Administrative Record File/Information Repository File (ARF/IRF)
Jump To:
Index of documents (PDF) contained in the ARF/IRF, which are available at the University of South Carolina Libraries – Aiken and Columbia on CD. This index is in PDF (portable document format) which requires Adobe Acrobat Reader software to be installed on your computer.
In 2020, SRS began posting PDFs of the ARF/IRF records on the SRS external website. In addition, this external website contains an Index of Documents (see link above). The index is currently dated 1/8/2026 and lists entries numbered from 000001 to 025261. The PDFs that are currently posted on the list below are dated from 10/1/2017 to 1/8/2026. The Index of Documents and PDFs will be updated quarterly. Historical PDFs will be added at a later date.
Disclaimer: The scanning process used to transfer documents into the portable document format may unintentionally create minor inaccuracies in the text. The viewer is warned that minor spelling errors may occur and numerical data may be missing decimal points or exponential values. Should the viewer have any questions regarding a particular section of text, an accurate hardcopy is always available from the Area Completion Project Document Control at the Savannah River Site, Luchelle Abney at (803) 952-7401.
Introduction
The Administrative Record File contains the documents and information considered or relied on in the selection of a response action and in controlling hazardous waste management activities. At the Savannah River Site, the Administrative Record File will fulfill the requirements of Section XXXIV, Administrative Record, of the Federal Facility Agreement (FFA).
An Administrative Record File for an individual waste unit is initiated upon the approval by the EPA-IV and the SCDHEC of an RFI/RI Work Plan. The File is compiled until the decision of the response action is chosen (the signing of the Record of Decision). At that time the Administrative Record File is finalized and is called the Administrative Record for that waste unit.
An Administrative Record serves two primary purposes. First, it is a vehicle for public participation in the selection of the response action. Section 113(k)(2) of CERCLA provides the public with an opportunity to participate in a response decision. The Administrative Record makes available the information considered or relied on in the selection and provides the opportunity for public involvement. Without opportunity for this involvement of interested persons, the limitation of court review solely to the Administrative Record can be challenged. Therefore, the Administrative Record will also record the public participation in the decision process and reflect the views of members of the public.
The second purpose of the Administrative Record is concerned with the presentation of evidence in the event of litigation. Judicial review of any issue concerning the adequacy of a response selection is limited to the Administrative Record. Under section 113(j)(2) of CERCLA, the trial court reviewing the selected response decision is limited the facts as set out in the Administrative Record. The Courts will not allow the use of discovery, hearings or additional fact findings unless the Administrative Record is found to be incomplete or poorly prepared. Provided the Administrative Record is adequate, the court will limit its review of the response decision made to the standard of arbitrary and capricious or otherwise not in accordance with the law. The Administrative Record should therefore chronicle the response decision process, whereby a judge could easily follow how and why a decision was made.
An Information Repository File contains information and documents that do not meet the definition of Administrative Record Files but that contain site and unit information, documents on site and unit activities, and general information.
Each entry in the Administrative Record File Index contains the following information:
- ARF/IRF Catalog Number – A unique number assigned to each document or piece of information. For those documents that are microfilmed, the number is stamped on the top of the document to aid in locating the document on the microfilm.
- Date –The date the document or information was issued.
- Document Number – Many of the documents published or produced by the SCDHEC, EPA and SRS are assigned unique numbers. If no document number has been assigned, it is so indicated by the entry of a unique sequence number known as the catalog number. This number is for electronic tracking only.
- Title –The title of the document, or a brief description of the contents.
- Author – The person or party responsible for the issuance or writing of the document or information
- Author Affiliation – The organization that the author works for or is affiliated with.
- Addressee – In most cases this entry will be blank except if the document is correspondence. The entry, in that case, will be the individual(s) to whom the correspondence was addressed.
- Addressee Affiliation – In most cases this entry will be blank except if the document is correspondence. The entry in that case will be the organization(s) to which the Addressee is affiliated.
- Appx. No. of Pages – The approximate number of pages the document contains.
- Document Type – Each document is categorized according to one of the following types of information:
- Community Involvement/Relations
- Correspondence
- Draft RFI/RI Work Plan
- Federal Facility Agreement
- Final RFI/RI Work Plan
- Guidance
- Interim Action Proposed Plan
- Meeting Minutes
- Proposed Plan
- Risk Assessment Document
- Site Evaluation Report
- Supporting Document
- Classification – The entry will contain one of the three following codes:
- U – The information is unclassified and available to the general public for viewing.
- CP – The information or document is considered confidential or privileged. The document may contain sensitive information and is not available to the general public. It may be included in an Administrative Record File as it was used to support the decision making, but cannot be made publicly available.
PDF Downloads
3870 records available.
| CATALOG NUMBER | DATE | DOCUMENT NUMBER ↑ | TITLE | AUTHOR | ADDRESSEE | DOC TYPE | APPX # OF PAGES | FILE TYPE | PDF FILE |
|---|---|---|---|---|---|---|---|---|---|
| 023551 | 01/20/2022 | IACD-22-121 | U.S. DEPARTMENT OF ENERGY (DOE) NOTIFICATION OF PROPOSED LEASE TO VERIZON FOR CELLULAR TOWER AND REQUEST FOR U.S. ENVIRONMENTAL PROTECTION AGENCY'S CONCURRENCE OF THE DOE'S CLEAN PARCEL DETERMINATION TO SUPPORT THE LEASE | B. HENNESSEY | S. FULMER | CORRESPONDENCE | 3 | IRF | ARF-023551.pdf |
| 023556 | 01/24/2022 | IACD-22-122 | DOE SUBMITTAL FOR THE FEDERAL FACILITY AGREEMENT (FFA) REVISION 1 APPENDIX E, LONG-TERM PROJECTIONS FOR FISCAL YEAR (FY) 2022 (PRINT DATE: 01/18/2022) AND SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE FFA REVISION 0 APPENDIX E FOR FY2022 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 39 | IRF | ARF-023556.pdf |
| 023564 | 01/31/2022 | IACD-22-123 | DOE SUBMITTAL OF THE TREATABILITY STUDY DATA REPORT FOR GROUNDWATER INJECTION AND DISCHARGE CANAL NEUTRALIZATION AT THE D-AREA GROUNDWATER OPERABLE UNIT (OU) 2021 DATA AND INFORMATION (U) (SRNS-TR-2022-00026, REVISION 0, JANUARY 2022) SEMS NUMBER: 63 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023564.pdf |
| 023566 | 01/31/2022 | IACD-22-124 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE FEDERAL FACILITY AGREEMENT REVISION 0 APPENDIX C RCRA/CERCLA UNITS, REVISION 0 APPENDIX G SITE EVALUATION AREAS, AND REVISION 0 APPENDIX K D AND D FACILITIES FOR FISCAL YEAR 2022 (PRINT DATE: 09/14/2021) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 4 | IRF | ARF-023566.pdf |
| 023580 | 02/09/2022 | IACD-22-125 | DOE SUBMITTAL OF THE SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE BIENNIAL EFFECTIVENESS MONITORING REPORT (EMR) FOR MONITORED NATURAL ATTENUATION (MNA) AT THE C-AREA BURNING/RUBBLE PIT (131-C) AND OLD C-AREA BURNING/RUBBLE PIT (NBN) OPERABLE UNIT (U) JANUARY 2019 THROUGH DECEMBER 2020 (SRNS-RP-2021-03749, REVISION 0, JUNE 2021) SEMS NUMBER: 31 | B. HENNESSEY | S.FULMER | CORRESPONDENCE | 10 | IRF | ARF-023580.pdf |
| 023571 | 02/03/2022 | IACD-22-126 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE EFFECTIVENESS MONITORING REPORT (EMR) FOR THE C-AREA GROUNDWATER (CAGW) OPERABLE UNIT REMOVAL ACTION (U) JULY 2020 THROUGH JUNE 2021 (SRNS-RP-2021-04758, REVISION 0, SEPTEMBER 2021) SEMS NUMBER: 82 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 7 | IRF | ARF-023571.pdf |
| 023583 | 02/14/2022 | IACD-22-127 | DOE SUBMITTAL OF THE SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE EFFECTIVENESS MONITORING REPORT FOR THE MONITORED NATURAL ATTENUATION (MNA) AT THE CHEMICALS, METALS, AND PESTICIDES (CMP) PITS OPERABLE UNIT (OU) (U) APRIL 2020 THROUGH MARCH 2021 (SRNS-RP-2021-03832, REVISION 0, JUNE 2021) SEMS NUMBER:21 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 26 | ARF-023583.pdf | |
| 023572 | 02/03/2022 | IACD-22-128 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE 2020 ANNUAL COMPREHENSIVE TNX AREA GROUNDWATER MONITORING AND REMEDIAL ACTION EFFECTIVENESS INTERIM REPORT (U) (SRNS-RP-2021-03858, REVISION 0, JUNE 2021) SEMS NUMBERS: 21, 29 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 8 | IRF | ARF-023572.pdf |
| 023584 | 02/16/2022 | IACD-22-129 | DOE SUBMITTAL OF THE RFI/RI WORK PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE L-3 (NBN), L-AREA RUBBLE PIT (131-LL), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT (U) (SRNS-RP-2021-05602, REVISION 0, FEBRUARY 2022) AND THE SCOPING SUMMARY FOR THE ECODS L-3 (EAST OF L AREA) (NBN), L-AREA RUBBLE PIT (131-LL), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT (SRNS-RP-2021-05232, DECEMBER 2021) SEMS NUMBER: 91 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023584.pdf |
| 023606 | 02/28/2022 | IACD-22-130 | DOE SUBMITTAL OF THE REMOVAL SITE EVALUATION REPORT/ENGINEERING EVALUATION/COST ANALYSIS (RSER/EE/CA) F-AREA MATERIAL STORAGE BUILDING (235-F) (SRNS-RP-2021-00001, REVISION 1, FEBRUARY 2022) (CLEAN COPY AND REDLINE), SAVANNAH RIVER SITE RESPONSES TO REGULATORY COMMENTS ON THE REVISION 0 DOCUMENT, AND THE DRAFT ACTION MEMORANDUM | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 69 | IRF | ARF-023606.pdf |
| 023598 | 02/24/2022 | IACD-22-131 | DOE SUBMITTAL OF THE SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE DECOMMISSIONING PROJECT FINAL REPORTS (DPFRS) FOR BUILDING 480-3D, MAINTENCE FIELD OFFICE AND SHOP (V-PCOR-D-00062, REVISION 0, JULY 5, 2021), BUILDING 717-3D, D-AREA WELDING SHOP (V-PCOR-D-00063, REVISION 0, JULY 8, 2021), BUILDING 704-7D, D-AREA MAINTENANCE BUILDING (V-PCOR-D-00064, REVISION 0, JULY 12, 2021), BUILDING 710-16D, STORAGE BUILDING (V-PCOR-D-00065, REVISION 0, JULY 8, 202I) AND BUILDINGS 485-D AND 482-2D, D-AREA COOLING TOWER AND SWITCHGEAR BUILDING (V-PCOR-D-00061, REVISION 0, NOVEMBER 2, 2021) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 19 | IRF | ARF-023598.pdf |
| 023616 | 03/03/2022 | IACD-22-132 | DOE SUBMITTAL LETTER OF THE DECOMMISSIONING PROJECT FINAL REPORT BUILDING 483-3D, ELECTRICAL CONTROL BUILDING (V-PCOR-D-00067, REVISION 0, FEBRUARY 22, 2022) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023616.pdf |
| 023609 | 03/02/2022 | IACD-22-133 | DOE SUBMITTAL OF THE THIRTY (30)-DAY EXTENSION NOTIFICATION FOR THE RCRA FACILITY / REMEDIAL INVESTIGATION WORK PLAN FOR THE D-AREA GROUNDWATER OPERABLE UNIT (D-AREA UPGRADIENT SOURCES) (U) (SRNS-RP-2019-00394, REVISION 1) AND SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE REVISION 0 DOCUMENT, SEMS NUMBER: 63 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023609.pdf |
| 023624 | 03/08/2022 | IACD-22-134 | DOE SUBMITTAL LETTER OF THE THIRTY (30) DAY EXTENSION NOTIFICATION FOR THE RESOURCE CONSERVATION AND RECOVERY ACT FACTILITY INVESTIGATION/REMEDIAL INVESTIGATION REPORT WITH BASELINE RISK ASSESSMENT AND CORRECTIVE MEASURES STUDY/FEASIBILITY STUDY FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2021-00548, REVISION 1 REDLINE) AND SAVANNAH RIVER SITE'S RESPONSES TO REGULATORY COMMENTS ON THE REVISION 0 DOCUMENT SEMS NUMBER: 93 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023624.pdf |
| 023647 | 03/29/2022 | IACD-22-135 | DOE SUBMITTAL OF THE REMEDIAL ACTION IMPLEMENTATION PLAN FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT UPPER SUBUNIT (U) (SRNS-RP-2022-00011, REVISION 0, MARCH 2022), LAND USE CONTROL IMPLEMENTATION PLAN (LUCIP) FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT (UPPER SUBUNIT) (U) (SRNS-RP-2022-00017, REVISION 0, MARCH 2022) AND THE MONITORED NATURAL RECOVERY EFFECTIVENESS PLAN FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT – UPPER SUBUNIT (U) (SRNS-RP-2022-00085, REVISION 0, MARCH 2022) SEMS NUMBER: 35 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023647.pdf |
| 023653 | 04/04/2022 | IACD-22-136 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE 2020 GROUNDWATER MONITORING REPORT FOR THE D-AREA GROUNDWATER OPERABLE UNIT (U) (SRNS-RP-2021-03748, REVISION 0, JULY 2021) SEMS NUMBER: 63 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 50 | IRF | ARF-023653.pdf |
| 023654 | 04/04/2022 | IACD-22-137 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE CALENDAR YEAR 2020 D-AREA OIL SEEPAGE BASIN OPERABLE UNIT (631-G) GROUNDWATER MIXING ZONE LETTER REPORT, SEMS NUMBER: 27 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 7 | IRF | ARF-023654.pdf |
| 023662 | 04/13/2022 | IACD-22-138 | DOE SUBMITTAL FOR THE RCRA FACILITY INVESTIGATION / REMEDIAL INVESTIGATION (RFI/RI) WORK PLAN FOR THE D-AREA GROUNDWATER OPERABLE UNIT (D-AREA UPGRADIENT SOURCES) (U) (SRNS-RP-2019-00394, REVISION 1 REDLINE, APRIL 2022) AND SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE REVISION 0 DOCUMENT, SEMS NUMBER: 63 | B. HENNESSEY | J. RICHARDS. S. FULMER | CORRESPONDENCE | 14 | IRF | ARF-023662.pdf |
| 023668 | 04/21/2022 | IACD-22-139 | DOE SUBMITTAL OF THE RESOURCE CONSERVATION AND RECOVERY ACT FACILITY INVESTIGATION/REMEDIAL INVESTIGATION REPORT WITH BASELINE RISK ASSESSMENT AND CORRECTIVE MEASURES STUDY/FEASIBILITY STUDY FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2021-00548, APRIL 2022, REVISION 1 REDLINE) AND SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE REVISION 0 DOCUMENT, SEMS NUMBER: 93 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 51 | IRF | ARF-023668.pdf |
| 023657 | 04/07/2022 | IACD-22-140 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE EFFECTIVENESS MONITORING REPORT (EMR) FOR THE P-AREA GROUNDWATER (PAGW) OPERABLE UNIT (OU) ZERO VALENT IRON PERMEABLE REACTIVE BARRIER (ZVI-PRB) REMOVAL ACTION (U) MARCH 2019 THROUGH MARCH 2021 (SRNS-RP-2021-00016, REVISION 0, SEPTEMBER 2021) SEMS NUMBER: 81 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 18 | IRF | ARF-023657.pdf |
| 023664 | 04/13/2022 | IACD-22-141 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE DRAFT ACTION MEMORANDUM FOR THE NON-TIME CRITICAL REMOVAL ACTION FOR THE 235-F BUILDING (IACD-22-130, DATED FEBRUARY 28, 2022) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 6 | IRF | ARF-023664.pdf |
| 023666 | 04/18/2022 | IACD-22-142 | DOE SUBMITTAL OF THE DECOMMISSIONING PROJECT FINAL REPORT BUILDING 607-14D, CHEMICAL FEED FACILITY (V-PCOR-D-00074, REVISION 0, MARCH 31, 2022) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023666.pdf |
| 023699 | 05/05/2022 | IACD-22-143 | DOE SUBMITTAL OF THE SECOND EARLY ACTION POST-CONSTRUCTION REPORT (EAPCR) FOR THE D-AREA OPERABLE UNIT (U) (SRNS-RP-2022-00064, REVISION 0, MAY 2022) SEMS NUMBER: 63 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023699.pdf |
| 023705 | 05/11/2022 | IACD-22-144 | DOE SUBMITTAL OF THE PERFORMANCE EVALUATION REPORT FOR THE A-AREA BURNING/RUBBLE PITS (731-A, -1A) AND RUBBLE PIT (731-2A) AND THE MISCELLANEOUS CHEMICAL BASIN/METALS BURNING PIT (731-4A, -5A) OPERABLE UNIT – JANUARY THROUGH DECEMBER 2021 (U) (SRNS-RP-2022-00178, REVISION 0, MAY 2022) SEMS NUMBER: 28 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023705.pdf |
| 023717 | 05/19/2022 | IACD-22-145 | DOE SUBMITTAL OF ACTION MEMORANDUM AND RESPONSIVENESS SUMMARY FOR THE NON-TIME CRITICAL REMOVAL ACTION FOR THE F-AREA MATERIAL STORAGE BUILDING (235-F) | J. MCMILLIAN | J. RICHARDS | CORRESPONDENCE | 4 | IRF | ARF-023717.pdf |
| 023721 | 05/26/2022 | IACD-22-146 | DOE SUBMITTAL OF THE DECOMMISSIONING PROJECT FINAL REPORT FOR BUILDING 704-7D, D-AREA MAINTENANCE BUILDING (V-PCOR-D-00064, REVISION 1, MAY 17, 2022) AND SAVANNAH RIVER SITE'S RESPONSE TO THE REGULATORY COMMENT ON THE REVISION 0 REPORT | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 4 | IRF | ARF-023721.pdf |
| 023725 | 06/01/2022 | IACD-22-147 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSE TO THE REGULATORY COMMENT ON THE ADMINISTRATIVE RECORD FILE / INFORMATION REPOSITORY FILE ANNUAL INDICES UPDATE (SRNS-RP-2021-05286, NOVEMBER 2021) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 3 | IRF | ARF-023725.pdf |
| 023745 | 06/22/2022 | IACD-22-148 | DOE SUBMITTAL OF THE CERTIFIED CLEAN COPY OF THE RESOURCE CONSERVATION AND RECOVERY ACT FACILITY INVESTIGATION/REMEDIAL INVESTIGATION REPORT WITH BASELINE RISK ASSESSMENT AND CORRECTIVE MEASURES STUDY/ FESABILITY STUDY FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2021-00548, REVISION 1, APRIL 2022) SEMS NUMBER: 93 | B | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023745.pdf |
| 023738 | 06/16/2022 | IACD-22-149 | DOE SUBMITALL OF EFFECTIVENESS MONITORING REPORT FOR THE MONITORED NATURAL ATTENUATION (MNA) AT THE CHEMICALS, METALS, AND PESTICIDES (CMP) PITS OPERABLE UNIT (OU) (U) APRIL 2021 THROUGH MARCH 2022 (SRNS-RP-2022-00342, REVISION 0, JUNE 2022) SEMS NUMBER: 24 | B. HENNESSEY | S. FULMER | CORRESPONDENCE | 2 | IRF | ARF-023738.pdf |
| 023727 | 06/09/2022 | IACD-22-150 | DOE SUBMITTAL LETTER FOR THE THIRTY (30) DAY EXTENSION NOTIFICATION FOR THE SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH GEOSYNTHETIC OR STABALIZATION/SOLIDIFICATION COVER SYSTEMS (U) AIKEN, SOUTH CAROLINA (SRNS-RP-2021-04229, REVISION 1) AND SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE REVISION 0 DOCUEMTN, SEMS NUMBER: 00 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023727.pdf |
| 023757 | 06/29/2022 | IACD-22-151 | DOE SUBMITTAL OF 2021 GROUNDWATER MIXING ZONE REPORT FOR THE R-AREA REACTOR SEEPAGE BASINS/ 108-4R OVERFLOW BASIN OPERABLE UNIT (SRNS-RP-2022-00212, REVISION 0, JUNE 2022) SEMS NUMBER:25 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023757.pdf |
| 023752 | 06/28/2022 | IACD-22-152 | DOE SUBMITTAL OF THE REMOVAL ACTION REPORT FOR THE 484-17D COAL STORAGE AREA (U) (SRNS-RP-2022-00071, REVISION 0, JUNE 2022) SEMS NUMBER: 63 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023752.pdf |
| 023759 | 06/29/2022 | IACD-22-153 | DOE SUBMITTAL OF K-AREA BURNING/ RUBBLE PIT AND RUBBLE PILE (131-K AND 631-20G) (KBRP), AND P-AREA BURNING/ RUBBLE PIT (131-P) (PBRP) OPERABLE UNITS (OU) DETAILED COMBINED GROUNDWATER MONITORING REPORT (SRNS-RP-2022-00253, REVISION 0, JUNE 2022) SEMS NUMBERS: 40, 56, AND 59 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023759.pdf |
| 023744 | 06/21/2022 | IACD-22-154 | DOE SUBMITTAL OF THE FISCAL YEAR (FY) 2022 BUDGET ALLOTMENT FOR ENVIRONMENTAL COMPLIANCE & AREA COMPLETION PROJECTS AND FEDERAL FACILITY AGREEMENT REVISION 0 APPENDIX D FOR FY2022 (PRINT DATE: 06/17/2022) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 8 | IRF | ARF-023744.pdf |
| 023875 | 09/20/2022 | IACD-22-155 | DOE SUBMITTAL OF THE RCRA FACILITY INVESTIGATION / REMEDIAL INVESTIGATION WORK PLAN FOR THE D-AREA GROUNDWATER OPERABLE UNIT (D-AREA UPGRADIENT SOURCES) (U) (SRNS-RP-2019-00394, REVISION 1, APRIL 2022) (CERTIFIED CLEAN COPY), SEMS NUMBER: 63 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023875.pdf |
| 023766 | 07/11/2022 | IACD-22-156 | DOE SUBMITTAL OF THE SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH GEOSYNTHETIC OR STABALIZATION/SOLIDIFICATION COVER SYSTEMS (U) AIKEN, SOUTH CAROLINA (SRNS-RP-2021-04229, REVISION 1, JULY 2022) (REDLINE PAGES) AND SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE REVISION 0 DOCUMENT, SEMS NUMBER: 00 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 40 | IRF | ARF-023766.pdf |
| 023764 | 07/06/2022 | IACD-22-157 | DOE SUBMITTAL OF THE THIRTY (30)-DAY EXTENSTION NOTIFICATION FOR THE RFI/RI WORK PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE L-3 (NBN), L-AREA RUBBLE PIT (131-1L), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT (U) (SRNS-RP-2021-05602, REVISION 1 REDLINE) AND SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE REVISION 0 DOCUMENT, SEMS NUMBER: 91 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023764.pdf |
| 023773 | 07/11/2022 | IACD-22-158 | DOE SUBMITTAL OF FACILITY DECOMMISSIONING EVALUATION BUILDING 233-22H, ADMINISTRATION BUILDING (G-FDE-H-00006, REVISION 0, AUGUST 25, 2020) SIMPLE MODEL | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023773.pdf |
| 023772 | 07/11/2022 | IACD-22-159 | DOE SUBMITTAL OF FACILITY DECOMMISSIONING EVALUATION BUILDING 233-23H, RTF WAREHOUSE, AND BUILDING 233-24H, MAINTENANCE SHOP (G-FDE-H-00007, REVISION 0, JANUARY 28, 2021) SIMPLE MODEL | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023772.pdf |
| 023809 | 08/01/2022 | IACD-22-160 | DOE SUBMITTAL OF THE STATEMENT OF BASIS/PROPOSED PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2022-00202, REVISION 0, JULY 2022), STATEMENT OF BASIS/PROPOSED PLAN FACT SHEET (SRNS-RP-2022-00528, JULY 2022), SCOPING SUMMARY (SRNS-RP-2019-00764, JUNE 2022 FINAL), AND THE DRAFT PUBLIC NOTICE INFORMATION, SEMS NUMBER: 93 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 15 | IRF | ARF-023809.pdf |
| 023797 | 07/21/2022 | IACD-22-161 | DOE SUBMITTAL OF RFI/RI WORK PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE L-3 (NBN), L-AREA RUBBLE PIT (131-1L), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT (U) (SRNS-RP-2021-05602, REVISION 1 REDLINE, JULY 2022), SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE REVISION 0 DOCUMENT, AND THE REVISED IMPLEMENTATION SCHEDULE, SEMS NUMBER: 91 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 41 | IRF | ARF-023797.pdf |
| 023802 | 07/27/2022 | IACD-22-162 | DOE SUBMITTAL OF THE 2021 GROUNDWATER MIXING ZONE REPORT FOR THE D-AREA OIL SEEPAGE BASIN (631-G) (U) (SRNS-RP-2022-00396, REVISION 0, JULY 2022) SEMS NUMBER: 27 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023802.pdf |
| 023807 | 07/28/2022 | IACD-22-163 | DOE SUBMITTAL OF THE 448-4D ASH LANDFILL ANNUAL GROUNDWATER MONITORING REPORT – 2021 DATA (SRNS-RP-2022-00559, REVISION 0, JULY 2022) SEMS NUMBER 63 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023807.pdf |
| 023792 | 07/19/2022 | IACD-22-164 | DOE SUBMITTAL LETTER FOR THE DECOMMISSIONING PROJECT FINAL REPORT BUILDING 454-D, D-AREA DIESEL FUEL TANK (V-PCOR-D-00048, REVISION 0, JULY 14, 2022) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023792.pdf |
| 023794 | 07/20/2022 | IACD-22-165 | DOE SUBMITTAL OF DECOMMISSIONING PROJECT FINAL REPORT BUILDING 484-12D, D-AREA STORAGE BUILDING (V-PCOR-D-00047, REVISION 0, JULY 18, 2022) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023794.pdf |
| 023796 | 07/21/2022 | IACD-22-166 | DOE SUBMITTAL OF THE PREFERRED REMEDIAL ACTION AND REGULATORY STRATEGY FOR REMAINING SAVANNAH RIVER SITE'S COAL ASH AND COAL FINES OPERABLE UNITS (U) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 38 | IRF | ARF-023796.pdf |
| 023813 | 08/08/2022 | IACD-22-167 | DOE SUBMITTAL OF U.S. DEPARTMENT OF ENERGY (DOE) NOTIFICATION OF PROPOSED LAND LEASE FOR PEN BRANCH CELLULAR TOWER SITE | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 3 | IRF | ARF-023813.pdf |
| 023853 | 08/30/2022 | IACD-22-168 | DOE SUBMITTAL OF THE REMEDIAL ACTION IMPLEMENTATION PLAN FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT UPPER SUBUNIT (U) (SRNS-RP-2022-00011, REVISION 1 REDLINE, AUGUST 2022), LAND USE CONTROL IMPLEMENTATION PLAN (LUCIP) FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT (UPPER SUBUNIT) (U) (SRNS-RP-2022-00017, REVISION 1 REDLINE, AUGUST 2022), AND MONITORED NATURAL RECOVERY EFFECTIVENESS PLAN FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT – UPPER SUBUNIT (U) (SRNS-RP-2022-00085, REVISION 1 REDLINE, AUGUST 2022) SEMS NUMBER: 35 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 27 | IRF | ARF-023853.pdf |
| 023842 | 08/29/2022 | IACD-22-169 | DOE SUBMITTAL OF THE 2021 ANNUAL COMPREHENSIVE TNX AREA GROUNDWATER MONITORING AND REMEDIAL ACTION EFFECTIVENESS INTERIM REPORT (U) (SRNS-RP-2022-00627, REVISION 0, AUGUST 2022) SEMS NUMBERS: 21, 29 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023842.pdf |
| 023834 | 08/24/2022 | IACD-22-170 | DOE SUBMITTAL OF DECOMMISSIONING PROJECT FINAL REPORT BUILDING 484-13D, D-AREA STORAGE BUILDING (V-PCOR-D-00076, REVISION 0, AUGUST 11, 2022) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023834.pdf |
| 023836 | 08/24/2022 | IACD-22-171 | DOE SUBMITTAL OF DECOMMISSIONING PROJECT FINAL REPORT BUILDING 683-D, D-AREA CHLORINE UNLOADING AND STORAGE (V-PCOR-D-00045, REVISION 0, AUGUST 11, 2022) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023836.pdf |
| 023838 | 08/25/2022 | IACD-22-172 | DOE SUBMITTAL OF THE BIENNIAL EFFECTIVENESS MONITORING REPORT (SAMPLING SUMMARY) FOR THE MONITORED NATURAL ATTENUATION AT THE L-AREA SOUTHERN GROUNDWATER OPERABLE UNIT, 2020 THROUGH 2021, SEMS NUMBER: 77 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 13 | IRF | ARF-023838.pdf |
| 023829 | 08/23/2022 | IACD-22-173 | DOE SUBMITTAL OF THE U.S. DEPARTMENT OF ENERGY NOTIFICATION OF PROPOSED LEASE FOR SBA N-AREA CELL TOWER SITE | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 3 | IRF | ARF-023829.pdf |
| 023830 | 08/23/2022 | IACD-22-174 | DOE SUBMITTAL OF THE U.S. DEPARTMENT OF ENERGY NOTIFICATION OF PROPOSED LEASE FOR SBA LANDFILL CELL TOWER SITE | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 3 | IRF | ARF-023830.pdf |
| 023833 | 08/23/2022 | IACD-22-175 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSE TO THE SOUTH CAROLINA DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL'S COMMENT ON THE DECOMMISSIONING PROJECT FINAL REPORT BUILDING 607-14D, CHEMICAL FEED FACILITY (V-PCOR-D-00074, REVISION 0, MARCH 31, 2022) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 3 | IRF | ARF-023833.pdf |
| 023868 | 09/08/2022 | IACD-22-176 | DOE SUBMITTAL OF NOTIFICATION OF THE RFI/RI FIELD START FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE L-3 (NBN), L-AREA RUBBLE PIT (131-1L), AND L-AREA RUBBLE PIT (131-4L) OPERABLE UNIT, SEMS NUMBER: 91 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023868.pdf |
| 023877 | 09/20/2022 | IACD-22-177 | DOE SUBMITTAL OF THE RFI/RI WORK PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE L-3 (NBN), L-AREA RUBBLE PIT (131-1L) AND L-AREA RUBBLE PIT PIT (131-4L) OPERABLE UNIT (U) (SRNS-RP-2021-05602, REVISION 1, JULY 2022) (CERTIFIED CLEAN COPY), SEMS NUMBER: 91 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023877.pdf |
| 023870 | 09/13/2022 | IACD-22-178 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE TREATABILITY STUDY DATA REPORT FOR GROUNDWATER INJECTION AND DISCHARGE CANAL NEUTRALIZATION AT THE D-AREA GROUNDWATER OPERABLE UNIT (OU) 2021 DATA AND INFORMATION (U) (SRNS-TR-2022-00026, REVISION 0, JANUARY 2022) SEMS NUMBER: 63 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 6 | IRF | ARF-023870.pdf |
| 023872 | 09/19/2022 | IACD-22-179 | DOE SUBMITTAL OF THE EFFECTIVENESS MONITORING REPORT (EMR) FOR THE C-AREA GROUNDWATER (CAGW) OPERABLE UNIT REMOVAL ACTION (U) JULY 2021 THROUGH JUNE 2022 (SRNS-RP-2022-00530, REVISION 0, SEPTEMBER 2022) SEMS NUMBER: 82 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023872.pdf |
| 023871 | 09/15/2022 | IACD-22-180 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE PREFERRED REMEDIAL ACTION AND REGULATORY STRATEGY FOR REMAINING SAVANNAH RIVER SITE'S COAL ASH AND COAL FINES OPERABLE UNITS (U) (IACD-22-166, DATED JULY 21, 2022) | B. HENNESSEY | J .RICHARDS | CORRESPONDENCE | 4 | IRF | ARF-023871.pdf |
| 023907 | 10/06/2022 | IACD-22-181 | DOE SUBMITTAL LETTER FOR U. S. DEPARTMENT OF ENERGY SIGNED SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH GEOSYNTHETIC OR STABILIZATION / SOLIDIFICATION COVER SYSTEMS (U) AIKEN, SOUTH CAROLINA (SRNS-RP-2021-04229, REVISION 1, JULY 2022) AND SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH GEOSYNTHETIC OR STABILIZATION/ SOLIDIFICATION COVER SYSTEMS FACT SHEET (SRNS-RP-2021-05001, JULY 2022) SEMS NUMBER: 00 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023907.pdf |
| 023887 | 09/28/2022 | IACD-22-182 | DOE SUBMITTAL OF THE SECOND EARLY ACTION POST-CONSTRUCTION REPORT (EAPCR) FOR THE D-AREA OPERABLE UNIT (U) (SRNS-RP-2022-00064, REVISION 1, SEPTEMBER 2022) (REDLINE) AND SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE REGULATORY COMMENTS ON THE REVISION 0 DOCUMENT, SEMS NUMBER: 63 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 13 | IRF | ARF-023887.pdf |
| 023896 | 10/03/2022 | IACD-22-183 | DOE SUBMITTAL OF THE FEDERAL FACILITY AGREEMENT REVISION 0 APPENDIX H SOLID WASTE MANAGEMENT UNITS FOR FISCAL YEAR 2023 (PRINT DATE: 09/28/2022) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 35 | IRF | ARF-023896.pdf |
| 023897 | 10/03/2022 | IACD-22-184 | DOE SUBMITTAL OF THE FEDERAL FACILITY AGREEMENT REVISION 0 APPENDIX C RCRA/CERCLA UNITS, REVISION 0 APPENDIX G SITE EVALUATION AREAS, AND REVISION 0 APPENDIX K D&D FACILITIES FOR FISCAL YEAR 2023 (PRINT DATE: 09/28/2022) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 138 | IRF | ARF-023897.pdf |
| 023956 | 11/10/2022 | IACD-23-101 | DOE SUBMITTAL OF THE EFFECTIVENESS MONITORING REPORT (EMR) FOR THE P-AREA GROUNDWATER (PAGW) OPERABLE UNIT (OU) ZERO VALENT IRON PERMEABLE REACTIVE BARRIER (ZVI-PRB) REMOVAL ACTION (U) APRIL 2021 THROUGH MARCH 2022 (SRNS-RP-2022-00565, REVISION 0, OCTOBER 2022) SEMS NUMBER: 81 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023956.pdf |
| 023916 | 10/13/2022 | IACD-23-102 | DOE SUBMITTAL OF THIRD EXTENSION REQUEST FOR THE SUBMITTAL OF THE EARLY ACTION REMEDIAL INVESTIGATION WORK PLAN (REVISION 0) AND SUBSEQUENT MILESTONES IN SUPPORT OF THE F-AREA OPERABLE UNIT, SEMS NUMBER: 88 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 4 | IRF | ARF-023916.pdf |
| 023965 | 11/16/2022 | IACD-23-103 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE PERFORMANCE EVALUATION REPORT FOR THE A-AREA BURNING/RUBBLE PITS (731-A, -IA) AND RUBBLE PIT (73 L-2A) AND THE MISCELLANEOUS CHEMICAL BASIN/METALS BURNING PIT (73 L-4A, -5A) OPERABLE UNIT – JANUARY THROUGH DECEMBER 2021 (U) (SRNS-RP-2022-00178, REVISION 0, MAY 2022) SEMS NUMBER: 28 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 11 | IRF | ARF-023965.pdf |
| 023932 | 10/26/2022 | IACD-23-104 | DOE SUBMITTAL REQUEST TO DISCONTINUE SUBMITTAL OF THE ADMINISTRATIVE RECORD FILE/INFORMATION REPOSITORY FILE ANNUAL INDICES UPDATE | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023932.pdf |
| 023964 | 11/15/2022 | IACD-23-105 | DOE SUBMITTAL OF FEDERAL FACILITY AGREEMENT REVISION 0 APPENDIX E, LONG-TERM PROJECTIONS FOR FISCAL YEAR 2023 (PRINT DATE: 10/26/2022) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 50 | IRF | ARF-023964.pdf |
| 023958 | 11/10/2022 | IACD-23-106 | DOE SUBMITTAL OF CLEAN COPIES OF THE REMEDIAL ACTION IMPLEMENTATION PLAN FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT UPPER SUBUNIT (U) (SRNS-RP-2022-00011, REVISION 1, AUGUST 2022), LAND USE CONTROL IMPLEMENTATION PLAN (LUCIP) FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT (UPPER SUBUNIT) (U) (SRNS-RP-2022-00017, REVISION 1, AUGUST 2022), AND MONITORED NATURAL RECOVERY EFFECTIVENESS PLAN FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT – UPPER SUBUNIT (U) (SRNS-RP-2022-00085, REVISION 1, AUGUST 2022), SEMS NUMBER: 35 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023958.pdf |
| 023972 | 11/28/2022 | IACD-23-107 | DOE SUBMITTAL OF THE FEDERAL FACILITY AGREEMENT ANNUAL PROGRESS REPORT FOR FISCAL YEAR (SRNS-RP-2022-01026, NOVEMBER 2022) | B. HENNESSEY | S. FULMER | CORRESPONDENCE | 2 | IRF | ARF-023972.pdf |
| 023990 | 12/06/2022 | IACD-23-108 | DOE SUBMITTAL OF THE REMOVAL ACTION REPORT FOR THE 484-17D COAL STORAGE AREA (U) (SRNS-RP-2022-00071, REVISION 1, NOVEMBER 2022) (REDLINE AND CLEAN COPIES) AND SAVANNAH RIVER SITE'S REPONSES TO THE REGULATORY COMMENTS ON THE REVISION 0 DOCUMENT, SEMS NUMBER: 63 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 12 | IRF | ARF-023990.pdf |
| 023966 | 11/17/2022 | IACD-23-109 | DOE SUBMITTAL OF THE SECOND EARLY ACTION POST-CONSTRUCTION REPORT (EAPCR) FOR THE D-AREA OPERABLE UNIT (U) (SRNS-RP-2022-00064, REVISION 1, SEPTEMBER 2022) SEMS NUMBER: 63 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023966.pdf |
| 023968 | 11/17/2022 | IACD-23-110 | DOE SUBMITTAL OF THE SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE DECOMMISSIONING PROJECT FINAL REPORT FOR BUILDING 454-D, D-AREA DIESEL FUEL TANK (V-PCOR-D-00048, REVISION 0, JULY 14, 2022) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 12 | IRF | ARF-023968.pdf |
| 023969 | 11/17/2022 | IACD-23-111 | DOE SUBMITTAL OF THE SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE DECOMMISSIONING PROJECT FINAL REPORT FOR BUILDING 484-12D, D-AREA STORAGE BUILDING (V-PCOR-D-00047, REVISION 0, JULY 18, 2022) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 5 | IRF | ARF-023969.pdf |
| 023977 | 11/30/2022 | IACD-23-112 | DOE SUBMITTAL OF THE FEDERAL FACILITY AGREEMENT ANNUAL REMOVAL ACTION REPORT FOR THE FISCAL YEAR 2022 | B. HENNESSEY | S. FULMER | CORRESPONDENCE | 8 | IRF | ARF-023977.pdf |
| 024001 | 12/15/2022 | IACD-23-113 | DOE SUBMITTAL LETTER FOR THE STATEMENT OF BASIS/PROPOSED PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2022-00202, REVISION 1 REDLINE, DECEMBER 2022) AND SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE REVISION 0 DOCUMENT, SEMS NUMBER: 93 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 21 | IRF | ARF-024001.pdf |
| 023995 | 12/14/2022 | IACD-23-114 | DOE SUBMITTAL OF DECOMMISSIONING PROJECT FINAL REPORT FOR D-AREA COAL HANDLING HOUSES AND ASSOCIATED FACILITIES (V-PCOR-D-00068, REVISION 0, NOVEMBER 20, 2022) | B | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-023995.pdf |
| 024079 | 02/09/2023 | IACD-23-115 | DOE SUBMITTAL LETTER FOR THE SCOPING SUMMARY FOR THE GENERAL SEPARATIONS AREA WESTERN GROUNDWATER OPERABLE UNIT (U) (ERD-EN-2005-0127, FEBRUARY 2023) SEMS NUMBER: 85 AND THE SCOPING SUMMARY FOR THE GENERAL SEPARATIONS AREA EASTERN GROUNDWATER OPERABLE UNIT (U) (WSRC-RP-2000-4134, FEBRUARY 2023) SEMS NUMBER: 46 | B. HENNESSEY | S. FULMER | CORRESPONDENCE | 2 | IRF | ARF-024079.pdf |
| 024010 | 12/20/2022 | IACD-23-116 | DOE SUBMITTAL OF THE SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH OPERATING EQUIPMENT (U) AIKEN, SOUTH CAROLINA (SRNS-RP-2022-00468, REVISION 0, DECEMBER 2022), SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SRS OPERABLE UNITS WITH OPERATING EQUIPMENT FACT SHEET (SRNS-RP-2022-00488, DECEMBER 2022), AND SCOPING SUMMARY FOR THE SIXTH FIVE-YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH OPERATING EQUIPMENT (U) (SRNS-RP-2022-00489, FINAL, AUGUST 2022) SEMS NUMBER: 00 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-024010.pdf |
| 024036 | 01/11/2023 | IACD-23-117 | DOE SUBMITTAL OF THE EXPLANATION OF SIGNIFICANT DIFFERENCE FOR THE REVISION 1 RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE WETLAND AREA AT DUNBARTON BAY IN SUPPORT OF STEEL CREEK INTEGRATOR OPERABLE UNIT (U) (SRNS-RP-2022-00982, REVISION 0, JANUARY 2023) SEMS NUMBER: 71 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-024036.pdf |
| 024032 | 01/05/2023 | IACD-23-118 | DOE SUBMITTAL OF THREE PARTY SIGNED SIXTH FIVE YEAR REMEDY REVIEW REPORT FOR SAVANNAH RIVER SITE OPERABLE UNITS WITH GEOSYNTHETIC OR STABILIZATION/SOLIDIFICATION COVER SYSTEMS (U) AIKEN, SOUTH CAROLINA (SRNS-RP-2021-04229, REVISION 1, JULY 2022) SEMS NUMBER: 00 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-024032.pdf |
| 024038 | 01/11/2023 | IACD-23-119 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE EFFECTIVENESS MONITORING REPORT FOR THE MONITORED NATURAL ATTENUATION (MNA) AT THE CHEMICALS, METALS, AND PESTICIDES (CMP) PITS OPERABLE UNIT (OU) (U) APRIL 2021 THROUGH MARCH 2022 (SRNS-RP-2022-00342, REVISION 0, JUNE 2022) SEMS NUMBER: 24 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 14 | IRF | ARF-024038.pdf |
| 024047 | 01/19/2023 | IACD-23-120 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE 2021 GROUNDWATER MIXING ZONE REPORT FOR THE R-AREA REACTOR SEEPAGE BASINS/108-4R OVERFLOW BASIN OPERABLE UNITS (SRNS-RP-2022-00212, REVISION 0, JUNE 2022) SEMS NUMBER: 25 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 5 | IRF | ARF-024047.pdf |
| 024046 | 01/19/2023 | IACD-23-121 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE K-AREA BURNING/RUBBLE PIT AND RUBBLE PILE (131-K AND 631-200) (KBRP) AND P-AREA BURNING/RUBBLE PIT (131-P) (PBRP) OPERABLE UNITS DETAILED COMBINED GROUNDWATER MONITORING REPORT (SRNS-RP-2022-00253, REVISION 0, JUNE 2022) SEMS NUMBERS: 40 AND 59 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 15 | IRF | ARF-024046.pdf |
| 024049 | 01/24/2023 | IACD-23-122 | DOE SUBMITTAL OF SAMPLING AND ANALYSIS PLAN FOR THE A-AREA BURNING/ RUBBLE PITS (731-A, -1A) AND RUBBLE PIT (731-2A) AND THE MISCELLANEOUS CHEMICAL BASIN/ METALS BURNING PIT (731-4A, -5A) OPERABLE UNIT TO EVALUATE THE EFFECTIVENESS OF SOIL VAPOR EXTRACTION SYSTEM AT ACHIEVING REMEDIAL GOALS (U) (SRNS-RP-2022-01080, REVISION 0, JANUARY 2023) SEMS NUMBER: 28 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-024049.pdf |
| 024082 | 02/15/2023 | IACD-23-123 | DOE SUBMITTAL OF THE GROUNDWATER REPORT FOR THE P-AREA GROUNDWATER (PAGW) OPERABLE UNIT (OU) (U) APRIL 2021 THROUGH MARCH 2022 DATA (SRNS-RP-2022-00963, REVISION 0, JANUARY 2023) SEMS NUMBER: 81 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-024082.pdf |
| 024039 | 01/11/2023 | IACD-23-124 | DOE SUBMITTAL OF EXTENSION REQUEST FOR THE SUBMITTAL OF THE D-AREA GROUNDWATER OPERABLE UNIT (NBN) GROUNDWATER MONITORING REPORT FOR CALENDAR YEARS 2021 AND 2022, SEMS NUMBER:63 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 1 | IRF | ARF-024039.pdf |
| 024043 | 01/12/2023 | IACD-23-125 | DOE SUBMITTAL OF THE FEDERAL FACILITY AGREEMENT (FFA) REVISION 1 APPENDIX E, LONG-TERM PROJECTIONS FOR FISCAL YEAR 2023 (PRINT DATE: 01/09/2023) AND SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE FFA REVISION 0 APPENDIX E FOR FISCAL YEAR 2023 (PRINT DATE: 10/26/2022) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 42 | IRF | ARF-024043.pdf |
| 024042 | 01/12/2023 | IACD-23-126 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSE TO THE REGULATORY COMMENT ON THE DECOMMISSIONING PROJECT FINAL REPORT FOR BUILDING 484-13D, D-AREA STORAGE BUILDING (V-PCOR-D-00076, REVISION 0. AUGUST 11, 2022) | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 3 | IRF | ARF-024042.pdf |
| 024051 | 01/24/2023 | IACD-23-127 | DOE SUBMITTAL OF CERTIFIED CLEAN COPY OF THE STATEMENT OF BASIS/PROPOSED PLAN FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (U) (SRNS-RP-2022-00202, REVISION 1, DECEMBER 2022) SEMS NUMBER: 93 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-024051.pdf |
| 024066 | 01/31/2023 | IACD-23-128 | DOE SUBMITTAL OF THE TREATABILITY STUDY DATA REPORT FOR GROUNDWATER INJECTION AND DISCHARGE CANAL NEUTRALIZATION AT THE D-AREA GROUNDWATER OPERABLE UNIT (OU) 2022 DATA AND INFORMATION (U) (SRNS-TR-2023-00009, REVISION 0, JANUARY 2023) SEMS NUMBER: 63 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-024066.pdf |
| 024058 | 01/30/2023 | IACD-23-129 | DOE SUBMITTAL OF NOTIFICATION OF THE REMEDIAL ACTION START DATE FOR THE LOWER THREE RUNS INTEGRATOR OPERABLE UNIT, SEMS NUMBER: 35 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | ARF | ARF-024058.pdf |
| 024076 | 02/08/2023 | IACD-23-130 | DOE SUBMITTAL OF SAVANNAH RIVER SITE?S RESPONSES TO THE REGULATORY COMMENTS ON THE BIENNIAL EFFECTIVENESS MONITORING REPORT (SAMPLING SUMMARY) FOR THE MONITORED NATURAL ATTENUATION AT THE L-AREA SOUTHERN GROUNDWATER OPERABLE UNIT, 2020 THROUGH 2021, (IACD-22-172, DATED AUGUST 25,2022) SEMS NUMBER: 77 | B. HENNESSEY | S. FULMER | CORRESPONDENCE | 3 | IRF | ARF-024076.pdf |
| 024106 | 03/07/2023 | IACD-23-131 | DOE SUBMITTAL OF THE RECORD OF DECISION REMEDIAL ALTERNATIVE SELECTION FOR THE EARLY CONSTRUCTION AND OPERATIONAL DISPOSAL SITE N-1 (NBN), CENTRAL SHOPS SCRAP LUMBER PILE (631-2G), AND BUILDING 690-N, PROCESS HEAT EXCHANGER REPAIR FACILITY (AKA FORD BUILDING) OPERABLE UNIT (SRNS-RP-2022-01284, REVISION 0, MARCH 2023) SEMS NUMBER: 93 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 2 | IRF | ARF-024106.pdf |
| 024118 | 03/16/2023 | IACD-23-132 | DOE SUBMITTAL LETTER OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE 2021 ANNUAL COMPREHENSIVE TNX AREA GROUNDWATER MONITORING AND REMEDIAL ACTION EFFECTIVENESS INTERIM REPORT (U) (SRNS-RP-2022-00627, REVISION 0, AUGUST 2022) SEMS NUMBERS: 21, 29 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 22 | IRF | ARF-024118.pdf |
| 024117 | 03/15/2023 | IACD-23-133 | DOE SUBMITTAL SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE 2021 GROUNDWATER MIXING ZONE REPORT FOR THE D-AREA OIL SEEPAGE BASIN (631-G) (U) (SRNS-RP-2022-00396, REVISION 0, JULY 2022) SEMS NUMBER: 27 | B. HENNESSEY | J. RICHARDS | CORRESPONDENCE | 8 | IRF | ARF-024117.pdf |
| 024116 | 03/15/2023 | IACD-23-134 | DOE SUBMITTAL OF SAVANNAH RIVER SITE'S RESPONSES TO THE REGULATORY COMMENTS ON THE 488-4D ASH LANDFILL ANNUAL GROUNDWATER MONITORING REPORT- 2021 DATA (SRNS-RP-2022-00559, REVISION 0, JULY 2022) SEMS NUMBER 63 | B. HENNESSEY | S. FULMER | CORRESPONDENCE | 11 | IRF | ARF-024116.pdf |
| 024530 | 04/15/2024 | IOD-24-005 | DOE SUBMITTAL OF U. S. DEPARTMENT OF ENERGY NOTIFICATION OF PROPOSED LEASE(S) FOR CARBON POLLUTION-FREE ELECTRICITY PROJECTS AT THE SAVANNAH RIVER SITE (SRS) | AVERY HAMMETT | SUSAN FULMER JON RICHARDS | CORRESPONDENCE | 74 | IRF | ARF-024530.pdf |
| 024128 | 03/02/2023 | IUO-2021-00001 | COMPLETED POST CLOSURE MAINTENANCE REGISTER FOR ER-IDS-019-040 (DATED 3/5/2021) LOWER THREE RUNS INTEGRATOR OPERABLE UNIT FOR FOUR PUBLIC ROAD CROSSING | C. CARTER | SUPPORTING DOCUMENT | 1 | IRF | ARF-024128.pdf |