY EFFECTIVENESS PLAN FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT – UPPER SUBUNIT (U) (SRNS-RP-2022-00085, REVISION 1, AUGUST 2022), SEMS NUMBER: 35SRNSSUPPORTING DOCUMENT30ARFARF-023961.pdf
02385608/01/2022SRNS-RP-2022-00085MONITORED NATURAL RECOVERY EFFECTIVENESS PLAN FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT – UPPER SUBUNIT (U) (SRNS-RP-2022-00085, REVISION 1 REDLINE, AUGUST 2022) SEMS NUMBER: 35SRNSSUPPORTING DOCUMENT28ARFARF-023856.pdf
02431808/31/2023SRNS-RP-2022-00084SCOPING SUMMARY FOR THE 236-H BY-PRODUCT PURIFICATION FACILITY (U) (PRE-DECOMMISSIONING CHARACTERIZATION SCOPING) (SRNS-RP-2022-00084, AUGUST 2023 FINAL))SRNSDECOMMISSION PROJECT FINAL REPORTS134ARFARF-024318.pdf
02363903/01/2022SRNS-RP-2022-000762021 ANNUAL GROUNDWATER MONITORING REPORT FOR THE F- AND H-AREA RADIOACTIVE LIQUID WASTE TANK FARMS (SRNS-RP-2022-00076, REVISION 0, MARCH 2022)SRNSSUPPORTING DOCUMENT78ARFARF-023639.pdf
02399111/01/2022SRNS-RP-2022-00071, REDLINEREMOVAL ACTION REPORT FOR THE 484-17D COAL STORAGE AREA (U) (SRNS-RP-2022-00071, REVISION 1, NOVEMBER 2022) (REDLINE), SEMS NUMBER: 63SRNSREMOVAL ACTION74ARFARF-023991.pdf
02399211/01/2022SRNS-RP-2022-00071, CLEAN COPYREMOVAL ACTION REPORT FOR THE 484-17D COAL STORAGE AREA (U) (SRNS-RP-2022-00071, REVISION 1, NOVEMBER 2022) (CLEAN COPY), SEMS NUMBER: 63SRNSREMOVAL ACTION74ARFARF-023992.pdf
02375306/01/2022SRNS-RP-2022-00071REMOVAL ACTION REPORT FOR THE 484-17D COAL STORAGE AREA (U) (SRNS-RP-2022-00071, REVISION 0, JUNE 2022) SEMS NUMBER: 63SRNSREMOVAL ACTION74ARFARF-023753.pdf
02370005/01/2022SRNS-RP-2022-00064SECOND EARLY ACTION POST-CONSTRUCTION REPORT (EAPCR) FOR THE D-AREA OPERABLE UNIT (U) (SRNS-RP-2022-00064, REVISION 0, MAY 2022) SEMS NUMBER: 63SRNSPCR/CMIR/RACR44ARFARF-023700.pdf
02388809/01/2022SRNS-RP-2022-00064SECOND EARLY ACTION POST-CONSTRUCTION REPORT (EAPCR) FOR THE D-AREA OPERABLE UNIT (U) (SRNS-RP-2022-00064, REVISION 1, SEPTEMBER 2022) (REDLINE), SEMS NUMBER: 63SRNSPCR/CMIR/RACR50ARFARF-023888.pdf
02396711/17/2022SRNS-RP-2022-00054CLEAN COPY OF THE SECOND EARLY ACTION POST-CONSTRUCTION REPORT (EAPCR) FOR THE D-AREA OPERABLE UNIT (U) (SRNS-RP-2022-00064, REVISION 1, SEPTEMBER 2022) SEMS NUMBER: 63SRNSSUPPORTING DOCUMENT50ARFARF-023967.pdf
02364903/01/2022SRNS-RP-2022-00017LAND USE CONTROL IMPLEMENTATION PLAN (LUCIP) FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT (UPPER SUBUNIT) (U) (SRNS-RP-2022-00017, REVISION 0, MARCH 2022) SEMS NUMBER: 35SRNSLAND USE CONTROL IMPLEMENTATION PLAN38ARFARF-023649.pdf
02396008/31/2022SRNS-RP-2022-00017LAND USE CONTROL IMPLEMENTATION PLAN (LUCIP) FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT (UPPER SUBUNIT) (U) (SRNS-RP-2022-00017, REVISION 1, AUGUST 2022) SEMS NUMBER: 35SRNSLAND USE CONTROL IMPLEMENTATION PLAN38ARFARF-023960.pdf
02385508/01/2022SRNS-RP-2022-00017LAND USE CONTROL IMPLEMENTATION PLAN (LUCIP) FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT (UPPER SUBUNIT) (U) (SRNS-RP-2022-00017, REVISION 1 REDLINE, AUGUST 2022) SEMS NUMBER: 35SRNSLAND USE CONTROL IMPLEMENTATION PLAN38ARFARF-023855.pdf
02395908/31/2022SRNS-RP-2022-00011REMEDIAL ACTION IMPLEMENTATION PLAN FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT UPPER SUBUNIT (U) (SRNS-RP-2022-00011, REVISION 1, AUGUST 2022), SEMS NUMBER: 35SRNSCORRECTIVE MEASURES IMPLEMENTATION REMEDIAL ACTION IMPLEMENTATION PLAN88ARFARF-023959.pdf
02385408/01/2022SRNS-RP-2022-00011REMEDIAL ACTION IMPLEMENTATION PLAN FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT UPPER SUBUNIT (U) (SRNS-RP-2022-00011, REVISION 1 REDLINE, AUGUST 2022) SEMS NUMBER: 35SRNSCORRECTIVE MEASURES IMPLEMENTATION REMEDIAL ACTION IMPLEMENTATION PLAN88ARFARF-023854.pdf
02364803/01/2022SRNS-RP-2022-00011REMEDIAL ACTION IMPLEMENTATION PLAN FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT UPPER SUBUNIT (U) (SRNS-RP-2022-00011, REVISION 0, MARCH 2022) SEMS NUMBER: 35SRNSCORRECTIVE MEASURES IMPLEMENTATION REMEDIAL ACTION IMPLEMENTATION PLAN90ARFARF-023648.pdf
02358602/01/2022SRNS-RP-2021-05602RFI/RI WORK PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE L-3 (NBN), L-AREA RUBBLE PIT (131-LL), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT (U) (SRNS-RP-2021-05602, REVISION 0, FEBRUARY 2022)SRNSRFI/RI WORK PLAN212ARFARF-023586.pdf
02379807/01/2022SRNS-RP-2021-05602RFI/RI WORK PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE L-3 (NBN), L-AREA RUBBLE PIT (131-1L), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT (U) (SRNS-RP-2021-05602, REVISION 1 REDLINE, JULY 2022), SEMS NUMBER: 91SRNSRFI/RI WORK PLAN226ARFARF-023798.pdf
02387807/01/2022SRNS-RP-2021-05602RFI/RI WORK PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE L-3 (NBN), L-AREA RUBBLE PIT (131-1L) AND L-AREA RUBBLE PIT PIT (131-4L) OPERABLE UNIT (U) (SRNS-RP-2021-05602, REVISION 1, JULY 2022) (CERTIFIED CLEAN COPY), SEMS NUMBER: 91SRNSRFI/RI WORK PLAN214ARFARF-023878.pdf
02351212/21/2021SRNS-RP-2021-05522THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR RECORD OF DECISION AVAILABLE FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT AT THE SAVANNAH RIVER SITE (VOLUME 33, NUMBER11, DECEMBER 21, 2021SRNSCOMMUNITY INVOLVEMENT2IRFARF-023512.pdf
02346211/01/2021SRNS-RP-2021-05286ADMINISTRATIVE RECORD FILE / INFORMATION REPOSITORY FILE ANNUAL INDICES UPDATE (SRNS-RP-2021-05286, NOVEMBER 2021)D. MCDANIELSUPPORTING DOCUMENT2999ARFARF-023462.pdf
02501606/05/2025SRNS-RP-2021-05232SCOPING SUMMARY FOR THE ECODS L-3 (EAST OF L AREA) (NBN), L-AREA RUBBLE PIT (131-1L), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT (STATEMENT OF BASIS / PROPOSED PLAN SCOPING) (SRNS-RP-2021-05232, APRIL 2025, FINAL) SEMS NUMBERS: 91OQUINN, SADIKASUPPORTING DOCUMENT38IRFARF-025016.pdf
02358512/01/2021SRNS-RP-2021-05232SCOPING SUMMARY FOR THE ECODS L-3 (EAST OF L AREA) (NBN), L-AREA RUBBLE PIT (131-LL), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT (SRNS-RP-2021-05232, DECEMBER 2021) SEMS NUMBER: 91SRNSSUPPORTING DOCUMENT32IRFARF-023585.pdf
02464107/31/2024SRNS-RP-2021-05232SCOPING SUMMARY FOR THE ECODS L-3 (EAST OF L AREA) (NBN), L-AREA RUBBLE PIT (131- 1L), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT (SRNS-RP-2021-05232, MARCH 2024) (PROBLEM ID/FS SCOPING) SEMS NUMBER: 91SRNSSUPPORTING DOCUMENT32IRFARF-024641.pdf
02347411/01/2021SRNS-RP-2021-05230FEDERAL FACILITY AGREEMENT ANNUAL PROGRESS REPORT FOR FISCAL YEAR 2021SRNSSUPPORTING DOCUMENT32ARFARF-023474.pdf
02351112/21/2021SRNS-RP-2021-05046THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR NOTICE OF PUBLIC AVAILABILITY THIRD PHASE: SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH ENGINEERED COVER SYSTEMS (VOLUME 33, NUMBER 10, DECEMBER 21, 2021)SRNSCOMMUNITY INVOLVEMENT3IRFARF-023511.pdf
02343811/01/2021SRNS-RP-2021-05045THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR THE U.S. DEPARTMENT OF ENERGY CONDUCTS PHASED SUBMITTALS OF THE SIXTH FIVE YEAR REMEDY REVIEW AT SAVANNAH RIVER SITE FOURTH PHASE: SAVANNAH RIVER SITE OPERABLE UNITS WITH GEOSYNTHETIC OR STABILIZATION SOLIDIFICATION COVER SYSTEMS (VOLUME 33, NUMBER 9, NOVEMBER 1, 2021)SRNSCOMMUNITY INVOLVEMENT3IRFARF-023438.pdf
02390807/01/2022SRNS-RP-2021-05001SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH GEOSYNTHETIC OR STABILIZATION / SOLIDIFICATION COVER SYSTEMS FACT SHEET (SRNS-RP-2021-05001, JULY 2022)SRNSSUPPORTING DOCUMENT6IRFARF-023908.pdf
02349412/01/2021SRNS-RP-2021-05001SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH GEOSYNTHETIC OR STABILIZATION/SOLIDIFICATION COVER SYSTEMS FACT SHEET (SRNS-RP-2021-05001, DECEMBER 2021)SRNSSUPPORTING DOCUMENT6IRFARF-023494.pdf
02340409/30/2021SRNS-RP-2021-04771THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR THE RECORD OF DECISION AVAILABLE FOR THE STORMWATER OUTFALL A-013 OPERABLE UNIT AT THE SAVANNAH RIVER SITE (VOLUME 33, NUMBER 8, SEPTEMBER 30, 2021)SRNSCOMMUNITY INVOLVEMENT2IRFARF-023404.pdf
02340109/01/2021SRNS-RP-2021-04758EFFECTIVENESS MONITORING REPORT (EMR) FOR THE C-AREA GROUNDWATER (CAGW) OPERABLE UNIT REMOVAL ACTION (U) JULY 2020 THROUGH JULY 2021 (SRNS-RP-2021-04758, REVISION 0, SEPTEMBER 2021) SEMS NUMBER: 82SRNSSUPPORTING DOCUMENT322ARFARF-023401.pdf
02349610/01/2021SRNS-RP-2021-04358SCOPING SUMMARY FOR THE SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH GEOSYNTHETIC OR STABILIZATION/SOLIDIFICATION COVER SYSTEMS (U) (SRNS-RP-2021-04358, FINAL, OCTOBER 2021)SRNSSUPPORTING DOCUMENT20ARFARF-023496.pdf