Administrative Record File/Information Repository File (ARF/IRF)

Jump To:

Index of documents (PDF) – a list of documents contained in the ARF/IRF, which are available at the University of South Carolina Libraries – Aiken and Columbia – on CD. This index is in PDF (portable document format) which requires Adobe Acrobat Reader software to be installed on your computer. The index is currently dated 1/8/2026 and lists entries numbered from 000001 to 025261.

Individual PDFs or each document are currently posted on the list below, which includes documents dated from 10/1/2017 to 1/8/2026. The list can be sorted by Catalog Number, Date, or Document Number by clicking on the blue text at the top of each respective column of data. The Index of Documents and PDFs will be updated quarterly. Historical PDFs will be added at a later date.

Disclaimer: The scanning process used to transfer documents into the portable document format may unintentionally create minor inaccuracies in the text. The viewer is warned that minor spelling errors may occur and numerical data may be missing decimal points or exponential values. Should the viewer have any questions regarding a particular section of text, an accurate hardcopy is always available from the Area Completion Project Document Control at the Savannah River Site, Luchelle Abney at (803) 952-7401.

Introduction

The Administrative Record File contains the documents and information considered or relied on in the selection of a response action and in controlling hazardous waste management activities. At the Savannah River Site, the Administrative Record File will fulfill the requirements of Section XXXIV, Administrative Record, of the Federal Facility Agreement (FFA).

An Administrative Record File for an individual waste unit is initiated upon the approval by the EPA-IV and the SCDHEC of an RFI/RI Work Plan. The File is compiled until the decision of the response action is chosen (the signing of the Record of Decision). At that time the Administrative Record File is finalized and is called the Administrative Record for that waste unit.

An Administrative Record serves two primary purposes. First, it is a vehicle for public participation in the selection of the response action. Section 113(k)(2) of CERCLA provides the public with an opportunity to participate in a response decision. The Administrative Record makes available the information considered or relied on in the selection and provides the opportunity for public involvement. Without opportunity for this involvement of interested persons, the limitation of court review solely to the Administrative Record can be challenged. Therefore, the Administrative Record will also record the public participation in the decision process and reflect the views of members of the public.

The second purpose of the Administrative Record is concerned with the presentation of evidence in the event of litigation. Judicial review of any issue concerning the adequacy of a response selection is limited to the Administrative Record. Under section 113(j)(2) of CERCLA, the trial court reviewing the selected response decision is limited the facts as set out in the Administrative Record. The Courts will not allow the use of discovery, hearings or additional fact findings unless the Administrative Record is found to be incomplete or poorly prepared. Provided the Administrative Record is adequate, the court will limit its review of the response decision made to the standard of arbitrary and capricious or otherwise not in accordance with the law. The Administrative Record should therefore chronicle the response decision process, whereby a judge could easily follow how and why a decision was made.

An Information Repository File contains information and documents that do not meet the definition of Administrative Record Files but that contain site and unit information, documents on site and unit activities, and general information.

Each entry in the Administrative Record File Index contains the following information:

  • ARF/IRF Catalog Number – A unique number assigned to each document or piece of information. For those documents that are microfilmed, the number is stamped on the top of the document to aid in locating the document on the microfilm.
  • Date –The date the document or information was issued.
  • Document Number – Many of the documents published or produced by the SCDHEC, EPA and SRS are assigned unique numbers. If no document number has been assigned, it is so indicated by the entry of a unique sequence number known as the catalog number. This number is for electronic tracking only.
  • Title –The title of the document, or a brief description of the contents.
  • Author – The person or party responsible for the issuance or writing of the document or information
  • Author Affiliation – The organization that the author works for or is affiliated with.
  • Addressee – In most cases this entry will be blank except if the document is correspondence. The entry, in that case, will be the individual(s) to whom the correspondence was addressed.
  • Addressee Affiliation – In most cases this entry will be blank except if the document is correspondence. The entry in that case will be the organization(s) to which the Addressee is affiliated.
  • Appx. No. of Pages – The approximate number of pages the document contains.
  • Document Type – Each document is categorized according to one of the following types of information:
    • Community Involvement/Relations
    • Correspondence
    • Draft RFI/RI Work Plan
    • Federal Facility Agreement
    • Final RFI/RI Work Plan
    • Guidance
    • Interim Action Proposed Plan
    • Meeting Minutes
    • Proposed Plan
    • Risk Assessment Document
    • Site Evaluation Report
    • Supporting Document
  • Classification – The entry will contain one of the three following codes:
    • U – The information is unclassified and available to the general public for viewing.
    • CP – The information or document is considered confidential or privileged. The document may contain sensitive information and is not available to the general public. It may be included in an Administrative Record File as it was used to support the decision making, but cannot be made publicly available.

PDF Downloads

3870 records available.

CATALOG NUMBER ↓DATEDOCUMENT NUMBERTITLEAUTHORADDRESSEEDOC TYPEAPPX # OF PAGESFILE TYPEPDF FILE
02516110/08/2025ER-IDS-019-037H-AREA INACTIVE PROCESS SEWER FIELD INSPECTION CHECKLISTHEISE, BRONSONSUPPORTING DOCUMENT2ARFARF-025161.pdf
02516005/14/2025ER-IDS-019-019F-AREA HAZARDOUS WASTE MANAGEMENT FACILITY (BLDGS. 904-41G, 904-42G AND 904-43G) FIELD INSPECTION CHECKLISTHEISE, BRONSONSUPPORTING DOCUMENT4ARFARF-025160.pdf
02515909/15/2025ER-IDS-019-007L-AREA OIL AND CHEMICAL BASIN (BLDG. 904-83G) FIELD INSPECTION CHECKLISTHEISE, BRONSONSUPPORTING DOCUMENT8ARFARF-025159.pdf
02515810/08/2025ER-IDS-019-032T-AREA OPERABLE UNIT (TAOU) FIELD INSPECTION CHECKLISTHEISE, BRONSONSUPPORTING DOCUMENT8ARFARF-025158.pdf
02515710/08/2025ER-IDS-019-048R-REACTOR SEEPAGE BASINS 904-57G, 904-58G, 904-69G, 904-60G, 904-103G AND 904-104G FIELD INSPECTION CHECKLISTHEISE, BRONSONSUPPORTING DOCUMENT8ARFARF-025157.pdf
02515610/08/2025ER-IDS-019-050M-AREA INACTIVE PROCESS SEWER LINE (MIPSL) OPERABLE UNIT 081-M FIELD INSPECTION CHECKLISTHEISE, BRONSONSUPPORTING DOCUMENT8ARFARF-025156.pdf
02515510/08/2025ER-IDS-019-058EARLY ACTION LAND USE CONTROL IMPLEMENTATION PLAN AT K-AREA REACTOR BUILDING OCMPLEX FIELD INSPECTION CHECKLISTHEISE, BRONSONSUPPORTING DOCUMENT7ARFARF-025155.pdf
02515410/08/2025ER-IDS-019-059EARLY ACTION LAND USE CONTROL IMPLEMENTATION PLAN AT L-AREA REACTOR BUILDING COMPLEX FIELD INSPECTION CHECKLISTHEISE, BRONSONSUPPORTING DOCUMENT7ARFARF-025154.pdf
02515310/08/2025ER-IDS-019-060EARLY ACTION LAND USE CONTROL IMPLEMENTATION PLAN AT C-AREA REACTOR BUILDING COMPLEX FIELD INSPECTION CHECKLISTHEISE, BRONSONSUPPORTING DOCUMENT5ARFARF-025153.pdf
02515209/04/2025ER-IDS-019-067D-AREA COAL PILE RUNOFF BASIN (489-D NORTH) FIELD INSPECTION CHECKLISTHEISE, BRONSONSUPPORTING DOCUMENT9ARFARF-025152.pdf
02515109/09/2025ER-IDS-019-069OUTFALL C-03 C-AREA OPERABLE UNIT FIELD INSPECTION CHECKLISTHEISE, BRONSONSUPPORTING DOCUMENT8ARFARF-025151.pdf
02515009/15/2025ER-IDS-019-079F-AREA INACTIVE PROCESS SEWER LINE (FIPSL) FIELD INSPECTION CHECKLISTHEISE, BRONSONSUPPORTING DOCUMENT7ARFARF-025150.pdf
02514910/07/2025SRNS-OS-2025-00309EPA APPROVAL OF THE CORRECTIVE MEASURES IMPLEMENTATION REPORT (CMIR)/REMEDIAL ACTION COMPLETION REPORT (RACR) FOR M-AREA INACTIVE PROCESS SEWER LINES (081-M) OPERABLE UNIT (OU) (U), SEMS NUMBER: 19 (SRNS-RP-2025-00266, REVISION 0, JUNE 2025)RICHARDS, JONBAKER, MATTHEWCORRESPONDENCE1IRFARF-025149.pdf
02514810/02/2025RDDD-25-168DOE SUBMITTAL OF THE FEDERAL FACILITY AGREEMENT REVISION 0 APPENDIX H SOLID WASTE MANAGEMENT UNITS FOR FISCAL YEAR 2026 (PRINT DATE: 09/29/2025)BAKER, MATTHEWFULMBER, SUSAN|RICHARDS, JONCORRESPONDENCE35IRFARF-025148.pdf
02514710/01/2025RDDD-25-167DOE SUBMITTAL OF THE FEDERAL FACILITY AGREEMENT REVISION 0 APPENDIX C RCRA/CERCLA UNITS, REVISION 0 APPENDIX G SITE EVALUATION AREAS, AND REVISION 0 APPENDIX K D&D FACILITIES FOR FISCAL YEAR 2026 (PRINT DATE: 09/29/2025)BAKER, MATTHEWFULMER, SUSAN|RICHARDS, JONCORRESPONDENCE134IRFARF-025147.pdf
02514610/01/2025RDDD-25-165DOE SUBMITTAL OF THE THIRTY (30)-DAY EXTENSION NOTIFICATION FOR THE REDLINE PAGES TO THE STATEMENT OF BASIS/PROPOSED PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE L-3 (NBN), L-AREA RUBBLE PIT (131-1L), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT (U) (SRNS-RP-2025-00724, REVISION 1) AND SAVANNAH RIVER SITE'S RESPONSES TO REGULATORY COMMENTS TO THE REVISION 0 DOCUMENT, SEMS NUMBER: 91BAKER, MATTHEWFULMER, SUSAN B.|RICHARDS, JONCORRESPONDENCE2IRFARF-025146.pdf
02514509/11/2025025500-1602QUARTERLY INSPECTION DATA SHEET FOR THE F AREA INDUSTRIAL LANDFILL (PERMIT # 025500-1602) (THIRD QUARTER 2025)SRNS, SRNSSUPPORTING DOCUMENT3IRFARF-025145.pdf
02514409/25/2025SRNS-OS-2025-00299SCDES COMMENTS ON THE TREATABILITY STUDY DATA REPORT FOR GROUNDWATER INJECTION AND DISCHARGE CANAL NEUTRALIZATION AT THE D-AREA GROUNDWATER OPERABLE UNIT (U) – 2024 DATA AND INFORMATION, SEMS NUMBER: 63 (SRNS-TR-2025-00218, REVISION 0, MAY 2025) RECEIVED MAY 30, 2025FULMER, SUSANBAKER, MATTHEWCORRESPONDENCE3IRFARF-025144.pdf
02514309/22/2025SRNS-OS-2025-00298EPA COMMENTS ON THE 2024 ANNUAL COMPREHENSIVE TNX AREA GROUNDWATER MONITORING AND REMEDIAL ACTION EFFECTIVENESS INTERIM REPORT (U) SEMS NUMBERS: 21, 29, SRNS-RP-2025-00676, REVISION 0, JUNE 2025RICHARDS, JONBAKER, MATTTHEWCORRESPONDENCE4IRFARF-025143.pdf
02514209/22/2025SRNS-OS-2025-00297EPA COMMENTS ON THE 488-4D ASH LANDFILL ANNUAL GROUNDWATER MONITORING REPORT 2024 DATA, SEMS NUMBER: 63 SRNS-RP-2025-00914, REVISION 0, JULY 2025RICHARDS, JONBAKER, MATTHEWCORRESPONDENCE2IRFARF-025142.pdf
02514109/18/2025SRNS-OS-2025-00296SCDES APPROVAL OF THE SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE EFFECTIVENESS MONITORING REPORT (EMR) FOR THE P-AREA GROUNDWATER (PAGW) OPERABLE UNIT (OU) ZERO VALENT IRON PERMEABLE REACTIVE BARRIER (ZVI-PRB) REMOVAL ACTION (U)-APRIL 2023 THROUGH MARCH 2024, SEMS NUMBER: 81 (SRNS-RP-2024-00914, REVISION 0, DECEMBER 2024) RECEIVED AUGUST 22, 2025FULMER, SUSANBAKER, MATTHEWCORRESPONDENCE1IRFARF-025141.pdf
02514009/18/2025SRNS-OS-2025-00295SCDES APPROVAL OF THE CORRECTIVE MEASURES IMPLEMENTATION REPORT (CMIR)/REMEDIAL ACTION COMPLETION REPORT (RACR) FOR M-AREA INACTIVE PROCESS SEWER LINES (081-M) OPERABLE UNIT (OU) (U), SEMS NUMBER: 19 (SRNS-RP-2025-00266, REVISION 0, JUNE 2025) RECEIVED JUNE 23, 2025FULMER, SUSANBAKER, MATTHEWCORRESPONDENCE1IRFARF-025140.pdf
02513909/15/2025SRNS-OS-2025-00294SCDES COMMENTS ON THE PERFORMANCE EVALUATION FOR THE A-AREA BURNING/RUBBLE PITS (731-A, -LA) AND RUBBLE PIT (731-2A) AND THE MISCELLANEOUS CHEMICAL BASIN/METALS BURNING PIT (731-4A, -SA) OPERABLE UNIT-JANUARY THROUGH DECEMBER 2024 (U), SEMS NUMBER: 28 (SRNS-RP-2025-00079, REVISION 0, MAY 2025) RECEIVED MAY 21, 2025FULMER, SUSANBAKER, MATTHEWCORRESPONDENCE2IRFARF-025139.pdf
02513809/12/2025SRNS-OS-2025-00293SCDES CONCURRENCE OF THE REQUEST FOR CONCURRENCE TO CEASE WASTE REMOVAL AND PROCEED TO SAMPLE AND ANALYSIS PHASE OF THE TANK CLOSURE PROCESS FOR TANK 3, SEMS NUMBER: 23, DATED SEPTEMBER 9, 2025, AND RECEIVED ELECTRONICALLY SEPTEMBER 9,2025FULMER, SUSANBAKER, MATTHEWCORRESPONDENCE1IRFARF-025138.pdf
02513709/12/2025SRNS-OS-2025-00292SCDES APPROVAL OF THE DECOMMISSIONING PROJECT FINAL REPORT 236-H, BY­PRODUCT PURIFICATION FACILITY (V-PCOR-H-00016, REVISION 1, JULY 22, 2025) RECEIVED AUGUST 14, 2025OQUINN, GREGORYBAKER, MATTHEWCORRESPONDENCE1IRFARF-025137.pdf
02513609/29/2025RDDD-25-166DOE SUBMITTAL OF THE 5-YEAR MONITORING REPORT (DATA SUMMARY LETTER) FOR THE K-AREA GROUNDWATER OPERABLE UNIT, 2021 THROUGH 2025, SEMS NUMBER: 99BAKER, MATTHEWFULMER, SUSAN|RICHARDS, JONCORRESPONDENCE21IRFARF-025136.pdf
02513509/11/2025SRNS-STI-2025-005582025 PERIODIC REPORT ON THE BIOASSESSMENT OF SAVANNAH RIVER SITE STREAMS (SRNS-STL-2025-00558, JULY 16, 2025) SEMS NUMBERS: 69, 70, 71, 74, 84SRNS, SRNSSUPPORTING DOCUMENT71IRFARF-025135.pdf
02513409/11/2025SRNS-RP-2025-00853SCOPING SUMMARY FOR THE PERIODIC REPORT ON THE BIOASSESSMENT OF SAVANNAH RIVER SITE STREAMS (2025 PERIODIC REPORT ON THE BIOASSESSMENT OF SRS STREAMS SCOPING) (SRNS-RP-2025-00853, JULY 2025 (FINAL)) SEMS NUMBERS: 69, 70, 71, 74,84SRNS, SRNSSUPPORTING DOCUMENT34IRFARF-025134.pdf
02513309/11/2025SRNS-RP-2025-012002025 PERIODIC REPORT ON THE BIOASSESSMENT OF SAVANNAH RIVER SITE STREAMS (SRNS-RP-2025-01200, REVISION 0, SEPTEMBER 2025) SEMS NUMBERS: 69, 70, 71, 74, 84SRNS, SRNSSUPPORTING DOCUMENT104IRFARF-025133.pdf
02513209/11/2025RDDD-25-163DOE SUBMITTAL OF THE 2025 PERIODIC REPORT ON THE BIOASSESSMENT OF SAVANNAH RIVER SITE STREAMS (SRNS-RP-2025-01200, REVISION 0, SEPTEMBER 2025), SCOPING SUMMARY FOR THE PERIODIC REPORT ON THE BIOASSESSMENT OF SAVANNAH RIVER SITE STREAMS (2025 PERIODIC REPORT ON THE BIOASSESSMENT OF SRS STREAMS SCOPING) (SRNS-RP-2025-00853, JULY 2025 (FINAL)), AND 2025 PERIODIC REPORT ON THE BIOASSESSMENT OF SAVANNAH RIVER SITE STREAMS (SRNS-STL-2025-00558, JULY 16, 2025) SEMS NUMBERS: 69, 70, 71, 74, 84BAKER, MATTHEWFULMBER, SUSAN|RICHARDS, JONCORRESPONDENCE2IRFARF-025132.pdf
02513109/10/2025SRNS-OS-2025-00266EPA CONCURRENCE OF THE PRELIMINARY CEASE WASTE REMOVAL DETERMINATION AND REQUEST TO PROCEED TO SAMPLE AND ANALYSIS PHASE FOR HIGH LEVEL WASTE TANK 3, SEMS NUMBER: 23DAWSON, JANABAKER, MATTHEWCORRESPONDENCE1ARFARF-025131.pdf
02513009/10/2025SRNS-RP-2023-00820SCOPING SUMMARY FOR THE AUTOMOTIVE REPAIR SHOP (716-A) OPERABLE UNIT (U) (POST-WORK PLAN CHARACTERIZATION) (SRNS-RP-2023-00820, JUNE 2025 (FINAL)) SEMS NUMBER: 62SRNS, SRNSSUPPORTING DOCUMENT28IRFARF-025130.pdf
02512909/10/2025SRNS-RP-2025-00719REMEDIAL INVESTIGATION REPORT WITH BASELINE RISK ASSESSMENT FOR THE AUTOMOTIVE REPAIR SHOP (716-A) OPERABLE UNIT (U) (SRNS-RP-2025-00719, REVISION 0, SEPTEMBER 2025) SEMS NUMBER: 62SRNS, SRNSRFI/RI REPORT W/BRA403IRFARF-025129.pdf
02512809/10/2025RDDD-25-162DOE SUBMITTAL OF THE REMEDIAL INVESTIGATION REPORT WITH BASELINE RISK ASSESSMENT FOR THE AUTOMOTIVE REPAIR SHOP (716-A) OPERABLE UNIT (U) (SRNS-RP-2025-00719, REVISION 0, SEPTEMBER 2025) AND SCOPING SUMMARY FOR THE AUTOMOTIVE REPAIR SHOP (716-A) OPERABLE UNIT (U) (POST-WORK PLAN CHARACTERIZATION) (SRNS-RP-2023-00820, JUNE 2025 (FINAL)) SEMS NUMBER: 62BAKER, MATTHEWFULMBER, SUSAN|RICHARDS, JONCORRESPONDENCE2IRFARF-025128.pdf
02512709/09/2025SRNS-OS-2025-00263SCDES APPROVAL OF THE ADDENDUM TO THE SITE EVALUATION REPORT FOR THE SPILL ON 2/1/57 OF UNKNOWN OF SEEPAGE BASIN PIPE LEAK FROM 904-44G (NBN) (WSRC-RP-2003-4049, REVISION 0, JUNE 2003) (U), SEMS NUMBER: 61 (SRNS-RP-2023-00689, REVISION 1, JULY 2025) RECEIVED AUGUST 13, 2025FULMER, SUSANBAKER, MATTHEWCORRESPONDENCE1IRFARF-025127.pdf
02512609/04/2025SRMC-CWDA-2025-00075PROPOSAL TO CEASE WASTE REMOVAL ACTIVITIES IN TANK 3 AND ENTER SAMPLING AND ANALYSIS PHASE (SRMC-CWDA-2025-00075, REVISION 1, SEPTEMBER 4, 2025)SRMC, SRMCSUPPORTING DOCUMENT81IRFARF-025126.pdf
02512509/09/2025RDDD-25-161DOE SUBMITTAL OF REQUEST FOR CONCURRENCE TO PROCEED TO SAMPLE AND ANALYSIS PHASE OF THE TANK CLOSURE PROCESS FOR TANK 3 (SEMS NUMBER: 23)BAKER, MATTHEWFULMER, SUSAN|RICHARDS, JONCORRESPONDENCE3IRFARF-025125.pdf
02512409/08/2025SRNS-OS-2025-00255EPA COMMENTS ON THE EFFECTIVENESS MONITORING FOR THE CHEMICALS, METALS, AND PESTICIDES (CMP) PITS OPERABLE UNIT (OU) (U), SEMS NUMBER: 24, SRNS-RP-2025-00708, REVISION 0, JUNE 2025 AND THE GROUNDWATER MODEL UPDATE FOR THE CHEMICALS, METALS, AND PESTICIDES (CMP) PITS OPERABLE UNIT (OU) (U), SEMS NUMBER: 24, SRNS-RP-2024-01410, REVISION 0, JUNE 2025, SAVANNAH RIVER SITE, AIKEN, SOUTH CAROLINARICHARDS, JONBAKER, MATTHEWCORRESPONDENCE6ARFARF-025124.pdf
02512309/04/2025SRNS-OS-2025-00249SCDES APPROVAL OF THE CONTAMINANT MIGRATION MODELING OF LEAD AND HEAVY WATER WITHIN C-REACTOR (105-C) (U), SEMS NUMBER: 79 (SRNS-OS-2023-00213, REVISION 1, AUGUST 2025) RECEIVED AUGUST 8, 2025FULMER, SUSANCORRESPONDENCE1IRFARF-025123.pdf
02512205/29/2025O&M 25-021MINOR OPERATION AND MAINTENANCE ACTIVITY PLAN INSTALLATION OF WSB PARKING LOT ACCESS ROAD SITE EVALUATION AREA 276 (O&M 25-021, DATED 8/6/2025)SRNS, SRNSSUPPORTING DOCUMENT6IRFARF-025122.pdf
02512108/06/2025O&M 25-015MINOR OPERATION AND MAINTENANCE ACTIVITY PLAN INSTALLATION OF BOLLARDS OUTSIDE OF 766-H RCRA/CERCLA UNIT 591 (O&M 25-015, DATED 5/27/2025)SRNS, SRNSSUPPORTING DOCUMENT6IRFARF-025121.pdf
02512008/27/2025SRNS-OS-2025-00246EPA APPROVAL OF THE SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE EFFECTIVENESS MONITORING REPORT (EMR) FOR THE P-AREA GROUNDWATER (PAGW) OPERABLE UNIT (OU) ZERO VALENT IRON PERMEABLE REACTIVE BARRIER (ZVI-PRB) REMOVAL ACTION (U) – APRIL 2023 THROUGH MARCH 2024 (SRNS-RP-2024-00914, REVISION 0, DECEMBER 2024) SEMS NUMBER: 81RICHARDS, JONBAKER, MATTHEWCORRESPONDENCE1ARFARF-025120.pdf
02511908/22/2025SRNS-OS-2025-00241EPA COMMENTS ON THE PERFORMANCE EVALUATION REPORT FOR THE A-AREA BURNING/RUBBLE PITS (731-A, -1A) AND RUBBLE PIT (731-2A) AND THE MISCELLANEOUS CHEMICAL BASIN/METALS BURNING PIT (731-4A, -5A) OPERABLE UNIT, JANUARY THROUGH DECEMBER 2024 (U) SEMS NUMBER: 28 SRNS-RP-2025-00079, REVISION O, MAY 2025RICHARDS, JONBAKER, MATTHEWCORRESPONDENCE3ARFARF-025119.pdf
02511808/21/2025SRNS-RP-2023-01365RESOURCE CONSERVATION AND RECOVERY ACT FACILITY INVESTIGATION/REMEDIAL INVESTIGATION REPORT WITH BASELINE RISK ASSESSMENT AND CORRECTIVE MEASURES STUDY/FEASIBILITY STUDY FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE L-3 (EAST OF L AREA) (NBN), L-AREA RUBBLE PIT (131-1L), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT (U) (SRNS-RP-2023-01365, REVISION 1, JANUARY 2025) (CERTIFIED CLEAN COPY) SEMS NUMBERS: 91SRNS, SRNSRFI/RI REPORT W/BRA AND CMS/FS812IRFARF-025118.pdf
02511708/21/2025RDDD-25-151DOE SUBMITTAL OF THE RESOURCE CONSERVATION AND RECOVERY ACT FACILITY INVESTIGATION/REMEDIAL INVESTIGATION REPORT WITH BASELINE RISK ASSESSMENT AND CORRECTIVE MEASURES STUDY/FEASIBILITY STUDY FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE L-3 (EAST OF L AREA) (NBN), L-AREA RUBBLE PIT (131-1L), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT (U) (SRNS-RP-2023-01365, REVISION 1, JANUARY 2025) (CERTIFIED CLEAN COPY) SEMS NUMBERS: 91BAKER, MATTHEWFULMER, SUSAN|RICHARDS, JONCORRESPONDENCE2IRFARF-025117.pdf
02511608/21/2025RDDD-25-159DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE EFFECTIVENESS MONITORING REPORT (EMR) FOR THE P-AREA GROUNDWATER (PAGW) OPERABLE UNIT (OU) ZERO VALENT IRON PERMEABLE REACTIVE BARRIER (ZVI-PRB) REMOVAL ACTION (U) – APRIL 2023 THROUGH MARCH 2024 (SRNS-RP-2024-00914, REVISION 0, DECEMBER 2024) SEMS NUMBER: 81BAKER, MATTHEWFULMER, SUSAN|RICHARDS, JONSUPPORTING DOCUMENT12IRFARF-025116.pdf
02511503/14/2012O&M 12-009MINOR OPERATION AND MAINTENANCE ACTIVITY PLAN CONCRETE CULVERTS STORAGE PAD, K-AREA RCRA/CERCLA UNIT 476 (O&M 12-009, DATED 03/14/2012)SRNS, SRNSSUPPORTING DOCUMENT6IRFARF-025115.pdf
02511408/18/2025SRNS-OS-2025-00231EPA APPROVAL OF THE DECOMMISSIONING PROJECT FINAL REPORT 235-1F & 235-2F, REFRIGERATION BUILDINGS NOS. 1 & 2 (V-PCOR-F-00096, REVISION 0, JULY 30, 2025)DAWSON, JANABAKER, MATTHEWCORRESPONDENCE1ARFARF-025114.pdf
02511308/18/2025SRNS-OS-2025-00230EPA APPROVAL OF THE DECOMMISSIONING PROJECT FINAL REPORT 607-3F, SANITARY LIFT STATION, V-PCOR-F-00097, REVISION 0, JULY 30, 2005DAWSON, JANABAKER, MATTHEWCORRESPONDENCE1IRFARF-025113.pdf
02511208/18/2025SRNS-OS-2025-00229EPA APPROVAL OF THE DECOMMISSIONING PROJECT FINAL REPORT 236-H, BY-PRODUCT PURIFICATION FACILITY, V-PCOR-H-00016, REVISION 1, JULY 22, 2025DAWSON, JANABAKER, MATTHEWCORRESPONDENCE1ARFARF-025112.pdf
02511101/18/2025SRNS-OS-2025-00228SCDES COMMENTS ON THE D-AREA GROUNDWATER OPERABLE UNIT (OU) ANNUAL DATA SUMMARY REPORT – 2023 DATA (U) (SRNS-RP-2024-01267, REVISION 0, NOVEMBER 2024)CATHCART, HEATHERRICHARDS, JON|FULMER, SUSANCORRESPONDENCE5ARFARF-025111.pdf
02511008/14/2025V-PCOR-F-00098DECOMMISSIONING PROJECT FINAL REPORT 607-3F, SANITARY LIFT STATION (V-PCOR-F-00097, REVISION 0, JULY 30, 2025)SRNS, SRNSDECOMISSION PROJECT FINAL REPORTS13IRFARF-025110.pdf
02510908/14/2025RDDD-25-158DOE SUBMITTAL OF THE DECOMMISSIONING PROJECT FINAL REPORT 607-3F, SANITARY LIFT STATION (V-PCOR-F-00097, REVISION 0, JULY 30, 2025)BAKER, MATTHEWFULMER, SUSAN|RICHARDS, JONCORRESPONDENCE2IRFARF-025109.pdf
02510807/22/2025V-PCOR-H-00016DECOMMISSIONING PROJECT FINAL REPORT 236-H, BY-PRODUCT PURIFICATION FACILITY (V-PCOR-­H-00016, REVISION 1, JULY 22, 2025)SRNS, SRNSDECOMISSION PROJECT FINAL REPORTS159IRFARF-025108.pdf
02510708/14/2025RDDD-25-157DOE SUBMITTAL OF THE DECOMMISSIONING PROJECT FINAL REPORT 236-H, BY-PRODUCT PURIFICATION FACILITY (V-PCOR-H-00016, REVISION 1, JULY 22, 2025) AND SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE REVISION 0 DOCUMENTBAKER, MATTHEWFULMBER, SUSAN|RICHARDS, JONCORRESPONDENCE20IRFARF-025107.pdf
02510607/30/2025V-PCOR-F-00096DECOMMISSIONING PROJECT FINAL REPORT 235-1F & 235-2F, REFRIGERATION BUILDINGS NOS. 1 & 2 (V-PCOR-F-00096, REVISION 0, JULY 30, 2025)SRNS, SRNSDECOMISSION PROJECT FINAL REPORTS13IRFARF-025106.pdf
02510508/14/2025RDDD-25-156DOE SUBMITTAL OF DECOMMISSIONING PROJECT FINAL REPORT 235-1F & 235-2F, REFRIGERATION BUILDINGS NOS. 1 & 2 (V-PCOR-F-00096, REVISION 0, JULY 30, 2025)BAKER, MATTHEWFULMER, SUSAN|RICHARDS, JONCORRESPONDENCE2IRFARF-025105.pdf
02510408/13/2025SRNS-OS-2025-00226EPA APPROVAL OF THE ADDENDUM TO THE SITE EVALUATION REPORT FOR THE SPILL ON 2/1/57 OF UNKNOWN OF SEEPAGE BASIN PIPE LEAK FROM 904-44G (NBN) (WSRC-RP-2003-4049, REVISION 0, JUNE 2003) (U) (SRNS-RP-2023-00689, REVISION 1, JULY 2025) (REDLINE PAGES AND CLEAN COPY) AND SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE REVISION 0 DOCUMENT, OU 61RICHARDS, JONBAKER, MATTHEWCORRESPONDENCE1IRFARF-025104.pdf
02510308/13/2025SRNS-OS-2025-00225EPA APPROVAL OF THE CONTAMINANT MIGRATION MODELING OF LEAD AND HEAVY WATER WITHIN C-REACTOR (105-C) (U) (SRNS-OS-2023-00213, REVISION 1, AUGUST 2025) AND SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE REVISION 0 DOCUMENT, SEMS NUMBER: 79RICHARDS, JONBAKER, MATTHEWCORRESPONDENCE1IRFARF-025103.pdf
02510208/12/2025SRNS-OS-2025-00222EPA APPROVAL OF THE SEVENTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH GROUNDWATER REMEDIES (U), SEMS NUMBER: 00, SRNS-RP-2024-00934, REVISION 1, JUNE 2025) (REDLINE PAGES) SAVANNAH RIVER SITE AIKEN, SOUTH CAROLINARICHARDS, JONBAKER, MATTHEWCORRESPONDENCE1IRFARF-025102.pdf
02510108/11/2025SRNS-RP-2023-00689ADDENDUM TO THE SITE EVALUATION REPORT FOR THE SPILL ON 2/1/57 OF UNKNOWN OF SEEPAGE BASIN PIPE LEAK FROM 904-44G (NBN) (WSRC-RP-2003-4049, REVISION 0, JUNE 2003) (U) (SRNS-RP-2023-00689, REVISION 1, JULY 2025) (CLEAN COPY) SEMS NUMBER: 61SRNS, SRNSSITE EVALUATION48IRFARF-025101.pdf
02510008/11/2025SRNS-RP-2023-00689ADDENDUM TO THE SITE EVALUATION REPORT FOR THE SPILL ON 2/1/57 OF UNKNOWN OF SEEPAGE BASIN PIPE LEAK FROM 904-44G (NBN) (WSRC-RP-2003-4049, REVISION 0, JUNE 2003) (U) (SRNS-RP-2023-00689, REVISION 1, JULY 2025) (REDLINE PAGES) SEMS NUMBER: 61SRNS, SRNSSITE EVALUATION14IRFARF-025100.pdf
02509908/11/2025RDDD-25-154DOE SUBMITTAL OF ADDENDUM TO THE SITE EVALUATION REPORT FOR THE SPILL ON 2/1/57 OF UNKNOWN OF SEEPAGE BASIN PIPE LEAK FROM 904-44G (NBN) (WSRC-RP-2003-4049, REVISION 0, JUNE 2003) (U) (SRNS-RP-2023-00689, REVISION 1, JULY 2025) (REDLINE PAGES AND CLEAN COPY) AND SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE REVISION 0 DOCUMENT, SEMS NUMBER: 61BAKER, MATTHEWFULMER, SUSAN|RICHARDS, JONCORRESPONDENCE10IRFARF-025099.pdf
02509808/06/2025SRNS-OS-2025-00215SCDES CONCURRENCE OF THE FACILITY DECOMMISSIONING EVALUATION {FDE): 720-F CENTRAL ALARM STATION {G-FDE-F-00062, REVISION 2, JUNE 19, 2025), COVER LETTER DATED JULY 2, 2025OQUINN, GREGORYBAKER, MATTHEWCORRESPONDENCE1IRFARF-025098.pdf
02509708/04/2025SRNS-OS-2025-00217SCDES COMMENTS ON THE STATEMENT OF BASIS/PROPOSED PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE L-3 (NBN), L-AREA RUBBLE PIT (131-LL), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT (U), SEMS NUMBER: 91 (SRNS-RP-2025-00724, REVISION 0, JUNE 2025) RECEIVED JUNE 6, 2025CATHCART, HEATHERCORRESPONDENCE2IRFARF-025097.pdf
02509608/07/2025SRNS-OS-2023-00213CONTAMINANT MIGRATION MODELING OF LEAD AND HEAVY WATER WITHIN C-REACTOR (105-C) (U) (SRNS-OS-2023-00213, REVISION 1, AUGUST 2025) SEMS NUMBER: 79SRNS, SRNSSUPPORTING DOCUMENT158IRFARF-025096.pdf
02509508/07/2025RDDD-25-155DOE SUBMITTAL OF THE CONTAMINANT MIGRATION MODELING OF LEAD AND HEAVY WATER WITHIN C-REACTOR (105-C) (U) (SRNS-OS-2023-00213, REVISION 1, AUGUST 2025) AND SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE REVISION 0 DOCUMENT, SEMS NUMBER: 79BAKER, MATTHEWFULMBER, SUSAN|RICHARDS, JONCORRESPONDENCE10IRFARF-025095.pdf
02509408/01/2025SRNS-OS-2025-00216EPA COMMENTS ON THE STATEMENT OF BASIS/PROPOSED PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE L-3 (NBN), L-AREA RUBBLE PIT (131-1L), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT (U) (SRNS-RP-2025-00724, REVISION 0, JUNE 2025), STATEMENT OF BASIS/PROPOSED PLAN FACT SHEET (SRNS-RP-2025-00790, JUNE 2025) SCOPING SUMMARY (SRNS-RP-2021-05232, APRIL, FINAL), AND THE DRAFT PUBLIC NOTICE INFORMATION, SEMS NUMBER: 91RICHARDS, JONBAKER, MATTHEWCORRESPONDENCE7ARFARF-025094.pdf
02509307/30/2025SRNS-OS-2025-00214SCDES APPROVAL OF THE SEVENTH FIVE-YEAR REMEDY REVIEW REPORT FOR THE SAVANNAH RIVER SITE OPERABLE UNITS WITH GROUNDWATER REMEDIES (U) – AIKEN, SOUTH CAROLINA, SEMS NUMBER: 00 (SRNS-RP-2024-00934, REVISION 1, JUNE 2025) (REDLINE PAGES) RECEIVED JUNE 18, 2025FULMER, SUSAN B.BAKER, MATTHEWCORRESPONDENCE1ARFARF-025093.pdf
02509201/07/2025SRNS-OS-2025-00211AFFIDAVITS OF PUBLICATION FROM THE AUGUSTA CHRONICLE, THE PEOPLE SENTINEL, AND THE STATE NEWSPAPERS FOR NOTICE OF PUBLIC AVAILABILITY SEVENTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH NATIVE SOIL COVERS AND/OR LAND USE CONTROLSSRNS, SRNSCOMMUNITY INVOLVEMENT6IRFARF-025092.pdf
02509109/13/2024SRNS-OS-2025-00210AFFIDAVITS OF PUBLICATION FROM THE AUGUSTA CHRONICLE, THE PEOPLE SENTINEL, AND THE STATE NEWSPAPERS FOR U.S. DEPARTMENT OF ENERGY CONDUCTS PHASED SUBMITTALS OF THE SEVENTH FIVE-YEAR REMEDY REVIEW AT SAVANNAH RIVER SITE SECOND PHASE: SAVANNAH RIVER SITE OPERABLE UNITS WITH GROUNDWATER REMEDIESSRNS, SRNSCOMMUNITY INVOLVEMENT5IRFARF-025091.pdf
02509004/04/2024SRNS-OS-2025-00209AFFIDAVITS OF PUBLICATION FROM THE AUGUSTA CHRONICLE, THE PEOPLE SENTINEL, AND THE STATE NEWSPAPERS FOR REMEDIAL DESIGN FACT SHEET AVAILABLE FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) AT THE SAVANNAH RIVER SITESRNS, SRNSCOMMUNITY INVOLVEMENT4IRFARF-025090.pdf
02508912/22/2023SRNS-OS-2025-00208AFFIDAVITS OF PUBLICATION FROM THE AUGUSTA CHRONICLE, AIKEN STANDARD & NORTH AUGUSTA STAR, THE PEOPLE SENTINEL, AND THE STATE NEWSPAPERS FOR NOTICE OF PUBLIC AVAILABILITY FIFTH PHASE: SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH OPERATING EQUIPMENTSRNS, SRNSCOMMUNITY INVOLVEMENT8IRFARF-025089.pdf
02508811/02/2023SRNS-OS-2025-00207AFFIDAVITS OF PUBLICATION FROM THE AIKEN STANDARD & NORTH AUGUSTA STAR AND THE STATE NEWSPAPERS FOR U. S. DEPARTMENT OF ENERGY CONDUCTS PHASED SUBMITTALS OF THE SEVENTH FIVE-YEAR REMEDY REVIEW AT SAVANNAH RIVER SITE FIRST PHASE: SAVANNAH RIVER SITE OPERABLE UNITS WITH NATIVE SOIL COVERS AND/OR LAND USE CONTROLSTSRNS, SRNSCOMMUNITY INVOLVEMENT2IRFARF-025088.pdf
02508710/12/2023SRNS-OS-2025-00206AFFIDAVITS OF PUBLICATION FROM THE AUGUSTA CHRONICLE, AIKEN STANDARD & NORTH AUGUSTA STAR, AND THE PEOPLE SENTINEL NEWSPAPERS FOR NOTICE OF PUBLIC AVAILABILITY EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) FOR INCORPORATING F-AREA DIVERSION BOXES 5 AND 6 INTO THE REVISION 1 INTERIM RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE F-AREA TANK FARM, WASTE TANKS 17 AND 20SRNS, SRNSCOMMUNITY INVOLVEMENT4IRFARF-025087.pdf
02508610/12/2023SRNS-OS-2025-00205AFFIDAVITS OF PUBLICATION FROM THE AUGUSTA CHRONICLE AND AIKEN STANDARD & NORTH AUGUSTA STAR NEWSPAPERS FOR NOTICE OF AVAILABILITY RECORD OF DECISION FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING OPERABLE UNITSRNS, SRNSCOMMUNITY INVOLVEMENT2IRFARF-025086.pdf
02508502/02/2023SRNS-OS-2025-00204AFFIDAVIT OF PUBLICATION FROM THE SAVANNAH MORNING NEWS NEWSPAPER FOR REMEDIAL DESIGN FACT SHEET AVAILABLE FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT UPPER SUBUNIT AT THE SAVANNAH RIVER SITESRNS, SRNSCOMMUNITY INVOLVEMENT2IRFARF-025085.pdf
02508407/14/2025ER-IDS-019-066P-AREA OPERABLE UNIT (PAOU) FIELD INSPECTION CHECKLISTHEISE, BRONSONSUPPORTING DOCUMENT2ARFARF-025084.pdf
02508307/15/2025ER-IDS-019-064R-AREA OPERABLE UNIT (RAOU) FIELD INSPECTION CHECKLISTHEISE, BRONSONSUPPORTING DOCUMENT2ARFARF-025083.pdf
02508207/21/2025ER-IDS-019-055P-AREA EARLY CONSTRUNCTION AND OPERATIONAL DISPOSAL SITE (ECODS) P-2 OPERABLE UNIT FIELD INSPECTION CHECKLISTHEISE, BRONSONSUPPORTING DOCUMENT2ARFARF-025082.pdf
02508107/08/2025ER-IDS-019-037H-AREA INACTIVE PROCESS SEWER FIELD INSPECTION CHECKLISTHEISE, BRONSONSUPPORTING DOCUMENT3ARFARF-025081.pdf
02508007/02/2025ER-IDS-019-021H-AREA HAZARDOUS WASTE MANAGEMENT FACILITY (BLDGS 904-44G, 904-45G AND 904-56G) FIELD INSPECTION CHECKLISTPRICE, DYLANSUPPORTING DOCUMENT4ARFARF-025080.pdf
02507907/02/2025ER-IDS-019-019F-AREA HAZARDOUS WASTE MANAGEMENT FACILITY (BLDGS. 904-41G, 904-42G AND 904-43G) FIELD INSPECTION CHECKLISTHEISE, BRONSONSUPPORTING DOCUMENT3ARFARF-025079.pdf
02507807/21/2025ER-IDS-019-004K-AREA BINGHAM PUMP OUTAGE PIT (BLDG. 643-1G) FIELD INSPECTION CHECKLISTHEISE, BRONSONSUPPORTING DOCUMENT2ARFARF-025078.pdf
02507707/16/2025ER-IDS-019-003D-AREA BURNING/RUBBLE PITS (BLDGS. 431-D AND 431-1D) FIELD INSPECTION CHECKLISTHEISE, BRONSONSUPPORTING DOCUMENT2ARFARF-025077.pdf
02507607/08/2025ER-IDS-019-002F-AREA BURNING/RUBBLE PITS 231-F, 231-1F ADN 231-2F FIELD INSPECTION CHECKLISTHEISE, BRONSONSUPPORTING DOCUMENT2ARFARF-025076.pdf
02507507/02/2025ER-IDS-019-001SILVERTON ROAD WASTE UNIT (BLDG 731-3A) FIELD INSPECTION CHECKLISTHEISE, BRONSONSUPPORTING DOCUMENT2ARFARF-025075.pdf
02507407/28/2025SRNS-RP-2025-00914488-4D ASH LANDFILL ANNUAL GROUNDWATER MONITORING REPORT 2024 DATA (SRNS-RP-2025-00914, REVISION 0, JULY 2025) SEMS NUMBER: 63SRNS, SRNSSUPPORTING DOCUMENT29IRFARF-025074.pdf
02507307/28/2025RDDD-25-153DOE SUBMITTAL OF 488-4D ASH LANDFILL ANNUAL GROUNDWATER MONITORING REPORT 2024 DATA (SRNS-RP-2025-00914, REVISION 0, JULY 2025) SEMS NUMBER: 63BAKER, MATTHEWFULMER, SUSAN|RICHARDS, JONCORRESPONDENCE2IRFARF-025073.pdf
02507207/28/2025RDDD-25-152DOE SUBMITTAL OF THE CALENDAR YEAR 2024 D-AREA OIL SEEPAGE BASIN OPERABLE UNIT (631-G) GROUNDWATER MIXING ZONE LETTER REPORT, SEMS NUMBER: 27BAKER, MATTHEWFULMER, SUSAN|RICHARDS, JONCORRESPONDENCE19IRFARF-025072.pdf
02507107/24/2025SRNS-OS-2025-00201SCDES APPROVAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE EFFECTIVENESS MONITORING REPORT (EMR) FOR THE C-AREA GROUNDWATER (CAGW) OPERABLE UNIT (OU) REMOVAL ACTION (U)-JULY 2023 THROUGH JUNE 2024, SEMS NUMBER: 82 (SRNS-RP-2024-01334, REVISION 0, NOVEMBER 2024) RECEIVED JUNE 27, 2025FULMER, SUSANBAKER, MATTHEWCORRESPONDENCE1IRFARF-025071.pdf
02507010/04/2022SRNS-RP-2025-01134THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR NOTICE OF FLOODPLAIN AND WETLAND ACTION AT THE SAVANNAH RIVER SITE (VOLUME 34, NUMBER 4, OCTOBER 4, 2022)SRNS, SRNSCOMMUNITY INVOLVEMENT2IRFARF-025070.pdf
02506910/03/2022SRNS-J2200-2022-00097FLOODPLAIN AND WETLAND ASSESSMENT FOR THE R-AREA DISCHARGE CANAL CERCLA REMOVAL ACTION ON THE SAVANNAH RIVER SITE (SRNS-J2200-2022-00097, REVISION 0, SEPTEMBER 2022)SRNS, SRNSSUPPORTING DOCUMENT18IRFARF-025069.pdf
02506803/30/2020SRNS-RP-2025-01123THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR NOTICE OF FLOODPLAIN AND WETLAND ACTION AT THE SAVANNAH RIVER SITE (VOLUME 32, NUMBER 4, MARCH 30, 2020)SRNS, SRNSCOMMUNITY INVOLVEMENT2IRFARF-025068.pdf
02506702/19/2020SRNS-RP-2025-01122THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR FLOODPLAIN AND WETLAND ASSESSMENT OF THE EFFECTS OF HERBICIDE APPLICATION TO DOE-SR 115-KV ELECTRICITY TRANSMISSION LINE RIGHTS-OF-WAY ON THE SAVANNAH RIVER SITE (VOLUME 32, NUMBER 2, FEBRUARY 18, 2020)SRNS, SRNSCOMMUNITY INVOLVEMENT2IRFARF-025067.pdf
02506601/02/2020SRNS-J2000-2019-00159FLOODPLAIN AND WETLAND ASSESSMENT OF THE EFFECTS OF PROPOSED HERBICIDE APPLICATION AT ENVIRONMENTAL SAMPLING LOCATIONS ON THE SAVANNAH RIVER SITE (SRNS-J2000-2019-00159, REVISION 0, JANUARY 2020)SRNS, SRNSSUPPORTING DOCUMENT12IRFARF-025066.pdf
02506503/02/2020SRNS-J2000-2019-00100FLOODPLAIN AND WETLAND ASSESSMENT OF THE EFFECTS OF HERBICIDE APPLICATION TO DOE-SR 115-KV ELECTRICITY TRANSMISSION LINE RIGHTS-OF-WAY ON THE SAVANNAH RIVER SITE (SRNS-J2000-2019-00100, REVISION 0, MARCH 2020)SRNS, SRNSSUPPORTING DOCUMENT13IRFARF-025065.pdf
02506407/21/2025SRNS-OS-2025-00192EPA APPROVAL: SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE EFFECTIVENESS MONITORING REPORT (EMR) FOR THE C-AREA GROUNDWATER (CAGW) OPERABLE UNIT (OU) REMOVAL ACTION (U) – JULY 2023 THROUGH JUNE 2024 (SRNS-RP-2024-01334, REVISION 0, NOVEMBER 2024) SEMS NUMBER: 82RICHARDS, JONBAKER, MATTHEWCORRESPONDENCE1ARFARF-025064.pdf
02506307/17/2025SRNS-J2000-2025-00478SRNS SUBMITTAL OF THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE (ECODS) N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (CSSLP) (631-2G), AND BULDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (OU) POST- REMEDIAL ACTION REGULATORY FIELD VISITJONES, CALEBRICHARDS, JON|CATHCART, HEATHERCORRESPONDENCE1ARFARF-025063.pdf
02506207/15/2025SRNS-OS-2025-00186SCDES COMMENTS ON THE GROUNDWATER REPORT FOR THE P-AREA GROUNDWATER (PAGW) OPERABLE UNIT (OU) (U)-APRIL 2023 THROUGH MARCH 2024 DATA, SEMS NUMBER: 81 (SRNS-RP-2024-01436, REVISION 0, FEBRUARY 2025) RECEIVED MARCH 19, 2025FULMER, SUSANBAKER, MATTHEWCORRESPONDENCE3IRFARF-025062.pdf