Administrative Record File/Information Repository File (ARF/IRF)

Jump To:

Index of documents (PDF) contained in the ARF/IRF, which are available at the University of South Carolina Libraries – Aiken and Columbia on CD. This index is in PDF (portable document format) which requires Adobe Acrobat Reader software to be installed on your computer.

In 2020, SRS began posting PDFs of the ARF/IRF records on the SRS external website. In addition, this external website contains an Index of Documents (see link above). The index is currently dated 1/8/2026 and lists entries numbered from 000001 to 025261. The PDFs that are currently posted on the list below are dated from 10/1/2017 to 1/8/2026. The Index of Documents and PDFs will be updated quarterly. Historical PDFs will be added at a later date.

Disclaimer: The scanning process used to transfer documents into the portable document format may unintentionally create minor inaccuracies in the text. The viewer is warned that minor spelling errors may occur and numerical data may be missing decimal points or exponential values. Should the viewer have any questions regarding a particular section of text, an accurate hardcopy is always available from the Area Completion Project Document Control at the Savannah River Site, Luchelle Abney at (803) 952-7401.

Introduction

The Administrative Record File contains the documents and information considered or relied on in the selection of a response action and in controlling hazardous waste management activities. At the Savannah River Site, the Administrative Record File will fulfill the requirements of Section XXXIV, Administrative Record, of the Federal Facility Agreement (FFA).

An Administrative Record File for an individual waste unit is initiated upon the approval by the EPA-IV and the SCDHEC of an RFI/RI Work Plan. The File is compiled until the decision of the response action is chosen (the signing of the Record of Decision). At that time the Administrative Record File is finalized and is called the Administrative Record for that waste unit.

An Administrative Record serves two primary purposes. First, it is a vehicle for public participation in the selection of the response action. Section 113(k)(2) of CERCLA provides the public with an opportunity to participate in a response decision. The Administrative Record makes available the information considered or relied on in the selection and provides the opportunity for public involvement. Without opportunity for this involvement of interested persons, the limitation of court review solely to the Administrative Record can be challenged. Therefore, the Administrative Record will also record the public participation in the decision process and reflect the views of members of the public.

The second purpose of the Administrative Record is concerned with the presentation of evidence in the event of litigation. Judicial review of any issue concerning the adequacy of a response selection is limited to the Administrative Record. Under section 113(j)(2) of CERCLA, the trial court reviewing the selected response decision is limited the facts as set out in the Administrative Record. The Courts will not allow the use of discovery, hearings or additional fact findings unless the Administrative Record is found to be incomplete or poorly prepared. Provided the Administrative Record is adequate, the court will limit its review of the response decision made to the standard of arbitrary and capricious or otherwise not in accordance with the law. The Administrative Record should therefore chronicle the response decision process, whereby a judge could easily follow how and why a decision was made.

An Information Repository File contains information and documents that do not meet the definition of Administrative Record Files but that contain site and unit information, documents on site and unit activities, and general information.

Each entry in the Administrative Record File Index contains the following information:

  • ARF/IRF Catalog Number – A unique number assigned to each document or piece of information. For those documents that are microfilmed, the number is stamped on the top of the document to aid in locating the document on the microfilm.
  • Date –The date the document or information was issued.
  • Document Number – Many of the documents published or produced by the SCDHEC, EPA and SRS are assigned unique numbers. If no document number has been assigned, it is so indicated by the entry of a unique sequence number known as the catalog number. This number is for electronic tracking only.
  • Title –The title of the document, or a brief description of the contents.
  • Author – The person or party responsible for the issuance or writing of the document or information
  • Author Affiliation – The organization that the author works for or is affiliated with.
  • Addressee – In most cases this entry will be blank except if the document is correspondence. The entry, in that case, will be the individual(s) to whom the correspondence was addressed.
  • Addressee Affiliation – In most cases this entry will be blank except if the document is correspondence. The entry in that case will be the organization(s) to which the Addressee is affiliated.
  • Appx. No. of Pages – The approximate number of pages the document contains.
  • Document Type – Each document is categorized according to one of the following types of information:
    • Community Involvement/Relations
    • Correspondence
    • Draft RFI/RI Work Plan
    • Federal Facility Agreement
    • Final RFI/RI Work Plan
    • Guidance
    • Interim Action Proposed Plan
    • Meeting Minutes
    • Proposed Plan
    • Risk Assessment Document
    • Site Evaluation Report
    • Supporting Document
  • Classification – The entry will contain one of the three following codes:
    • U – The information is unclassified and available to the general public for viewing.
    • CP – The information or document is considered confidential or privileged. The document may contain sensitive information and is not available to the general public. It may be included in an Administrative Record File as it was used to support the decision making, but cannot be made publicly available.

PDF Downloads

3870 records available.

CATALOG NUMBERDATE ↑DOCUMENT NUMBERTITLEAUTHORADDRESSEEDOC TYPEAPPX # OF PAGESFILE TYPEPDF FILE
02429708/14/2023ER-IDS-019-010A-AREA BURNING/RUBBLE PITS (731-A AND 731-1A) AND RUBBLE PIT (731-2A) FIELD INSPECTION CHECKLISTJ.H. THOMASSUPPORTING DOCUMENT4IRFARF-024297.pdf
02429708/14/2023ER-IDS-019-010A-AREA BURNING/RUBBLE PITS (731-A AND 731-1A) AND RUBBLE PIT (731-2A) FIELD INSPECTION CHECKLISTJ.H. THOMASSUPPORTING DOCUMENT4IRFARF-024297.pdf
02429808/17/2023ER-IDS-019-005L-AREA BINGHAM PUMP OUTAGE PITS (BLDGS, 643-2G AND 643-3G) FIELD INSPECTION CHECKLISTD.A. SAHMSUPPORTING DOCUMENT3IRFARF-024298.pdf
02430408/17/2023ER-IDS-019-006P-AREA BINGHAM PUMP OUTAGE PIT (643-4G) FIELD INSPECTION CHECKLISTD. SAHMSUPPORTING DOCUMENT3IRFARF-024304.pdf
02427808/21/2023RDDD-23-024DOE SUBMITAL OF SAVANNAH RIVER SITE?S RESPONSES TO THE REGULATORY COMMENTS ON THE TREATABILITY STUDY DATA REPORT FOR GROUNDWATER INJECTION AND DISCHARGE CANAL NEUTRALIZATION AT THE D-AREA GROUNDWATER OPERABLE UNIT(OU) 2022 DATA AND INFORMATION(U) (SRNS-TR-2023-00009. REVESION 0. JANUARY 2023) SEMS NUMVBER:63B. HENNESSEYS.FULMERCORRESPONDENCE7IRFARF-024278.pdf
02427908/21/2023WDPD-23-41DOE SUBMITAL LETTER OF U. S. DEPARTMENT OF ENERGY SIGNED EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) FOR INCORPORATING F-AREA DIVERSION BOXES 5 AND 6 INTO THE REVISION 1 INTERIM RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE F-AREA TANK FARM, WASTE TANKS 17 AND 20 (U) (SRMC-CWDA-2023-00006, REVISION 1, JUNE 2023) SEMS NUMBER: 23B. HENNESSEYS. FULMERCORRESPONDENCE2IRFARF-024279.pdf
02428008/21/2023SRMC-CWDA-2023-0006US DEPARTMENT OF ENERGY SIGNED EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) FOR INCORPORATING F-AREA DIVERSION BOXES 5 AND 6 INTO THE REVISION 1 INTERIM RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE F-AREA TANK FARM, WASTE TANKS 17 AND 20 (U) (SRMC-CWDA-2023-00006 REVISION 1 JUNE 2023) SEMS NUMBER: 23SRMCRECORD OF DECISION20IRFARF-024280.pdf
02428108/21/2023RDDD-23-025DOE SUBMITTAL OF THREE PARTY SIGNED EXPLANATION OF SIGNIFICANT DIFFERENCE FOR THE REVISION 1 RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE WETLAND AREA AT DUNBARTON BAY IN SUPPORT OF STEEL CREEK INTEGRATOR OPERABLE UNIT (U) (SRNS-RP-2022-00982, REVISION 1, APRIL 2023) SEMS NUMBER: 71B. HENNESSEYJ. RICHARDSCORRESPONDENCE2IRFARF-024281.pdf
02427808/21/2023RDDD-23-024DOE SUBMITAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE TREATABILITY STUDY DATA REPORT FOR GROUNDWATER INJECTION AND DISCHARGE CANAL NEUTRALIZATION AT THE D-AREA GROUNDWATER OPERABLE UNIT(OU) 2022 DATA AND INFORMATION (U) (SRNS-TR-2023-00009, REVESION 0, JANUARY 2023) SEMS NUMBER:63B. HENNESSEYS.FULMERCORRESPONDENCE7IRFARF-024278.pdf
02428308/23/2023RDDD-23-022DOE SUBMITTAL LETTER OF 2022 ANNUAL COMPREHENSIVE TNX AREA GROUNDWATER MONITORING AND REMEDIAL ACTION EFFECTIVENESS INTERIM REPORT (U) (SRNS-RP-2023-00875, REVISION 0, AUGUST 2023) SEMS NUMBERS: 21, 29B. HENNESSEYS. FULMERCORRESPONDENCE2IRFARF-024283.pdf
02430008/23/2023ER-IDS-019-008OLD F-AREA SEEPAGE BASIN (BLDG, 904-49G) FIELD INSPECTION CHECKLISTJ.H. THOMASSUPPORTING DOCUMENT4IRFARF-024300.pdf
02440308/23/2023PC-2023-00062COMPLETED POST CLOSURE MAINTENANCE REGISTER FOR ER-IDS-019-008 (DATED 8/23/2023) OLD F-AREA SEEPAGE BASIN (904-49G)CHARLES CARTERSUPPORTING DOCUMENT1IRFARF-024403.pdf
02428508/24/2023RDDD-23-027DOE SUBMITAL OF REQUEST FOR APPROVAL OF THE OPERABLE UNIT STRATEGY CHANGE FOR THE SANDBLAST AREA CMH-002 (NBN) AND THE SPILL ON 02/01/57 OF UNKNOWN OF SEEPAGE BASIN PIPE LEAK FROM 904-44G (NBN), SEMS NUMBER: 61B. HENNESSEYS. FULMERCORRESPONDENCE3IRFARF-024285.pdf
02428608/24/2023SRNS-OS-2023-00223SCDHEC APPROVAL OF THE SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH OPERATING EQUIPMENT (U) – AIKEN, SOUTH CAROLINA (SRNS-RP-2022-00468, REDLINE REVISION 1, JUNE 2023) RECEIVED JULY 13, 2023S.B. FULMERB.HENNESSEYCORRESPONDENCE1IRFARF-024286.pdf
02428708/24/2023SRNS-OS-2023-00224EPA APPROVAL OF THE RESPONSES TO OUR COMMENTS AND THE R1 REDLINE FOR THE SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH OPERATING EQUIPMENT (U), REVISION 1 REDLINE, JUNE 2023 (SRNS-RP-2022-00468), SEMS NUMBER:00J.RICHARDSB.HENNESSEYCORRESPONDENCE1IRFARF-024287.pdf
02428808/25/2023SRNS-OS-2023-00225EPA COMMENTS ON THE TECHNICAL REVIEW OF THE PERFORMANCE EVALUATION REPORT FOR THE A-AREA BURNING RUBBLE PITS (731-A,-1A) AND THE MISCELLANEOUS CHEMICAL BASIN/METALS BURNING PIT (731-4A,-5A) OPERABLE UNIT-JANUARY THROUGH DECEMBER 2022 (U) SEMS NUMBER: 28, SRNS-RP-2023-00127, REVISION 0, DATED MAY 2023J.RICHARDSB.HENNESSEYSUPPORTING DOCUMENT3IRFARF-024288.pdf
02429408/28/2023ER-IDS-019-018MIXED WASTE MANAGEMENT FACILITY POST CLOSURE INSPECTION, BLDG. 643-28E AND LOW-LEVEL RADIOACTIVE WASTE DISPOSAL FACILITY FIELD INSPECTION CHECKLISTD. BARRONSUPPORTING DOCUMENT5IRFARF-024294.pdf
02428908/29/2023SRNS-OS-2023-00226SCDHEC APPROVAL OF THE PERFORMANCE EVALUATION REPORT FOR THE A-AREA BURNING/ RUBBLE PITS (731-A, -lA) AND RUBBLE PIT (731-2A) AND THE MISCELLANEOUS CHEMICAL BASIN/ METALS BURNING PIT (731-4A, -SA) OPERABLE UNIT – JANUARY THROUGH DECEMBER 2022 (U), SEMS NUMBER: 28 (SRNS-RP-2023-00127, REVISION 0, MAY 2023) RECEIVED MAY 2. 2023S.B.FULMERB.HENNESSEYCORRESPONDENCE1IRFARF-024289.pdf
02429008/30/2023RDDD-23-026DOE SUBMITAL OF R-AREA GROUNDWATER (NBN) BIENNIAL EFFECTIVENESS MONITORING REPORT IN SUPPORT OF R-AREA OPERABLE UNIT (U) JANUARY 2021 THROUGH DECEMBER 2022 (SRNS-RP-2023-00758, REVISION 0, AUGUST 2023) SEMS NUMBER: 95B. HENNESSEYS. FULMERCORRESPONDENCE2IRFARF-024290.pdf
02429108/30/2023SRNS-RP-2023-00758R-AREA GROUNDWATER (NBN) BIENNIAL EFFECTIVENESS MONITORING REPORT IN SUPPORT OF R-AREA OPERABLE UNIT (U) JANUARY 2021 THROUGH DECEMBER 2022 (SRNS-RP-2023-00758, REVISION 0, AUGUST 2023) SEMS NUMBER: 95SRNSSUPPORTING DOCUMENT166IRFARF-024291.pdf
02429508/31/2023SRNS-OS-2023-00227SCDHEC APPROVAL OF THE REQUEST FOR APPROVAL OF THE OPERABLE UNIT STRATEGY CHANGE FOR THE SANDBLAST AREA CMH-002 (NBN) AND THE SPILL ON 02/01/57 OF UNKNOWN OF SEEPAGE BASIN PIPE LEAK FROM 904-44G (NBN), SEMS NUMBER: 61, DATED AUGUST 24, 2023 AND RECEIVED AUGUST 25, 2023S. FULMERB. HENNESSEYCORRESPONDENCE1IRFARF-024295.pdf
02431808/31/2023SRNS-RP-2022-00084SCOPING SUMMARY FOR THE 236-H BY-PRODUCT PURIFICATION FACILITY (U) (PRE-DECOMMISSIONING CHARACTERIZATION SCOPING) (SRNS-RP-2022-00084, AUGUST 2023 FINAL))SRNSDECOMMISSION PROJECT FINAL REPORTS134ARFARF-024318.pdf
02429209/06/2023RDDD-23-023DOE SUBMITAL OF U. S. DEPARTMENT OF ENERGY-SIGNED RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2022-01284, REVISION 1, JUNE 2023) SEMS NUMBER: 93B. HENNESSEYS.FULMERCORRESPONDENCE2IRFARF-024292.pdf
02429309/06/2023SRNS-RP-2022-01284U. S. DEPARTMENT OF ENERGY SIGNED RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2022-01284, REVISION 1, JUNE 2023).SRNSRECORD OF DECISION114IRFARF-024293.pdf
02429909/06/2023SRNS-OS-2023-00228EPA APPROVAL OF THE REQUEST FOR APPROVAL OF THE OPERABLE UNIT STRATEGY CHANGE FOR THE SANDBLAST AREA CMH-002 (NBN) AND THE SPILL ON 02/01/57 OF UNKNOWN OF SEEPAGE BASIN PIPE LEAK FROM 904-44G (NBN), SEMS NUMBER: 61J. RICHARDSB. HENNESSEYCORRESPONDENCE1IRFARF-024299.pdf
02455209/06/2023ER-IDS-019-079F-AREA INACTIVE PROCESS SEWER LINE (FIPSL) FIELD INSPECTION CHECKLISTDouqlas E. BarronSUPPORTING DOCUMENT2ARFARF-024552.pdf
02436109/07/2023ER-IDS-019-007ENVIROMENTAL COMPLIANCE & AREA COMPLETION PROJECTS (EC&ACP) STANDARD OPERATING PROCEDURES, VOLUME. I: L-AREA OIL AND CHEMICAL BASIN (BLDG. 904-83G) FIELD INSPECTION CHECKLISTD. BARRONSUPPORTING DOCUMENT4IRFARF-024361.pdf
02430709/11/2023025500-1602QUARTERLY INSPECTION DATA SHEET FOR THE F-AREA INDUSTRIAL LANDFILL (PERMIT #025500-1602) (THIRD QUARTER 2023)C. BISHOPSUPPORTING DOCUMENT3IRFARF-024307.pdf
02430509/12/2023RDDD-23-028DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE GROUNDWATER REPORT FOR THE P-AREA GROUNDWATER (PAGW) OPERABLE UNIT (OU) (U) APRIL 2021 THROUGH MARCH 2022 DATA (SRNS-RP-2022-00963, REVISION 0, JANUARY 2023) SEMS NUMBER: 81B. HENNESSEYJ. RICHADSCORRESPONDENCE16IRFARF-024305.pdf
02430609/12/2023SRNS-OS-2023-00233EPA APPROVAL OF THE RESPONSES TO COMMENTS ON THE GROUNDWATER REPORT FOR P-AREA GROUNDWATER (PAGW) OPERABLE UNIT (OU) (U) APRIL 2021 THROUGH MARCH 2022 [SRNS-RP-2022-00963] DATED SEPT 12, 2023J. RICHARDSB. HENNESSEYCORRESPONDENCE1IRFARF-024306.pdf
02431009/12/2023SRNS-J2000-2023-00598READING ROOM: RCRA PERMIT RENEWAL APPLICATION: GENERAL INFORMATION (SRNS-IM-2022-00158, VOLUME I, REVISION 0, AUGUST 2023), MIXED WASTE MANAGEMENT FACILITY POSTCLOSURE (SRNS-IM-2022-00158, VOLUME VII, REVISION 0, AUGUST 2023) (BOOKS 1 THROUGH 3), MIXED WASTE STORAGE BUILDINGS (SRNS-IM-2022-00158, VOLUME VIII, REVISION 0, AUGUST 2023), SANITARY LANDFILL POSTCLOSURE (SRNS-IM-2022-00158, VOLUME XXIII, REVISION 0, AUGUST 2023) AND PLATES AND DRAWINGS FOR THE SANITARY LANDFILL (WSRC-RP-99-4055, REVISION 4, AUGUST 2023)D. MCDANIELCORRESPONDENCE9IRFARF-024310.pdf
02435509/13/2023ER-IDS-019-069ENVIROMENTAL COMPLIANCE & AREA COMPLETION PROJECTS (EC&ACP) STANDARD OPERATING PROCEDURES, VOLUME. I: D-AREA ASBESTOS PIT (80-20G) FIELD INSPECTION CHECKLISTJ.H. THOMASSUPPORTING DOCUMENT4IRFARF-024355.pdf
02436209/15/2023ER-IDS-019-067ENVIROMENTAL COMPLIANCE & AREA COMPLETION PROJECTS (EC&ACP) STANDARD OPERATING PROCEDURES, VOLUME. I: D-AREA COAL PILE RUNOFF BASIN (489-D NORTH) FIELD INSPECTION CHECKLISTJ.H. THOMASSUPPORTING DOCUMENT4IRFARF-024362.pdf
02440009/15/2023PC-2023-00070COMPLETED POST CLOSURE MAINTENANCE REGISTER FOR ER-IDS-019-032 {DATED 9/15/2023 2 T-AREA OPERABLE UNIT (TAOU)CHARLES CARTERSUPPORTING DOCUMENT1IRFARF-024400.pdf
02456109/15/2023ER-IDS-019-032T-AREA OPERABLE UNIT (TAOU) FIELD INSPECTION CHECKLISTCHARLES CARTERSUPPORTING DOCUMENT5IRF024561.pdf
02430809/18/2023SRNS-OS-2023-00236SCDHEC SUBMITTAL OF THE FOR SIGNATURE APPROVAL OF THE EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) FOR INCORPORATING F-AREA DIVERSION BOXES 5 AND 6 INTO THE REVISION 1 INTERIM RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE F-AREA TANK FARM, WASTE TANKS 17 AND 20 (U) (SRMC-CWDA-2023-00006 REVISION 1 JUNE 2023) SEMS NUMBER: 23S. FULMERJ. RICHARDSCORRESPONDENCE1IRFARF-024308.pdf
02431109/19/2023SRNS-OS-2023-00237SCDHEC APPROVAL OF THE SAVANNAH RIVER SITE'S RESPONSES TO REGULATORY COMMENTS ON THE TREATABILITY STUDY DATA REPORT FOR GROUNDWATER INJECTION AND DISCHARGE CANAL NEUTRALIZATION AT THE D-AREA GROUNDWATER OPERABLE UNIT (OU) 2022 DATA AND INFORMATION (U), SEMS NUMBER: 63 (SRNS-TR-2023-00009, REVISION 0, JANUARY 2023) RECEIVED AUGUST 21, 2023S. FULMERB.HENNESSEYCORRESPONDENCE1IRFARF-024311.pdf
02431209/19/2023WSRC-OS-94-42SAVANNAH RIVER SITE FEDERAL FACILITY AGREEMENT CHANGES DATED 09/19/2023: REVISION 1 APPENDIX E, LONG-TERM PROJECTIONS FOR FISCAL YEAR 2023 (PRINT DATE: 01/09/2023, UPDATED 09/19/2023) AND RECORD OF MODIFICATIONS TO THE FEDERAL FACILITY AGREEMENT FOR THE SAVANNAH RIVER SITE PAGE 37SRNSFEDERAL FACILITY AGREEMENT36IRFARF-024312.pdf
02435909/20/2023ER-IDS-019-060ENVIROMENTAL COMPLIANCE & AREA COMPLETION PROJECTS (EC&ACP) STANDARD OPERATING PROCEDURES, VOLUME. I: EARLY ACTION LAND USE CONTROL IMPLEMENTATION PLAN AT C-AREA REACTOR BUILDING COMPLEX FIELD INSPECTION CHECKLISTC.P. CARTERSUPPORTING DOCUMENT2IRFARF-024359.pdf
02436009/20/2023ER-IDS-019-059ENVIROMENTAL COMPLIANCE & AREA COMPLETION PROJECTS (EC&ACP) STANDARD OPERATING PROCEDURES, VOLUME. I: EARLY ACTION LAND USE CONTROL IMPLEMENTATION PLAN AT L-AREA REACTOR BUILDING COMPLEX FIELD INSPECTION CHECKLISTC.P. CARTERSUPPORTING DOCUMENT3IRFARF-024360.pdf
02437509/20/2023ER-IDS-019-058ENVIROMENTAL COMPLIANCE & AREA COMPLETION PROJECTS (EC&ACP) STANDARD OPERATING PROCEDURES, VOL. I: EARLY ACTION LAND USE CONTROL IMPLEMENTATION PLAN AT K-AREA REACTOR BUILDING COMPLEX FIELD INSPECTION CHECKLISTC.P. CARTERSUPPORTING DOCUMENT3IRFARF-024375.pdf
02455309/20/2023ER-IDS-019-050M-AREA INACTIVE PROCESS SEWER LINE (MIPSL) OPERABLE UNIT 081-M FIELD INSPECTION CHECKLISTJohn H. ThomasSUPPORTING DOCUMENT4ARFARF-024553.pdf
02431309/21/2023SRNS-OS-2023-00251SCDHEC SUBMITTAL OF THE FOR SIGNATURE RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (SRNS-RP-2022-01284, REVISION 1, JUNE 2023)S. FULMERJ. RICHARDSCORRESPONDENCE1IRFARF-024313.pdf
02431509/25/2023SRNS-RP-2022-01284THREE PARTY SIGNED RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2022-01284, REVISION 1, JUNE 2023) SEMS NUMBER: 93SRNSRECORD OF DECISION114IRFARF-024315.pdf
02431609/26/2023RDDD-23-030DOE SUBMITTAL OF THE FISCAL YEAR 2023 BUDGET ALLOTMENT FOR ENVIROMENTAL COMPLIANCE AND AREA COMPLETION PROJECTS AND FEDERAL FACILITY AGREEMENT REVISION :0 APPENDIX D FOR FY2023 (PRINT DATE 09-19-2023B.T. HENNESSEYS.B. FULMERSUPPORTING DOCUMENT7IRFARF-024316.pdf
02431709/26/2023RDDD-23-031DOE SUBMITTAL SCOPING SUMMARY FOR THE 236-H BY-PRODUCT PURIFICATION FACILITY (U) (PRE-DECOMMISSIONING CHARACTERIZATION SCOPING) (SRNS-RP-2022-00084, AUGUST 2023 (FINAL))B. HENNESSEYJ. RICHARDSCORRESPONDENCE2IRFARF-024317.pdf
02431909/26/2023SRMC-CWDA-2023-00006THREE PARTY SIGNED EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) FOR INCORPORATING F-AREA DIVERSION BOXES 5 AND 6 INTO THE REVISION 1 INTERIM RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE F-AREA TANK FARM, WASTE TANKS 17 AND 20 (U) (SRMC-CWDA-2023-00006, REV 1 JUNE 2023) SEMS NUMBER 23SRNSRECORD OF DECISION20IRFARF-024319.pdf
02432409/27/2023V-PCOR-H-00015DECOMMISSIONING PROJECT FINAL REPORT FOR 233-22H, ADMINISTRATION BUILDING (V-PCOR-H-00015, REV. 0, SEPTEMBER 27, 2023)SRNSDECOMMISSION PROJECT FINAL REPORTS13IRFARF-024324.pdf
02454809/27/2023ER-IDS-019-048R-REACTOR SEEPAGE BASINS 904-57G, 904-58G, 904-59G, 904-60G, 904-103G AND 904-104G FIELD INSPECTION CHECKLISTCHARLIE CARTERSUPPORTING DOCUMENT4ARFARF-024548.pdf
02432009/28/2023RDDD-23-034DOE SUBMITTAL OF THE FEDERAL FACILITY AGREEMENT REVISION 0 APPENDIX H SOLID WASTE MANAGEMENT UNITS FOR FISCAL YEAR 2024 (PRINT DATE: 09/25/2023)B HENNESSEYS FULMER J. RICHARDSCORRESPONDENCE35IRFARF-024320.pdf
02432109/28/2023RDDD-23-033DOE Submittal of the Federal Facility Agreement Revision 0 Appendix C RCRA/CERCLA Units, Revision 0 Appendix G Site Evaluation Areas, and Revision 0 Appendix K D&D Facilities for Fiscal Year 2024 (Print Date: 09/25/2023)B.HENNESSEYS.FULMERSUPPORTING DOCUMENT138IRFARF-024321.pdf
02432209/29/2023SRNS-OS-2023-00254EPA APPROVAL OF THE SAVANNAH RIVER SITE'S RESPONSES TO EPA COMMENTS ON THE TREATABILITY STUDY DATA REPORT FOR GROUNDWATER INJECTION AND DISCHARGE CANAL NEUTRALIZATION AT THE D-AREA GROUNDWATER OPERABLE UNIT, 2022 DATA AND INFORMATION, SEMS NUMBER:63 (SRNS-TR-2023-00009, REVISION 0, JANUARY 2023)D.LLOYDB.HENNESSEYCORRESPONDENCE1IRFARF-024322.pdf
02432310/05/2023RDDD-24-101DOE SUBMITTAL OF THE DECOMMISSIONING PROJECT FINAL REPORT FOR 233-22H, ADMINISTRATION BUILDING (V-PCOR-H-00015, REV. 0, SEPTEMBER 27, 2023)B. HENNESSEYS. FULMER J. RICHARDSCORRESPONDENCE2IRFARF-024323.pdf
02432510/06/2023SRNS-OS-2023-00271SCDHEC APPROVAL OF THE SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE GROUNDWATER REPORT FOR THE P-AREA GROUNDWATER (PAGW) OPERABLE UNIT (OU) (U), APRIL 2021 THROUGH MARCH 2022 DATA, SEMS NUMBER: 81 (SRNS-RP-2022-00963 REVISION 0, JANUARY 2023) RECEIVED SEPTEMBER 14, 2023S. FULMERB. HENNESSEYCORRESPONDENCE1IRFARF-024325.pdf
02432610/09/2023SRNS-OS-2023-00272SCDHEC APPROVAL OF THE FISCAL YEAR (FY) 2023 BUDGET ALLOTMENT FOR ENVIRONMENTAL COMPLIANCE AND AREA COMPLETION PROJECTS AND FEDERAL FACILITY AGREEMENT REVISION 0 APPENDIX D FOR FY2023 (PRINT DATE 09/19/23) RECEIVED SEPTEMBER 28, 2023FULMERHENNESSEYCORRESPONDENCE1IRFARF-024326.pdf
02436610/09/2023ER-IDS-019-037H-AREA INACTIVE PROCESS SEWER FIELD INSPECTION CHECKLISTDOUGLAS BARRONSUPPORTING DOCUMENT4IRFARF-024366.pdf
02432710/10/2023SRNS-J2000-2023-0689READING ROOM: RECORD OF DECISION FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING)L. ABNEYCORRESPONDENCE142IRFARF-024327.pdf
02435010/10/2023ER-IDS-019-021H-AREA HAZARDOUS WASTE MANAGEMENT FACILITY (BLDGS.904-44G, 904-45G, 904-46G AND 904-56G) FIELD INSPECTION CHECKLISTD.E. BARONSUPPORTING DOCUMENT6IRFARF-024350.pdf
02432810/12/2023SRNS-OS-2023-00276SCDHEC COMMENTS ON THE EFFECTIVENESS MONITORING REPORT FOR THE MONITORED NATURAL ATTENUATION (MNA) AT THE CHEMICALS, METALS, AND PESTICIDES (CMP) PITS OPERABLE UNIT (OU) (U) – APRIL 2022 THROUGH MARCH 2023, SEMS NUMBER:24 (SRNS-RP-2023-00474, REVISION 0, JUNE 2023) RECEIVED JUNE 16, 2023S.B. FULMERB.HENNESSEYSUPPORTING DOCUMENT2IRFARF-024328.pdf
02432910/12/2023SRNS-OS-2023-00279SCDHEC COMMENTS ON THE BIENNIAL EFFECTIVENESS MONITORING REPORT (EMR) FOR MONITORED NATURAL ATTENUATION (MNA) AT THE C-AREA BURNING/RUBBLE PIT (131-C) AND OLD C-AREA BURNING/RUBBLE PIT (NBN) OPERABLE UNIT (U) – JANUARY 2021 THROUGH DECEMBER 2022, SEMS NUMBER: 31 (SRNS-RP-2023-00648, REVISION 0, JUNE 2023) RECEIVED JUNE 23, 2023FULMERHENNESSEYCORRESPONDENCE2IRFARF-024329.pdf
02433010/12/2023SRNS-OS-2023-00280EPA COMMENTS ON THE 2022 K-AREA BURNING/RUBBLE PIT AND PILE (131-K AND 631-20G) (KBRP) AND P-AREA BURNING/RUBBLE PIT (131-P) (PBRP) OPERABLE UNITS COMBINED GROUNDWATER MONITORING REPORT (SUMMARY), SEMS NUMBERS: 40 AND 59, JUNE 2023J. RICHARDSB. HENNESSEYCORRESPONDENCE2IRFARF-024330.pdf
02433110/12/2023SRNS-OS-2023-00282EPA COMMENTS ON THE BIENNIAL EFFECTIVENESS MONITORING REPORT (EMR) FOR MONITORED NATURAL ATTENUATION (MNA) AT THE C-AREA BURNING/RUBBLE PIT (131-C) AND OLD C-AREA BURNING/RUBBLE PIT (NBN) OPERABLE UNIT (U), JANUARY 2021 THROUGH DECEMBER 2022, SEMS NUMBER: 31, SRNS-RP-2023-00648, REVISION 0, DATED JUNE 2023J. RICHARDSB. HENNESSEYCORRESPONDENCE4IRFARF-024331.pdf
02433210/12/2023SRNS-OS-2023-00281EPA COMMENTS ON THE TECHNICAL REVIEW OF THE EFFECTIVENESS MONITORING REPORT FOR THE MONITORED NATURAL ATTENUATION (MNA) AT THE CHEMICALS METALS, AND PESTICIDES (CMP) PITS OPERABLE UNIT (OU) (U) APRIL 2022 THROUGH MARCH 2023, SEMS NUMBER: 24, SRNS-RP-2023-00474, REVISION 0, DATED JUNE 2023J. RICHARDSB. HENNESSEYCORRESPONDENCE3IRFARF-024332.pdf
02433310/12/2023SRNS-OS-2023-00283EPA APPROVAL OF THE FISCAL YEAR (FY) 2023 BUDGET ALLOTMENT FOR ENVIRONMENTAL COMPLIANCE & AREA COMPLETION PROJECTS AND FEDERAL FACILITY AGREEMENT REVISION O APPENDIX D FOR FY2023J. RICHARDSB. HENNESSEYCORRESPONDENCE1IRFARF-024333.pdf
02433510/12/2023SRNS-RP-2023-00065THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR THE NOTICE OF AVAILABILITY RECORD OF DECISION FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP ;UMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING OPERABLE UNIT (VOLUME 35, NUMBER 7, DATED OCTOBER 12, 2023)SRNSCOMMUNITY INVOLVEMENT3ARFARF-024335.pdf
02433510/12/2023SRNS-RP-2023-00065THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR THE NOTICE OF AVAILABILITY RECORD OF DECISION FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING OPERABLE UNIT (VOLUME 35, NUMBER 7, DATED OCTOBER 12, 2023)SRNSCOMMUNITY INVOLVEMENT3ARFARF-024335.pdf
02433410/12/2023SRMC-CWDA-2923-00082THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR THE NOTICE OF PUBLIC AVAILABILITY FOR THE EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) FOR INCORPORATING F-AREA DIVERSION BOXES 5 AND 6 INTO THE REVISION 1 INTERIM RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE F-AREA TANK FARM, WASTE TANKS 17 AND 20 (VOLUME 35, NUMBER 8, DATED OCTOBER 12, 2023)SRNSCOMMUNITY INVOLVEMENT3ARFARF-024334.pdf
02508610/12/2023SRNS-OS-2025-00205AFFIDAVITS OF PUBLICATION FROM THE AUGUSTA CHRONICLE AND AIKEN STANDARD & NORTH AUGUSTA STAR NEWSPAPERS FOR NOTICE OF AVAILABILITY RECORD OF DECISION FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING OPERABLE UNITSRNS, SRNSCOMMUNITY INVOLVEMENT2IRFARF-025086.pdf
02508710/12/2023SRNS-OS-2025-00206AFFIDAVITS OF PUBLICATION FROM THE AUGUSTA CHRONICLE, AIKEN STANDARD & NORTH AUGUSTA STAR, AND THE PEOPLE SENTINEL NEWSPAPERS FOR NOTICE OF PUBLIC AVAILABILITY EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) FOR INCORPORATING F-AREA DIVERSION BOXES 5 AND 6 INTO THE REVISION 1 INTERIM RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE F-AREA TANK FARM, WASTE TANKS 17 AND 20SRNS, SRNSCOMMUNITY INVOLVEMENT4IRFARF-025087.pdf
02435110/16/2023ER-IDS-019-034ENVIROMENTAL COMPLIANCE & AREA COMPLETION PROJECTS (EC&ACP) STANDARD OPERATING PROCEDURES, VOL. I HEAVY WATER EQUIPMENT WASH BASIN FIELD INSPECTION CHECKLISTD.E.BARRONSUPPORTING DOCUMENT3IRFARF-024351.pdf
02433610/17/2023RDDD-24-103DOE SUBMITTAL OF THREE PARTY SIGNED RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-20), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2022-01284, REVISION 1, JUNE 2023) SEMS NUMBER: 93B. HENNESSEYS. FULMER J. RICHARDSCORRESPONDENCE2IRFARF-024336.pdf
02433710/17/2023SRNS-OS-2023-00286SCDHEC APPROVAL OF THE 2022 K-AREA BURNING/RUBBLE PIT AND RUBBLE PILE (131-K AND 631-20G) (KBRP) AND P-AREA BURNING/RUBBLE PIT (131-P) (PBRP) OPERABLE UNITS COMBINED GROUNDWATER MONITORING REPORT (SAMPLING SUMMARY), SEMS NUMBERS: 40 AND 59 (RDDD-23-017) DATED JUNE 19, 2023 AND RECEIVED JUNE 21, 2023S. FULMERB. HENNESSEYCORRESPONDENCE2IRFARF-024337.pdf
02433810/18/2023RDDD-23-032DOE SUBMITTAL OF THE U.S. DEPARTMENT OF ENERGY SIGNED SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH OPERATING EQUIPMENT (U) AIKEN, SOUTH CAROLINA (SRNS-RP-2022-00468, REVISION 1, JUNE 2023) AND SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SRS OPERABLE UNITS WITH OPERATING EQUIPMENT FACT SHEET (SRNS-RP-2022-00488, JUNE 2023) (CLEAN COPY) SEMS NUMBER: 00B. HENNESSEYS. FULMER J. RICHARDSCORRESPONDENCE2IRFARF-024338.pdf
02433910/18/2023SRNS-RP-2022-00468U.S. DEPARTMENT OF ENERGY SIGNED SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH OPERATING EQUIPMENT (U) AIKEN, SOUTH CAROLINA (SRNS-RP-2022-00468, REVISION 1, JUNE 2023)SRNSREMEDY REVIEW REPORT616IRFARF-024339.pdf
02434010/18/2023SRNS-RP-2022-00488SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SRS OPERABLE UNITS WITH OPERATING EQUIPMENT FACT SHEET (SRNS-RP-2022-00488, JUNE 2023) (CLEAN COPY)SRNSSUPPORTING DOCUMENT6IRFARF-024340.pdf
02435410/18/2023ER-IDS-019-054ENVIROMENTAL COMPLIANCE & AREA COMPLETION PROJECTS (EC&ACP) STANDARD OPERATING PROCEDURES, VOLUME. I: N-AREA EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE (ECODS) N-2 OPERABLE UNIT FIELD INSPECTION CHECKLISTD.E. BARRONSUPPORTING DOCUMENT3IRFARF-024354.pdf
02440410/18/2023PC-2023-00081COMPLETED POST CLOSURE MAINTENANCE REGISTER FOR ER-IDS-019-054 (DATED I 0/18/2023) N-AREA ECODS N-2 OPERABLE UNITCHARLES CARTERSUPPORTING DOCUMENT1IRFARF-024404.pdf
02455910/18/2023ER-IDS-019-053 REV. 3L-AREA EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE (ECODS) L-1 OPERABLE UNIT FIELD INSPECTION CHECKLISTBARRONSUPPORTING DOCUMENT3IRFARF-024559.pdf
02434110/19/2023WSRC-OS-94-42SAVANNAH RIVER SITE FEDERAL FACILITY AGREEMENT CHANGES DATED 10/19/2023: REVISION 0 APPENDIX D FOR FISCAL YEAR 2023 (PRINT DATE: 09/19/2023) AND RECORD OF MODIFICATIONS TO THE FEDERAL FACILITY AGREEMENT FOR THE SAVANNAH RIVER SITE PAGE 37SRNSFEDERAL FACILITY AGREEMENT6IRFARF-024341.pdf
02434210/19/2023WSRC-OS-94-42SAVANNAH RIVER SITE FEDERAL FACILITY AGREEMENT CHANGES DATED 10/19/23: REVISION 0 APPENDIX D FOR FISCAL YEAR 2023 (PRINT DATE 06/17/2022, UPDATED 09/19/2023) AND RECORD OF MODIFICATION TO THE FEDERAL FACILITY AGREEMENT FOR THE SAVANNAH RIVER SITE, PAGE 37SRNSFEDERAL FACILITY AGREEMENT6IRFARF-024342.pdf
02437210/23/2023ER-IDS-019-036R-AREA BURNING RUBBLE PITS (131-R & 131-1 R) FIELD INSPECTION CHECKLISTCHARLES CARTERSUPPORTING DOCUMENT4IRFARF-024372.pdf
02434310/25/2023O&M PLAN 24-001EXCAVATION OF HOTSPOT FROM SPILL ON 02/01/57 OF UNKNOWN SEEP AGE BASIN PIPE LEAK FROM 904-44G (NBN) – SRS INDEX 225SRNSSUPPORTING DOCUMENT10IRFARF-024343.pdf
02434410/25/2023RDDD-24-102DOE SUBMITTAL OF EFFECTIVENESS MONITORING REPORT (EMR) FOR THE C-AREA GROUNDWATER (CAGW) OPERABLE UNIT REMOVAL ACTION (U) JULY 2022 THROUGH JUNE 2023 (SRNS-RP-2023-00913, REVISION 0, OCTOBER 2023) SEMS NUMBER: 82B. HENNESSEYS. FULMER J. RICHARDSCORRESPONDENCE2IRFARF-024344.pdf
02434510/25/2023SRNS-RP-2023-00913EFFECTIVENESS MONITORING REPORT (EMR) FOR THE C-AREA GROUNDWATER (CAGW) OPERABLE UNIT (OU) REMOVAL ACTION (U) JULY 2022 THROUGH JUNE 2023 (SRNS-RP-2023-00913, REVISION 0, OCTOBER 2023) SEMS NUMBER: 82SRNSSUPPORTING DOCUMENT459IRFARF-024345.pdf
02434610/25/2023WDPD-24-01DOE SUBMITAL OF THREE PARTY SIGNED EXPLANATION OF SIGNIFICANT DIFFERENCE (ESD) FOR INCORPORATING F?AREA DIVERSION BOXES 5 AND 6 INTO THE REVISION I INTERIM RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE F-AREA TANK FARM, WASTE TANKS 17 AND 20 (U) (SRMC-CWDA-2023-00006, REVISION 1, JUNE 2023) SEMS NUMBER: 23; AND NOTIFICATION OF THE INTERIM REMEDIAL ACTION START FOR F-AREA DIVERSION BOXES 5 AND 6B. HENNESSEYS. FULMER J. RICHARDSCORRESPONDENCE2IRFARF-024346.pdf
02436710/25/2023ER-IDS-019-031CENTRAL SHOPS BURNING RUBBLE PITS OPERABLE UNITS (BLDGS. 631-1 G AND 631-3G) FIELD INSPECTION CHECKLISTDOUGLAS BARRONSUPPORTING DOCUMENT4IRFARF-024367.pdf
02437310/25/2023ER-IDS-019-063R-AREA OPERABLE UNIT REACTOR BUILDING AND DISASSEMBLY BASIN FIELD INSPECTION CHECKLISTCHARLES CARTERSUPPORTING DOCUMENT4IRFARF-024373.pdf
02437410/25/2023ER-IDS-019-065P-AREA OPERABLE UNIT REACTOR BUILDING AND DISASSEMBLY BASIN FIELD INSPECTION CHECKLISTCHARLES CARTERSUPPORTING DOCUMENT4IRFARF-024374.pdf
02437910/25/2023G-FDE-F-00064FACILITY DECOMMISSIONING EVALUATION (FDE) FOR BUILDING 607-3F, SEWAGE LIFT STATION (G-FDE-F-00064, REVISION 0, OCTOBER 25, 2023) SIMPLE MODELSRNSFACILITY DECOMMISSIONG EVALUATIONS6IRFARF-024379.pdf
02434310/25/2023O&M PLAN 24-001EXCAVATION OF HOTSPOT FROM SPILL ON 02/01/57 OF UNKNOWN SEEPAGE BASIN PIPE LEAK FROM 904-44G (NBN) – SRS INDEX 225SRNSSUPPORTING DOCUMENT10IRFARF-024343.pdf
02434710/26/2023SRNS-J2000-2023-00713SRNS SUBMITTAL OF THE NOTIFICATION OF THE CHANGE IN THE SUBMITTAL DATE OF THE D-AREA GROUNDWATER OPERABLE UNIT TREATABILITY STUDY DATA REPORTSRNSCORRESPONDENCE1IRFARF-024347.pdf
02434810/31/2023RDDD-24-106DOE SUBMITTAL LETTER OF DESIGNATION OF U.S. DEPARTMENT OF ENERGY FEDERAL FACILITY AGREEMENT PROJECT MANAGERMCMILLIANFULMERCORRESPONDENCE2IRFARF-024348.pdf
02435211/01/2023SRNS-OS-2023-00327SCDHEC APPROVAL OF CORRECTIVE MEASURES IMPLEMENTATION PLAN/REMEDIAL ACTION IMPLEMENTATION PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U), SEMS NUMBER:93 (SRNS-RP-2023-00535, REVISION 0, AUGUST 2023) RECEIVED AUGUST 10, 2023S.FULMERA.HAMMETTCORRESPONDENCE1IRFARF-024352.pdf
02435311/01/2023SRNS-OS-2023-00328SCDHEC APPROVAL OF THE LAND USE CONTROL IMPLEMENTATION PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U), SEMS NUMBER:93 (SRNS-RP-2023-00536, REVISION 0, AUGUST 2023) RECEIVED AUGUST 10, 2023S. FULMERA.HAMMETT1IRFARF-024353.pdf
02436411/01/2023SRNS-RP-2022-00468US DOE AND SCDHEC SIGNED SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH OPERATING EQUIPMENT (U) ? AIKEN, SOUTH CAROLINA (SRNS-RP-2022-00468, REVISION 1, JUNE 2023) SEMS NUMBER: 00SRNSREMEDY REVIEW REPORT616IRFARF-024364.pdf
02436311/02/2023SRNS-OS-2023-00329SCDHEC SUBMITTAL OF THE FOR SIGNATURE SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH OPERATING EQUIPMENT (U) ? AIKEN, SOUTH CAROLINA (SRNS-RP-2022-00468, REVISION 1, JUNE 2023)S. FULMERJ. RICHARDSCORRESPONDENCE1IRFARF-024363.pdf
02434911/02/2023RDDD-24-105DOE SUBMITTAL OF THE SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE 2023 GROUNDWATER MONITORING REPORT FOR THE D-AREA GROUNDWATER OPERABLE UNIT (U) (SRNS-RP-2023-00261, REVISION 0, MARCH 2023) SEMS NUMBER: 63AVERY HAMMETTSUSAN FULMER / JON RICHARDSCORRESPONDENCE78IRFARF-024349.pdf
02435611/02/2023SRNS-RP-2023-01199THE SAVANNAH RIVER SITE ENVIRONMENTAL BULLETIN FOR U.S. DEPARTMENT OF ENERGY CONDUCTS PHASED SUBMITTALS OF THE SEVENTH FIVE-YEAR REMEDY REVIEW AT SAVANNAH RIVER SITE FIRST PHASE: SAVANNAH RIVER SITE OPERABLE UNITS WITH NATIVE SOIL COVERS AND/OR LAND USE CONTROLS (VOLUME 35, NUMBER 10, DATED NOVEMBER 2, 2023)SRNSCOMMUNITY INVOLVEMENT4IRFARF-024356.pdf
02508811/02/2023SRNS-OS-2025-00207AFFIDAVITS OF PUBLICATION FROM THE AIKEN STANDARD & NORTH AUGUSTA STAR AND THE STATE NEWSPAPERS FOR U. S. DEPARTMENT OF ENERGY CONDUCTS PHASED SUBMITTALS OF THE SEVENTH FIVE-YEAR REMEDY REVIEW AT SAVANNAH RIVER SITE FIRST PHASE: SAVANNAH RIVER SITE OPERABLE UNITS WITH NATIVE SOIL COVERS AND/OR LAND USE CONTROLSTSRNS, SRNSCOMMUNITY INVOLVEMENT2IRFARF-025088.pdf
02472211/03/2023SRNS-RP-2023-00858SCOPING SUMMARY FOR THE A-AREA ASH PILE (788-A), A-AREA COAL PILE RUNOFF BASIN (788-3A), F-AREA ASH LANDFILL (288-F), H-AREA ASH BASIN (288-H), K-AREA ASH BASIN (188-K), AND L-AREA ASH BASIN (188-L) IN SUPPORT OF BENEFICIAL REUSE OF SELECT COAL ASH AND COAL FINES OPERABLE UNITS AT THE SAVANNAH RIVER SITE (FOCUSED EARLY ACTION CORRECTIVE MEASURES STUDY / FEASBILITY STUDY) (SRNS-RP-2023-00858, FINAL, NOVEMBER 2023)SRNSSUPPORTING DOCUMENT29IRFARF-024722.pdf