Administrative Record File/Information Repository File (ARF/IRF)

Jump To:

Index of documents (PDF) – a list of documents contained in the ARF/IRF, which are available at the University of South Carolina Libraries – Aiken and Columbia – on CD. This index is in PDF (portable document format) which requires Adobe Acrobat Reader software to be installed on your computer. The index is currently dated 1/8/2026 and lists entries numbered from 000001 to 025261.

Individual PDFs or each document are currently posted on the list below, which includes documents dated from 10/1/2017 to 1/8/2026. The list can be sorted by Catalog Number, Date, or Document Number by clicking on the blue text at the top of each respective column of data. The Index of Documents and PDFs will be updated quarterly. Historical PDFs will be added at a later date.

Disclaimer: The scanning process used to transfer documents into the portable document format may unintentionally create minor inaccuracies in the text. The viewer is warned that minor spelling errors may occur and numerical data may be missing decimal points or exponential values. Should the viewer have any questions regarding a particular section of text, an accurate hardcopy is always available from the Area Completion Project Document Control at the Savannah River Site, Luchelle Abney at (803) 952-7401.

Introduction

The Administrative Record File contains the documents and information considered or relied on in the selection of a response action and in controlling hazardous waste management activities. At the Savannah River Site, the Administrative Record File will fulfill the requirements of Section XXXIV, Administrative Record, of the Federal Facility Agreement (FFA).

An Administrative Record File for an individual waste unit is initiated upon the approval by the EPA-IV and the SCDHEC of an RFI/RI Work Plan. The File is compiled until the decision of the response action is chosen (the signing of the Record of Decision). At that time the Administrative Record File is finalized and is called the Administrative Record for that waste unit.

An Administrative Record serves two primary purposes. First, it is a vehicle for public participation in the selection of the response action. Section 113(k)(2) of CERCLA provides the public with an opportunity to participate in a response decision. The Administrative Record makes available the information considered or relied on in the selection and provides the opportunity for public involvement. Without opportunity for this involvement of interested persons, the limitation of court review solely to the Administrative Record can be challenged. Therefore, the Administrative Record will also record the public participation in the decision process and reflect the views of members of the public.

The second purpose of the Administrative Record is concerned with the presentation of evidence in the event of litigation. Judicial review of any issue concerning the adequacy of a response selection is limited to the Administrative Record. Under section 113(j)(2) of CERCLA, the trial court reviewing the selected response decision is limited the facts as set out in the Administrative Record. The Courts will not allow the use of discovery, hearings or additional fact findings unless the Administrative Record is found to be incomplete or poorly prepared. Provided the Administrative Record is adequate, the court will limit its review of the response decision made to the standard of arbitrary and capricious or otherwise not in accordance with the law. The Administrative Record should therefore chronicle the response decision process, whereby a judge could easily follow how and why a decision was made.

An Information Repository File contains information and documents that do not meet the definition of Administrative Record Files but that contain site and unit information, documents on site and unit activities, and general information.

Each entry in the Administrative Record File Index contains the following information:

  • ARF/IRF Catalog Number – A unique number assigned to each document or piece of information. For those documents that are microfilmed, the number is stamped on the top of the document to aid in locating the document on the microfilm.
  • Date –The date the document or information was issued.
  • Document Number – Many of the documents published or produced by the SCDHEC, EPA and SRS are assigned unique numbers. If no document number has been assigned, it is so indicated by the entry of a unique sequence number known as the catalog number. This number is for electronic tracking only.
  • Title –The title of the document, or a brief description of the contents.
  • Author – The person or party responsible for the issuance or writing of the document or information
  • Author Affiliation – The organization that the author works for or is affiliated with.
  • Addressee – In most cases this entry will be blank except if the document is correspondence. The entry, in that case, will be the individual(s) to whom the correspondence was addressed.
  • Addressee Affiliation – In most cases this entry will be blank except if the document is correspondence. The entry in that case will be the organization(s) to which the Addressee is affiliated.
  • Appx. No. of Pages – The approximate number of pages the document contains.
  • Document Type – Each document is categorized according to one of the following types of information:
    • Community Involvement/Relations
    • Correspondence
    • Draft RFI/RI Work Plan
    • Federal Facility Agreement
    • Final RFI/RI Work Plan
    • Guidance
    • Interim Action Proposed Plan
    • Meeting Minutes
    • Proposed Plan
    • Risk Assessment Document
    • Site Evaluation Report
    • Supporting Document
  • Classification – The entry will contain one of the three following codes:
    • U – The information is unclassified and available to the general public for viewing.
    • CP – The information or document is considered confidential or privileged. The document may contain sensitive information and is not available to the general public. It may be included in an Administrative Record File as it was used to support the decision making, but cannot be made publicly available.

PDF Downloads

3870 records available.

CATALOG NUMBERDATEDOCUMENT NUMBER ↓TITLEAUTHORADDRESSEEDOC TYPEAPPX # OF PAGESFILE TYPEPDF FILE
02507407/28/2025SRNS-RP-2025-00914488-4D ASH LANDFILL ANNUAL GROUNDWATER MONITORING REPORT 2024 DATA (SRNS-RP-2025-00914, REVISION 0, JULY 2025) SEMS NUMBER: 63SRNS, SRNSSUPPORTING DOCUMENT29IRFARF-025074.pdf
02513409/11/2025SRNS-RP-2025-00853SCOPING SUMMARY FOR THE PERIODIC REPORT ON THE BIOASSESSMENT OF SAVANNAH RIVER SITE STREAMS (2025 PERIODIC REPORT ON THE BIOASSESSMENT OF SRS STREAMS SCOPING) (SRNS-RP-2025-00853, JULY 2025 (FINAL)) SEMS NUMBERS: 69, 70, 71, 74,84SRNS, SRNSSUPPORTING DOCUMENT34IRFARF-025134.pdf
02504306/26/2025SRNS-RP-2025-00815RESULTS FROM THE 2023-2024 EVALUATION OF THE SOIL VAPOR EXTRACTION SYSTEM AT THE TNX OPERABLE UNIT (SRNS-RP-2025-00815, REVISION 0, JUNE 2025) SEMS NUMBERS: 21, 29MULLINS, JACOBSUPPORTING DOCUMENT102IRFARF-025043.pdf
02520610/30/2025SRNS-RP-2025-00790UNITED STATES DEPARTMENT OF ENERGY STATEMENT OF BASIS/PROPOSED PLAN FACT SHEET FOR THE ECODS L-3, L-AREA RUBBLE PIT (131-1L), AND L-AREA RUBBLE PIT (131-4L) OU (SRNS-RP-2025-00790, OCTOBER 2025) (REDLINE) SEMS NUMBER: 91SRNS, SRNSSUPPORTING DOCUMENT6IRFARF-025206.pdf
02501806/05/2025SRNS-RP-2025-00790UNITED STATES DEPARTMENT OF ENERGY STATEMENT OF BASIS/PROPOSED PLAN FACT SHEET FOR THE ECODS L-3, L-AREA RUBBLE PIT (131-1L), AND L-AREA RUBBLE PIT (131-4L) OU (SRNS-RP-2025-00790, JUNE 2025) SEMS NUMBER: 91OQUINN, SADIKASUPPORTING DOCUMENT6IRFARF-025018.pdf
02501706/05/2025SRNS-RP-2025-00724STATEMENT OF BASIS/PROPOSED PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE L-3 (NBN), L-AREA RUBBLE PIT (131-1L), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT (U) (SRNS-RP-2025- 00724, REVISION 0, JUNE 2025) SEMS NUMBERS: 91OQUINN, SADIKASTATEMENT OF BASIS / PROPOSED PLAN60IRFARF-025017.pdf
02520510/30/2025SRNS-RP-2025-00724STATEMENT OF BASIS/PROPOSED PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE L-3 (NBN), L-AREA RUBBLE PIT (131-1L), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT (U) (SRNS-RP-2025-00724, REVISION 1 REDLINE, OCTOBER 2025) SEMS NUMBER: 91SRNS, SRNSSTATEMENT OF BASIS / PROPOSED PLAN60IRFARF-025205.pdf
02512909/10/2025SRNS-RP-2025-00719REMEDIAL INVESTIGATION REPORT WITH BASELINE RISK ASSESSMENT FOR THE AUTOMOTIVE REPAIR SHOP (716-A) OPERABLE UNIT (U) (SRNS-RP-2025-00719, REVISION 0, SEPTEMBER 2025) SEMS NUMBER: 62SRNS, SRNSRFI/RI REPORT W/BRA403IRFARF-025129.pdf
02502406/17/2025SRNS-RP-2025-00708EFFECTIVENESS MONITORING REPORT FOR THE MONITORED NATURAL ATTENUATION (MNA) AT THE CHEMICALS, METALS, AND PESTICIDES (CMP) PITS OPERABLE UNIT (OU) (U) APRIL 2024 THROUGH MARCH 2025 (SRNS-RP-2025-00708, REVISION 0, JUNE 2025) SEMS NUMBER: 24JONES, CALEBFULMER, SUSAN|RICHARDS, JONSUPPORTING DOCUMENT387ARFARF-025024.pdf
02504206/26/2025SRNS-RP-2025-006762024 ANNUAL COMPREHENSIVE TNX AREA GROUNDWATER MONITORING AND REMEDIAL ACTION EFFECTIVENESS INTERIM REPORT (U) (SRNS-RP-2025-00676, REVISION 0, JUNE 2025) SEMS NUMBERS: 21, 29WILLEY, ADAMSUPPORTING DOCUMENT540IRFARF-025042.pdf
02503606/24/2025SRNS-RP-2025-00608BIENNIAL EFFECTIVENESS MONITORING REPORT (EMR) FOR MONITORED NATURAL ATTENUATION (MNA) AT THE C-AREA BURNING/RUBBLE PIT (131-C) AND OLD C-AREA BURNING/RUBBLE PIT (NBN) OPERABLE UNIT (U) JANUARY 2023 THROUGH DECEMBER 2024 (SRNS-RP-2025-00608, REVISION 0, JUNE 2025) SEMS NUMBER: 31MCGREGOR, HEATHSUPPORTING DOCUMENT260IRFARF-025036.pdf
02497903/25/2025SRNS-RP-2025-003452024 ANNUAL GROUNDWATER MONITORING REPORT FOR THE F- AND H-AREA RADIOACTIVE LIQUID WASTE TANK FARMS (U) (SRNS-RP-2025-00345, REVISION 0, MARCH 2025)MCFALLS, SHELIASUPPORTING DOCUMENT74IRFARF-024979.pdf
02525412/30/2025SRNS-RP-2025-00266DOE SUBMITTAL OF THE CORRECTIVE MEASURES IMPLEMENTATION REPORT (CMIR)/ REMEDIAL ACTION COMPLETION REPORT (RACR) FOR M-AREA INACTIVE PROCESS SEWER LINES (081-M) OPERABLE UNIT (OU) (U) (SRNS-RP-2025-00266, REVISION 0, JUNE 2025) (CERTIFIED CLEAN COPY) SEMS NUMBER: 19BAKER, MATTHEWFULMER, SUSAN|RICHARDS, JONCORRESPONDENCE2IRFARF-025254.pdf
02503406/20/2025SRNS-RP-2025-00266CORRECTIVE MEASURES IMPLEMENTATION REPORT (CMIR)/REMEDIAL ACTION COMPLETION REPORT (RACR) FOR M-AREA INACTIVE PROCESS SEWER LINES (081-M) OPERABLE UNIT (OU) (U) (SRNS-PR-2025-00266, REVISION 0, JUNE 2025) SEMS NUMBER 19ROLLS, EMILYFULMER, SUSAN B.|RICHARDS, JONPCR/CMIR/RACR86ARFARF-025034.pdf
02525512/30/2025SRNS-RP-2025-00266CORRECTIVE MEASURES IMPLEMENTATION REPORT (CMIR)/ REMEDIAL ACTION COMPLETION REPORT (RACR) FOR M-AREA INACTIVE PROCESS SEWER LINES (081-M) OPERABLE UNIT (OU) (U) (SRNS-RP-2025-00266, REVISION 0, JUNE 2025) (CERTIFIED CLEAN COPY) SEMS NUMBER: 19SRNS, SRNSPCR/CMIR/RACR86IRFARF-025255.pdf
02494904/10/2025SRNS-RP-2025-00161CONTAMINANT FATE AND TRANSPORT MODELING FOR C-REACTOR LEAD AND HEAVY WATER SOURCESSRNSSUPPORTING DOCUMENT33IRFARF-024949.pdf
02521603/31/2025SRNS-RP-2025-00119FY2024 PERFORMANCE ASSESSMENT ANNUAL REPORT REVIEW FOR THE E-AREA LOW-LEVEL WASTE FACILITY (SRNS-RP-2025-00119, REVISION 0, MARCH 2025MAYER, JOHN|DIXON, KENNETH L.|STEWART, IRA J.SUPPORTING DOCUMENT37ARFARF-025216.pdf
02524512/16/2025SRNS-RP-2025-00079A-AREA BURNING/RUBBLE PITS (731-A, -1A) AND RUBBLE PIT (731-2A) AND THE MISCELLANEOUS CHEMICAL BASIN/METALS BURNING PIT (731-4A, -5A) OPERABLE UNIT­JANUARY THROUGH DECEMBER 2024 (U) (SRNS-RP-2025-00079, REVISION 1, DECEMBER 2025) (REDLINE COPY) SEMS NUMBER: 28SRNS, SRNSSUPPORTING DOCUMENT82ARFARF-025245.pdf
02498405/19/2025SRNS-RP-2025-00079PERFORMANCE EVALUATION REPORT FOR THE A-AREA BURNING/RUBBLE PITS (731-A, -1A) AND RUBBLE PIT (731-2A) AND THE MISCELLANEOUS CHEMICAL BASIN/METALS BURNING PIT (731-4A, -5A) OPERABLE UNIT – JANUARY THROUGH DECEMBER 2024 (U) (SRNS-RP-2025-00079, REVISION 0, MAY 2025) SEMS NUMBER: 28JONES, CALEBSUPPORTING DOCUMENT82IRFARF-024984.pdf
02524612/16/2025SRNS-RP-2025-00079A-AREA BURNING/RUBBLE PITS (731-A, -1A) AND RUBBLE PIT (731-2A) AND THE MISCELLANEOUS CHEMICAL BASIN/METALS BURNING PIT (731-4A, -5A) OPERABLE UNIT -JANUARY THROUGH DECEMBER 2024 (U) (SRNS-RP-2025-00079, REVISION 1, DECEMBER 2025) (CLEAN COPY) SEMS NUMBER: 28SRNS, SRNSSUPPORTING DOCUMENT82ARFARF-025246.pdf
02485304/27/2023SRNS-RP-2025-00071THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR NOTICE OF PROPOSED FLOODPLAIN ACTION AT SAVANNAH RIVER SITE (VOLUME 35, NUMBER 3, APRIL 27, 2023)SRNSCOMMUNITY INVOLVEMENT2ARFARF-024853.pdf
02485210/04/2022SRNS-RP-2025-00070THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR NOTICE OF FLOODPLAIN AND WETLAND ACTION AT SAVANNAH RIVER SITE (VOLUME 34, NUMBER 3, OCTOBER 4, 2022)SRNSCOMMUNITY INVOLVEMENT2ARFARF-024852.pdf
02491703/17/2025SRNS-RP-2024-01436GROUNDWATER REPORT FOR THE P-AREA GROUNDWATER (PAGW) OPERABLE UNIT (OU) (U) APRIL 2023 THROUGH MARCH 2024 DATA (SRNS-RP-2024-01436, REVISION 0, FEBRUARY 2025) SEMS NUMBER: 81SRNSSUPPORTING DOCUMENT220IRFARF-024917.pdf
02502506/17/2025SRNS-RP-2024-01410GROUNDWATER MODEL UPDATE FOR CHEMICALS, METALS, AND PESTICIDES (CMP) PITS OPERABLE UNIT (OU) (U) (SRNS-RP-2024-01410, REVISION 0, JUNE 2025) SEMS NUMBER: 24JONES, CALEBFULMER, SUSAN|RICHARDS, JONSUPPORTING DOCUMENT56ARFARF-025025.pdf
02485001/07/2025SRNS-RP-2024-01405THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR NOTICE OF PUBLIC AVAILABILITY FOR SEVENTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH NATIVE SOIL COVERS AND/OR LAND USE CONTROLS (VOLUME 37, NUMBER 1, DATED JANUARY 7, 2025)SRNSCOMMUNITY INVOLVEMENT4ARFARF-024850.pdf
02478211/25/2024SRNS-RP-2024-01334EFFECTIVENESS MONITORING REPORT (EMR) FOR THE C-AREA GROUNDWATER (CAGW) OPERABLE UNIT (OU) REMOVAL ACTION (U) – JULY 2023 THROUGH JUNE 2024 (SRNS-RP-2024-01334, REVISION 0, NOVEMBER 2024) SEMS NUMBER: 82SRNSSUPPORTING DOCUMENT416IRFARF-024782.pdf
02477111/14/2024SRNS-RP-2024-01303FEDERAL FACILITY AGREEMENT ANNUAL PROGRESS REPORT FOR FISCAL YEAR 2024 (U) (SRNS-RP-2024-01303, NOVEMBER 2024)SRNSANNUAL PROGRESS REPORT32IRFARF-024771.pdf
02477611/21/2024SRNS-RP-2024-01267D-AREA GROUNDWATER OPERABLE UNIT (OU) ANNUAL DATA SUMMARY REPORT-2023 DATA (U) (SRNS-RP-2024-01267, REVISION 0, NOVEMBER 2024)SRNSSUPPORTING DOCUMENT117IRFARF-024776.pdf
02469609/12/2024SRNS-RP-2024-01123THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR U.S. DEPARTMENT OF ENERGY CONDUCTS PHASED SUBMITTALS OF THE SEVENTH FIVE-YEAR REMEDY REVIEW AT SAVANNAH RIVER SITE SECOND PHASE: SAVANNAH RIVER SITE OPERABLE UNITS WITH GROUNDWATER REMEDIES (VOLUME 36, NUMBER 3, DATED SEPTEMBER 12, 2024)SRNSCOMMUNITY INVOLVEMENT3IRFARF-024696.pdf
02499005/22/2025SRNS-RP-2024-01034FOCUSED CORRECTIVE MEASURES STUDY/FEASIBILITY STUDY FOR D-AREA ASH BASIN WETLANDS (NBN) IN SUPPORT OF THE SAVANNAH RIVER AND FLOODPLAIN SWAMP INTEGRATOR OPERABLE UNIT (U) (SRNS-RP-2024-01034, REVISION 1, MAY 2025) (REDLINE PAGES) SEMS NUMBER: 69JONES, CALEBFEASIBILITY STUDY21IRFARF-024990.pdf
02474610/29/2024SRNS-RP-2024-01034FOCUSED CORRECTIVE MEASURES STUDY/FEASIBILITY STUDY FOR D-AREA ASH BASIN WETLANDS (NBN) IN SUPPORT OF THE SAVANNAH RIVER AND FLOODPLAIN SWAMP INTEGRATOR OPERABLE UNIT (U) (SRNS-RP-2024-01034, REVISION 0, OCTOBER 2024) SEMS NUMBER: 69SRNSFEASIBILITY STUDY248IRFARF-024746.pdf
02463807/31/2024SRNS-RP-2024-010082023 GROUNDWATER MIXING ZONE REPORT FOR THE D-AREA OIL SEEPAGE BASIN (631-G) (U) (SRNS-RP-2024-01008, REVISION 0, JULY 2024) SEMS NUMBER: 27SRNSSUPPORTING DOCUMENT195IRFARF-024638.pdf
02466408/29/2024SRNS-RP-2024-009982024 EFFECTIVENESS MONITORING REPORT (EMR) FOR MONITORED NATURAL ATTENUATION (MNA) AT THE L-AREA SOUTHERN GROUNDWATER (LASG) OPERABLE UNIT DATA FROM 2022 THROUGH 2023 (SRNS-RP-2024-00998, REVISION 0, AUGUST 2024) SEMS NUMBER: 77SRNSSUPPORTING DOCUMENT137IRFARF-024664.pdf
02462607/25/2024SRNS-RP-2024-00941488-4D ASH LANDFILL ANNUAL GROUNDWATER MONITORING REPORT 2023 DATA (SRNS-RP-2024-00941, REVISION 0, JULY 2024) SEMS NUMBER:63SRNSSUPPORTING DOCUMENT26IRFARF-024626.pdf
02502806/17/2025SRNS-RP-2024-00936SEVENTH FIVE-YEAR REMEDY REVIEW REPORT FOR SRS OPERABLE UNITS WITH GROUNDWATER REMEDIES FACT SHEET (SRNS-RP-2024-00936, JUNE 2025) (REDLINE PAGE) SEMS NUMBER: 00OQUINN, SADIKAFULMER, SUSAN|RICHARDS, JONSUPPORTING DOCUMENT11ARFARF-025028.pdf
02481412/19/2024SRNS-RP-2024-00936SEVENTH FIVE-YEAR REMEDY REVIEW REPORT FOR SRS OPERABLE UNITS WITH GROUNDWATER REMEDIES FACT SHEET (SRNS-RP-2024-00936, DECEMBER 2024)SRNSSUPPORTING DOCUMENT6IRFARF-024814.pdf
02519110/22/2025SRNS-RP-2024-00936SEVENTH FIVE-YEAR REMEDY REVIEW REPORT FOR SRS OPERABLE UNITS WITH GROUNDWATER REMEDIES FACT SHEET (SRNS-RP-2024-00936, JUNE 2025) (CLEAN COPY) SEMS NUMBER: 00SRNS, SRNSSUPPORTING DOCUMENT6IRFARF-025191.pdf
02481512/19/2024SRNS-RP-2024-00935SCOPING SUMMARY FOR THE SEVENTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH GROUNDWATER REMEDIES (U) (SRNS-RP-2024-00935, FINAL, AUGUST 2024)SRNSSUPPORTING DOCUMENT20IRFARF-024815.pdf
02481312/19/2024SRNS-RP-2024-00934SEVENTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH GROUNDWATER REMEDIES (U) AIKEN, SOUTH CAROLINA (SRNS-RP-2024-00934, REVISION 0, DECEMBER 2024) SEMS NUMBER:00SRNSREMEDY REVIEW REPORT314IRFARF-024813.pdf
02522506/30/2025SRNS-RP-2024-00934THREE PARTY SIGNED SEVENTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH GROUNDWATER REMEDIES (U) (SRNS-RP-2024-00934, REVISION 1, JUNE 2025) SEMS NUMBER: 00SRNS, SRNSREMEDY REVIEW REPORT324IRFARF-025225.pdf
02502706/17/2025SRNS-RP-2024-00934SEVENTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH GROUNDWATER REMEDIES (U) AIKEN, SOUTH CAROLINA (SRNS-RP-2024-00934, REVISION 1, JUNE 2025) (REDLINE PAGES) SEMS NUMBER: 00OQUINN, SADIKAFULMER, SUSAN|RICHARDS, JONREMEDY REVIEW REPORT74ARFARF-025027.pdf
02522111/13/2025SRNS-RP-2024-00934U.S. DEPARTMENT OF ENERGY AND SOUTH CAROLINA DEPARTMENT OF ENVIRONMENTAL SERVICES SIGNED SEVENTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH GROUNDWATER REMEDIES (U) AIKEN, SOUTH CAROLINA (SRNS-RP-2024-00934, REVISION 1, JUNE 2025) SEMS NUMBER: 00SRNS, SRNSREMEDY REVIEW REPORT324IRFARF-025221.pdf
02519010/21/2025SRNS-RP-2024-00934U.S. DEPARTMENT OF ENERGY-SIGNED SEVENTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH GROUNDWATER REMEDIES (U) AIKEN, SOUTH CAROLINA (SRNS-RP-2024-00934, REVISION 1, JUNE 2025) SEMS NUMBER: 00SRNS, SRNSREMEDY REVIEW REPORT324IRFARF-025190.pdf
02485901/17/2025SRNS-RP-2024-00914EFFECTIVENESS MONITORING REPORT (EMR) FOR THE P-AREA GROUNDWATER (PAGW) OPERABLE UNIT (OU) ZERO VALENT IRON PERMEABLE REACTIVE BARRIER (ZVI-PRB) REMOVAL ACTION (U) – APRIL 2023 THROUGH MARCH 2024 (SRNS-RP-2024-00914, REVISION 0, DECEMBER 2024) SEMS NUMBER: 81SRNSSUPPORTING DOCUMENT132IRFARF-024859.pdf
02459806/26/2024SRNS-RP-2024-006822023 ANNUAL COMPREHENSIVE TNX AREA GROUNDWATER MONITORING AND REMEDIAL ACTION EFFECTIVENESS INTERIM REPORT (U) (SRNS-RP-2024-00682, REVISION 0, JUNE 2024) SEMS NUMBERS: 21, 29SRNSSUPPORTING DOCUMENT576IRFARF-024598.pdf
02462107/17/2024SRNS-RP-2024-00606EFFECTIVENESS MONITORING REPORT FOR THE MONITORED NATURAL ATTENUATION (MNA) AT THE CHEMICALS, METALS, AND PESTICIDES (CMP) PITS OPERABLE UNIT (OU) (U) APRIL 2023 THROUGH MARCH 2024 (SRNS-RP-2024-00606, REVISION 0, JULY 2024) SEMS NUMBER: 24SRNSSUPPORTING DOCUMENT339IRFARF-024621.pdf
02452004/04/2024SRNS-RP-2024-00416THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN NOTICE OF AVAILABILITY REMEDIAL DESIGN SHEET AVAILABLE FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) AT THE SAVANNAH RIVER SITE (VOLUME 36, NUMBER 1, APRIL 4, 2024)SRNSCOMMUNITY INVOLVEMENT1IRFARF-024520.pdf
02461107/03/2024SRNS-RP-2024-00312RCRA FACILITY INVESTIGATION/ REMEDIAL INVESTIGATION WORK PLAN ADDENDUM FOR THE D-AREA GROUNDWATER OPERABLE UNIT (D-AREA UPGRADIENT SOURCES) (U) (SRNS-RP-2024-00312, REVISION 1 REDLINE, JULY 2024)SRNSRFI/RI WORK PLAN100IRFARF-024611.pdf
02451704/04/2024SRNS-RP-2024-00312RCRA FACILITY INVESTIGATION/REMEDIAL INVESTIGATION WORK PLAN ADDENDUM FOR THE D-AREA GROUNDWATER OPERABLE UNIT (D-AREA UPGRADIENT SOURCES) (U) (SRNS-RP-2024-00312, REVISION 0, APRIL 2024) SEMS NUMBER: 63SRNSRFI/RI WORK PLAN100IRFARF-024517.pdf
02466108/29/2024SRNS-RP-2024-00312RCRA FACILITY INVESTIGATION/ REMEDIAL INVESTIGATION WORK PLAN ADDENDUM FOR THE D-AREA GROUNDWATER OPERABLE UNIT (D-AREA UPGRADIENT SOURCES) (U) (SRNS-RP-2024-00312, REVISION 1, JULY 2024) SEMS NUMBER: 63 (CERTIFIED, CLEAN COPY)SRNSRFI/RI WORK PLAN102IRFARF-024661.pdf
02474707/08/2024SRNS-RP-2024-00281SCOPING SUMMARY FOR D-AREA ASH BASIN WETLANDS (NBN) IN SUPPORT OF THE SAVANNAH RIVER AND FLOODPLAIN SWAMP INTEGRATOR OPERABLE UNIT (FOCUSED CORRECTIVE MEASURES STUDY / FEASIBILITY STUDY SCOPING) (SRNS-RP-2024-00281, FINAL, JULY 2024) SEMS NUMBER: 69SRNSSUPPORTING DOCUMENT30IRFARF-024747.pdf
02472110/08/2024SRNS-RP-2024-00222FOCUSED EARLY ACTION CORRECTIVE MEASURES STUDY/FEASIBILITY STUDY IN SUPPORT OF BENEFICIAL REUSE OF SELECT COAL ASH AND COAL FINES AT THE A-AREA ASH PILE (788-A), A-AREA COAL PILE RUNOFF BASIN (788-3A), F-AREA ASH LANDFILL (288-F), H-AREA ASH BASIN (288-H), K-AREA ASH BASIN (188-K), AND L-AREA ASH BASIN (188-L) OPERABLE UNITS (SRNS-RP-2024-00222, REVISION 0, OCTOBER 2024)SRNSFEASIBILITY STUDY470IRFARF-024721.pdf
02496305/01/2025SRNS-RP-2024-00222FOCUSED EARLY ACTION CORRECTIVE MEASURES STUDY/FEASIBILITY STUDY IN SUPPORT OF BENEFICIAL REUSE OF SELECT COAL ASH AND COAL FINES AT THE A-AREA ASH PILE (788-A), A-AREA COAL PILE RUNOFF BASIN (788-3A), F-AREA ASH LANDFILL (288-F), H-AREA ASH BASIN (288-H), K-AREA ASH BASIN (188-K), AND L-AREA ASH BASIN (188-L) OPERABLE UNITS (SRNS-RP-2024-00222, REVISION 1, MAY 2025) (REDLINE PAGES) SEMS NUMBERS: 61, 62, 88, 90, & 91SRNSFEASIBILITY STUDY52IRFARF-024963.pdf
02455405/08/2024SRNS-RP-2024-00115DOE SUBMITTAL OF PERFORMANCE EVALUATION REPORT FOR THE A-AREA BURNING/RUBBLE PITS (731-A, -1A) AND RUBBLE PIT (731-2A) AND THE MISCELLANEOUS CHEMICAL BASIN/METALS BURNING PIT (731-4A, -5A) OPERABLE UNIT – JANUARY THROUGH DECEMBER 2023 (U) (SRNS-RP-2024-00115, REVISION 0, MAY 2024) SEMS NUMBER: 28AVERY HAMMETTSUSAN FULMER JON RICHARDSCORRESPONDENCE2IRFARF-024554.pdf
02455505/08/2024SRNS-RP-2024-00115PERFORMANCE EVALUATION REPORT FOR THE A-AREA BURNING/RUBBLE PITS (731-A, -1A) AND RUBBLE PIT (731-2A) AND THE MISCELLANEOUS CHEMICAL BASIN/METALS BURNING PIT (731-4A, -5A) OPERABLE UNIT – JANUARY THROUGH DECEMBER 2023 (U) (SRNS-RP-2024-00115, REVISION 0, MAY 2024) SEMS NUMBER; 28SRNSSUPPORTING DOCUMENT60IRFARF-024555.pdf
02452303/26/2024SRNS-RP-2024-000422023 ANNUAL GROUNDWATER MONITORING REPORT FOR THE F- AND H-AREA RADIOACTIVE LIQUID WASTE TANK FARMS (U) (SRNS-RP-2024-00042, REVISION 0, MARCH 2024)SRNSSUPPORTING DOCUMENT72IRFARF-024523.pdf
02521404/17/2024SRNS-RP-2024-00027FY2023 PERFORMANCE ASSESSMENT ANNUAL REPORT REVIEW FOR THE E-AREA LOW-LEVEL WASTE FACILITY (SRNS-RP-2024-00027, REVISION 0, APRIL 2024)MAYER, JOHN|STEWART, IRA|DIXON, KENNETH L.SUPPORTING DOCUMENT39ARFARF-025214.pdf
02449202/29/2024SRNS-RP-2024-00015POST-CONSTRUCTION REPORT/CORRECTIVE MEASURES IMPLEMENTATION REPORT/REMEDIAL ACTION COMPLETION REPORT FOR THE WETLAND AREA AT DUNBARTON BAY IN SUPPORT OF STEEL CREEK INTEGRATOR OPERABLE UNIT (U) (SRNS-RP-2024-00015, REVISION 0, FEBRUARY 2024) SEMS NUMBER: 71SRNSPCR/CMIR/RACR44ARF-024492.pdf
02466208/29/2024SRNS-RP-2024-00015POST-CONSTRUCTION REPORT/CORRECTIVE MEASURES IMPLEMENTATION REPORT/REMEDIAL ACTION COMPLETION REPORT FOR THE WETLAND AREA AT DUNBARTON BAY IN SUPPORT OF STEEL CREEK INTEGRATOR OPERABLE UNIT (U) (SRNS-RP-2024-00015, REVISION 1, JUNE 2024) SEMS NUMBER: 71 (CERTIFIED, CLEAN COPY)SRNSPCR/CMIR/RACR46IRFARF-024662.pdf
02442612/22/2023SRNS-RP-2023-01396THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR NOTICE OF PUBLIC AVAILABILITY FOR FIFTH PHASE: SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH OPERATING EQUIPMENT (VOLUME 35, NUMBER 11)SRNSCOMMUNITY INVOLVEMENT4IRFARF-024426.pdf
02511808/21/2025SRNS-RP-2023-01365RESOURCE CONSERVATION AND RECOVERY ACT FACILITY INVESTIGATION/REMEDIAL INVESTIGATION REPORT WITH BASELINE RISK ASSESSMENT AND CORRECTIVE MEASURES STUDY/FEASIBILITY STUDY FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE L-3 (EAST OF L AREA) (NBN), L-AREA RUBBLE PIT (131-1L), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT (U) (SRNS-RP-2023-01365, REVISION 1, JANUARY 2025) (CERTIFIED CLEAN COPY) SEMS NUMBERS: 91SRNS, SRNSRFI/RI REPORT W/BRA AND CMS/FS812IRFARF-025118.pdf
02464007/31/2024SRNS-RP-2023-01365RESOURCE CONSERVATION AND RECOVERY ACT FACILITY INVESTIGATION/REMEDIAL INVESTIGATION REPORT WITH BASELINE RISK ASSESSMENT AND CORRECTIVE MEASURES STUDY/FEASIBILITY STUDY FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE L-3 (EAST OF L AREA) (NBN), L-AREA RUBBLE PIT (131-1L), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT (U) (SRNS-RP-2023-01365, REVISION 0, JULY 2024)SRNSRFI/RI REPORT W/BRA AND CMS/FS196IRFARF-024640.pdf
02491103/13/2025SRNS-RP-2023-01365RESOURCE CONSERVATION AND RECOVERY ACT FACILITY INVESTIGATION/REMEDIAL INVESTIGATION REPORT WITH BASELINE RISK ASSESSMENT AND CORRECTIVE MEASURES STUDY/FEASIBILITY STUDY FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE L-3 (EAST OF L AREA) (NBN), L-AREA RUBBLE PIT (131-1L), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT (U) (SRNS-RP-2023-01365, REVISION 1, JANUARY 2025) (REDLINE PAGES), SEMS NUMBERS: 91SRNSRFI/RI REPORT W/BRA AND CMS/FS96IRFARF-024911.pdf
02438611/30/2023SRNS-RP-2023-01323FEDERAL FACILITY AGREEMENT ANNUAL PROGRESS REPORT FOR FISCAL YEAR 2023 (SRNS-RP-2023-01323, NOVEMBER 2023)SRNSANNUAL PROGRESS REPORT32IRFARF-024386.pdf
02452604/11/2024SRNS-RP-2023-01281EFFECTIVENESS MONITORING REPORT (EMR) FOR THE P-AREA GROUNDWATER (PAGW) OPERABLE UNIT (OU) ZERO VALENT IRON PERMEABLE REACTIVE BARRIER (ZVI-PRB) REMOVAL ACTION (U) APRIL 2022 THROUGH MARCH 2023 (SRNS-RP-2023-01281, REVISION 0, MARCH 2024) SEMS NUMBER 81SRNSSUPPORTING DOCUMENT128IRFARF-024526.pdf
02456705/23/2024SRNS-RP-2023-01234DOE SUBMITTAL OF REMEDIAL INVESTIGATION WORK PLAN FOR THE AUTOMOTIVE REPAIR SHOP (716-A) OPERABLE UNIT (U) (SRNS-RP-2023-01234, REVISION 1, MAY 2024) (REDLINE PAGES AND CLEAN COPY) AND THE SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE REVISION 0 DOCUMENT, SEMS NUMBER: 62AVERY HAMMETTSUSAN FULMER JON RICHARDSCORRESPONDENCE5IRFARF-024567.pdf
02444601/16/2024SRNS-RP-2023-01234REMEDIAL INVESTIGATION WORK PLAN FOR THE AUTOMOTIVE REPAIR SHOP (716-A) OPERABLE UNIT (U) (SRNS-RP-2023-01234, REVISION 0, JANUARY 2024)SRNSRFI/RI WORK PLAN64IRFARF-024446.pdf
02456805/23/2024SRNS-RP-2023-01234REMEDIAL INVESTIGATION WORK PLAN FOR THE AUTOMOTIVE REPAIR SHOP (716-A) OPERABLE UNIT (U) (SRNS-RP-2023-01234, REVISION 1, MAY 2024) (REDLINE PAGES)SRNSRFI/RI WORK PLAN11IRFARF-024568.pdf
02456905/23/2024SRNS-RP-2023-0123REMEDIAL INVESTIGATION WORK PLAN FOR THE AUTOMOTIVE REPAIR SHOP (716-A) OPERABLE UNIT (U) (SRNS-RP-2023-01234, REVISION 1, MAY 2024) (REDLINE PAGES)SRNSRFI/RI WORK PLAN64IRFARF-024569.pdf
02456805/23/2024SRNS-RP-2023-0123REMEDIAL INVESTIGATION WORK PLAN FOR THE AUTOMOTIVE REPAIR SHOP (716-A) OPERABLE UNIT (U) (SRNS-RP-2023-01234, REVISION I, MAY 2024) (REDLINE PAGES)SRNSRFI/RI WORK PLAN11IRFARF-024568.pdf
02435611/02/2023SRNS-RP-2023-01199THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR U.S. DEPARTMENT OF ENERGY CONDUCTS PHASED SUBMITTALS OF THE SEVENTH FIVE-YEAR REMEDY REVIEW AT SAVANNAH RIVER SITE FIRST PHASE: SAVANNAH RIVER SITE OPERABLE UNITS WITH NATIVE SOIL COVERS AND/OR LAND USE CONTROLS (VOLUME 35, NUMBER 10, DATED NOVEMBER 2, 2023)SRNSCOMMUNITY INVOLVEMENT4IRFARF-024356.pdf
02434510/25/2023SRNS-RP-2023-00913EFFECTIVENESS MONITORING REPORT (EMR) FOR THE C-AREA GROUNDWATER (CAGW) OPERABLE UNIT (OU) REMOVAL ACTION (U) JULY 2022 THROUGH JUNE 2023 (SRNS-RP-2023-00913, REVISION 0, OCTOBER 2023) SEMS NUMBER: 82SRNSSUPPORTING DOCUMENT459IRFARF-024345.pdf
02427507/21/2023SRNS-RP-2023-00898THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FLOODPLAIN STATEMENT OF FINDINGS FOR THE FLOODPLAIN AND WETLAND ASSESSMENT FOR THE INSTALLATION OF A FIBER OPTIC CABLE FROM U.S. FOREST SERVICE-SAVANNAH RIVER HEADQUARTERS TO THE ADVANCED TACTICAL TRAINNING AREA AT THE SAVANNAH RIVER SITE (VOLUME 35, NUMBER 4, JULY 21, 2023)SRNSCOMMUNITY INVOLVEMENT2IRFARF-024275.pdf
02427507/21/2023SRNS-RP-2023-00898THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FLOODPLAIN STATEMENT OF FINDINGS FOR THE FLOODPLAIN AND WETLAND ASSESSMENT FOR THE INSTALLATION OF A FIBER OPTIC CABLE FROM U.S. FOREST SERVICE-SAVANNAH RIVER HEADQUARTERS TO THE ADVANCED TACTICAL TRAINNING AREA AT THE SAVANNAH RIVER SITESRNSCOMMUNITY INVOLVEMENT2IRFARF-024275.pdf
02428408/01/2023SRNS-RP-2023-008752022 ANNUAL COMPREHENSIVE TNX AREA GROUNDWATER MONITORING AND REMEDIAL ACTION EFFECTIVENESS INTERIM REPORT (U) (SRNS-RP-2023-00875, REVISION 0, AUGUST 2023) SEMS NUMBERS: 21, 29SRNSSUPPORTING DOCUMENT560ARFARF-024284.pdf
02427608/10/2023SRNS-RP-2023-00861THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN EXPLANATION OF SIGNIFICANT DIFFERENCE FOR THE REVISION 1 RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE WETLAND AREA AT DUNBARTON BAY IN SUPPORT OF STEEL CREEK INTEGRATOR OPERABLE UNIT (VOLUME 35)SRNSCOMMUNITY INVOLVEMENT2IRFARF-024276.pdf
02427608/10/2023SRNS-RP-2023-00861THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN EXPLANATION OF SIGNIFICANT DIFFERENCE FOR THE REVISION 1 RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE WETLAND AREA AT DUNBARTON BAY IN SUPPORT OF STEEL CREEK INTEGRATOR OPERABLE UNIT (VOLUME 35, NUMBER 5, AUGUST 10, 2023)SRNSCOMMUNITY INVOLVEMENT2IRFARF-024276.pdf
02472211/03/2023SRNS-RP-2023-00858SCOPING SUMMARY FOR THE A-AREA ASH PILE (788-A), A-AREA COAL PILE RUNOFF BASIN (788-3A), F-AREA ASH LANDFILL (288-F), H-AREA ASH BASIN (288-H), K-AREA ASH BASIN (188-K), AND L-AREA ASH BASIN (188-L) IN SUPPORT OF BENEFICIAL REUSE OF SELECT COAL ASH AND COAL FINES OPERABLE UNITS AT THE SAVANNAH RIVER SITE (FOCUSED EARLY ACTION CORRECTIVE MEASURES STUDY / FEASBILITY STUDY) (SRNS-RP-2023-00858, FINAL, NOVEMBER 2023)SRNSSUPPORTING DOCUMENT29IRFARF-024722.pdf
02513009/10/2025SRNS-RP-2023-00820SCOPING SUMMARY FOR THE AUTOMOTIVE REPAIR SHOP (716-A) OPERABLE UNIT (U) (POST-WORK PLAN CHARACTERIZATION) (SRNS-RP-2023-00820, JUNE 2025 (FINAL)) SEMS NUMBER: 62SRNS, SRNSSUPPORTING DOCUMENT28IRFARF-025130.pdf
02444501/16/2024SRNS-RP-2023-00820SCOPING SUMMARY FOR THE AUTOMOTIVE REPAIR SHOP (716-A) AND PAINT SHOP BUILDING (725-A) OPERABLE UNIT (U) (RI WORK PLAN CHARACTERIZATION) (SRNS-RP-2023-000820, OCTOBER 2023 (FINAL))SRNSSUPPORTING DOCUMENT36IRFARF-024445.pdf
02429108/30/2023SRNS-RP-2023-00758R-AREA GROUNDWATER (NBN) BIENNIAL EFFECTIVENESS MONITORING REPORT IN SUPPORT OF R-AREA OPERABLE UNIT (U) JANUARY 2021 THROUGH DECEMBER 2022 (SRNS-RP-2023-00758, REVISION 0, AUGUST 2023) SEMS NUMBER: 95SRNSSUPPORTING DOCUMENT166IRFARF-024291.pdf
02459306/24/2024SRNS-RP-2023-00758R-AREA GROUNDWATER (NBN) BIENNIAL EFFECTIVENESS MONITORING REPORT IN SUPPORT OF R-AREA OPERABLE UNIT (U) JANUARY 2021 THROUGH DECEMBER 2022 (SRNS-RP-2023-00758, REVISION 1, JUNE 2024) SEMS NUMBER: 95SRNSSUPPORTING DOCUMENT170IRFARF-024593.pdf
02470509/17/2024SRNS-RP-2023-00717SEVENTH FIVE-YEAR REMEDY REVIEW REPORT FOR SRS OPERABLE UNITS WITH NATIVE SOIL COVERS AND/OR LAND USE CONTROLS FACT SHEET (SRNS-RP-2023-00717, JUNE 2024) (CLEAN COPY)SRNSSUPPORTING DOCUMENT5IRFARF-024705.pdf
02458906/13/2024SRNS-RP-2023-00717SEVENTH FIVE-YEAR REMEDY REVIEW REPORT FOR SRS OPERABLE UNITS WITH NATIVE SOIL COVERS AND/OR LAND USE CONTROLS FACT SHEET (SRNS-RP-2023-00717, JUNE 2024) (REDLINE PAGE)SRNSSUPPORTING DOCUMENT1IRFARF-024589.pdf
02441712/21/2023SRNS-RP-2023-00717SEVENTH FIVE-YEAR REMEDY REVIEW REPORT FOR SRS OPERABLE UNITS WITH NATIVE SOIL COVERS AND/OR LAND USE CONTROLS FACT SHEET (SRNS-RP-2023-00717, DECEMBER 2023)SRNSSUPPORTING DOCUMENT5IRFARF-024417.pdf
02441812/21/2023SRNS-RP-2023-00716SCOPING SUMMARY FOR THE SEVENTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH NATIVE SOIL COVERS AND/OR LAND USE CONTROLS (U) (SRNS-RP-2023-00716, FINAL, OCTOBER 2023)SRNSSUPPORTING DOCUMENT20IRFARF-024418.pdf
02481112/19/2024SRNS-RP-2023-00715THREE PARTY SIGNED SEVENTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH NATIVE SOIL COVERS AND/OR LAND USE CONTROLS (U) AIKEN, SOUTH CAROLINA (SRNS-RP-2023-00715, REVISION 1, JUNE 2024) SEMS NUMBER: 00SRNSREMEDY REVIEW REPORT414IRFARF-024811.pdf
02458806/13/2024SRNS-RP-2023-00715SEVENTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH NATIVE SOIL COVERS AND/OR LAND USE CONTROLS (U) AIKEN, SOUTH CAROLINA (SRNS-RP-2023-00715, REVISION 1, JUNE 2024) (REDLINE PAGES)SRNSREMEDY REVIEW REPORT154IRFARF-024588.pdf
02470409/17/2024SRNS-RP-2023-00715U.S. DEPARTMENT OF ENERGY-SIGNED SEVENTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH NATIVE SOIL COVERS AND/OR LAND USE CONTROLS (U) AIKEN, SOUTH CAROLINA (SRNS-RP-2023-00715, REVISION 1, JUNE 2024)SRNSREMEDY REVIEW REPORT414IRFARF-024704.pdf
02441612/21/2023SRNS-RP-2023-00715SEVENTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH NATIVE SOIL COVERS AND/OR LAND USE CONTROLS (U) AIKEN, SOUTH CAROLINA (SRNS-RP-2023-00715, REVISION 0, DECEMBER 2023)SRNSREMEDY REVIEW REPORT414IRFARF-024416.pdf
02491503/14/2025SRNS-RP-2023-00689ADDENDUM TO THE SITE EVALUATION REPORT FOR THE SPILL ON 2/1/57 OF UNKNOWN OF SEEPAGE BASIN PIPE LEAK FROM 904-44G (NBN) (WSRC-RP-2003-4049, REVISION 0, JUNE 2003) (U) (SRNS-RP-2023-00689, REVISION 0, JANUARY 2025) SEMS NUMBER: 61SRNSSITE EVALUATION49IRFARF-024915.pdf
02510108/11/2025SRNS-RP-2023-00689ADDENDUM TO THE SITE EVALUATION REPORT FOR THE SPILL ON 2/1/57 OF UNKNOWN OF SEEPAGE BASIN PIPE LEAK FROM 904-44G (NBN) (WSRC-RP-2003-4049, REVISION 0, JUNE 2003) (U) (SRNS-RP-2023-00689, REVISION 1, JULY 2025) (CLEAN COPY) SEMS NUMBER: 61SRNS, SRNSSITE EVALUATION48IRFARF-025101.pdf
02510008/11/2025SRNS-RP-2023-00689ADDENDUM TO THE SITE EVALUATION REPORT FOR THE SPILL ON 2/1/57 OF UNKNOWN OF SEEPAGE BASIN PIPE LEAK FROM 904-44G (NBN) (WSRC-RP-2003-4049, REVISION 0, JUNE 2003) (U) (SRNS-RP-2023-00689, REVISION 1, JULY 2025) (REDLINE PAGES) SEMS NUMBER: 61SRNS, SRNSSITE EVALUATION14IRFARF-025100.pdf
02422706/01/2023SRNS-RP-2023-00648BIENNIAL EFFECTIVENESS MONITORING REPORT (EMR) FOR MONITORED NATURAL ATTENUATION (MNA) AT THE C-AREA BURNING/RUBBLE PIT (131-C) AND OLD C-AREA BURNING/RUBBLE PIT (NBN) OPERABLE UNIT (U) JANUARY 2021 THROUGH DECEMBER 2022 (SRNS-RP-2023-00648, REVISION 0, JUNE 2023) SEMS NUMBER: 31SRNSSUPPORTING DOCUMENT238ARFARF-024227.pdf
02448303/04/2024SRNS-RP-2023-00536LAND USE CONTROL IMPLEMENTATION PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-20), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2023-00536, REVISION 1, JANUARY 2024) (CLEAN COPY) SEMS NUMBER: 93SRNSLAND USE CONTROL IMPLEMENTATION PLAN38IRFARF-024483.pdf
02427308/01/2023SRNS-RP-2023-00536LAND USE CONTROL IMPLEMENTATION PLAN FOR THE EARLY CONSTRUCITON AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2023-00536, REVISION 0, AUGUST 2023) SEMS NUMBER: 93SRNSLAND USE CONTROL IMPLEMENTATION PLAN38ARFARF-024273.pdf
02448303/04/2024SRNS-RP-2023-00536LAND USE CONTROL IMPLEMENTATION PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2023-00536, REVISION 1, JANUARY 2024) (CLEAN COPY) SEMS NUMBER: 93SRNSLAND USE CONTROL IMPLEMENTATION PLAN38IRFARF-024483.pdf
02443901/10/2024SRNS-RP-2023-00536LAND USE CONTROL IMPLEMENTATION PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2023-00536, REVISION 1 REDLINE, JANUARY 2024)SRNSLAND USE CONTROL IMPLEMENTATION PLAN40IRFARF-024439.pdf
02451304/02/2024SRNS-RP-2023-00535THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR NOTICE OF AVAILABILITY OF REMEDIAL DESIGN FACT SHEET AVAILABLE FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) AT THE SAVANNAH RIVER SITESRNSCOMMUNITY INVOLVEMENT1IRFARF-024513.pdf
02427208/01/2023SRNS-RP-2023-00535CORRECTIVE MEASURES IMPLEMENTATION PLAN/REMEDIAL ACTION IMPLEMENTATION PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2023-00535, REVISION 0, AUGUST 2023), SEMS NUMBER: 93SRNSCORRECTIVE MEASURES IMPLEMENTATION REMEDIAL ACTION IMPLEMENTATION PLAN92ARFARF-024272.pdf